If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-005-24197 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.9,"lon":-82.23,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashland | |
Municipality: Montgomery Township | |
Operator Name: MFC DRILLING INC | |
Well Pad ID: | |
Farm/Lease Name: KETTERING UNIT | |
License Status: Producing | |
License Date: 2017-10-23 | |
Spud Date: 2017-11-10 | |
Spud Drilling Contractor: H A D INC | |
Final Drill Date: 2017-11-21 | |
Well Total Depth: 4819.00 ft | |
Configuration: Vertical | |
Latitude: 40.900000 | |
Longitude: -82.230000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-10-23 | Proposed Formations:TREMPEALEAU B ZONE, Issued Date:10/23/2017, Expired Date:10/23/2019 12:00:00 PM, Drilling unit acres:180, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2017-11-21 | |
Record Last Modified | 2018-04-05 | |
Construction Permit Expires | 2019-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
4736 | 4742 | 0 | |
4778 | 4783 | 0 | |
4736 | 4742 | 0 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | MFC DRILLING INC | 0.00 | 0.00 | 81 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | MFC DRILLING INC | Brine | 154 | 81 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1077130760 | 2018-5-10 0:00: | DD | No Violations | |
-117662058 | 2018-8-13 0:00: | PL | No Violations | |
-1392276686 | 2018-6-12 0:00: | DD | No Violations | |
-1396578877 | 2017-11-17 0:00 | DD | No Violations | |
-1844793133 | 2017-11-14 0:00 | DD | No Violations | |
-804269292 | 2017-11-29 0:00 | DD | No Violations | |
-90189088 | 2017-11-21 0:00 | DD | No Violations | |
0090189088 | 2017-11-21 | Drill / Deepen / Reopen | No Violations | HAD reached total depth at 4814 feet. The hole was circulated to condition the wellbore prior to tripping the bit out of the hole. The well is going to be logged prior to running 4.5 inch casing. |
0117662058 | 2018-08-13 | Preliminary Restoration | No Violations | MFC is still working on connecting flow line at the location. Topsoil needs to be finish graded around the disturbed area to complete restoration. |
0518184818 | 2017-12-01 | Drill / Deepen / Reopen | No Violations | MFC is on location solidifying drill cuttings. One load of dehydrated lime was delivered during inspection. A second load is en route but wont arrive until approximately 3:30 pm. Pit closure will be finished following solidification. |
0735243689 | 2017-11-20 | Drill / Deepen / Reopen | No Violations | HAD is drilling on fluid at 4550 feet. Randy Matheney of MFC on location. The rig crew was adjusting fluid weight in the pits. Heavy rain over the weekend added fresh water to the pits. |
0804269292 | 2017-11-29 | Drill / Deepen / Reopen | No Violations | MFC is closing the pits and grading the location. Water has been hauled off of the drill cuttings in the pits. The pits are going to be solidified. |
0850343292 | 2017-11-16 | Drill / Deepen / Reopen | No Violations | HAD is drilling on fluid at 2300 feet. The landowner arrived during inspection. |
1077130760 | 2018-05-10 | Drill / Deepen / Reopen | No Violations | No personnel are on location. There is a water tank at the location. Topsoil needs to be spread on the disturbed area and the road needs to be surfaced with stone. Ground conditions are muddy. |
1211647207 | 2018-08-09 | Preliminary Restoration | No Violations | MFC personnel are on location installing sales line and repairing field tile. Topsoil needs to be finish graded to finish preliminary restoration. |
1392276686 | 2018-06-12 | Drill / Deepen / Reopen | No Violations | Bakerwell service rig is on the well. The rig crew is rigging up a power swivel to drill out the well for completion. The surface location is muddy. MFC personnel Randy Matheney and Nick were on location. A dozer is also on location. |
1396578877 | 2017-11-17 | Drill / Deepen / Reopen | No Violations | HAD is making a bit trip to change over to a PDC bit. Drilling has proceeded through the Clinton formation. |
1510258599 | 2017-11-08 | Drill / Deepen / Reopen | No Violations | HAD Drilling is moving in on the location. Water is being hauled to the pits on location from a stream on the property. The water was checked for chlorides and measured 1.8 on a low range Quantab test strip. The reading equals 48 ppm. |
1528388028 | 2018-06-07 | Drill / Deepen / Reopen | No Violations | Bakerwell service rig is rigging up on the well. There is a portable tank on location. The operator attempted to perforate production casing and found cement on top of the wiper plug. Bakerwell is going to clean out the well to total depth and the casing will be perforated prior to stimulation of the well. |
1529080154 | 2018-06-15 | Drill / Deepen / Reopen | No Violations | Bakerwell service rig is on the well. Randy Matheney of MFC is on location. The service rig crew was installing tubing following perforating the production casing when the well started to flow gas. Tubing is installed to 1600 feet. The rig crew installed a valve on the tubing and shut the well in. Tubing is chained down and secured in the elevators on the rig. The operator is going to kill the well on Monday. Flowback from the production casing was contained to a half tank on location. |
1531338752 | 2018-07-11 | Preliminary Restoration | No Violations | MFC is on location finish grading the location. Flowline and production equipment are being installed. |
1531407368 | 2018-07-12 | Preliminary Restoration | No Violations | No personnel were working on location. MFC equipment is on site. A 100 barrel tank and heated separator have been placed at the location. MFC needs to finish spreading topsoil and surfacing the access road. |
1531503330 | 2018-07-13 | Preliminary Restoration | No Violations | The operator has connected the 100 barrel tank and production unit to the well. A contractor was on location building containment around the tank battery. |
1535460533 | 2018-08-27 | Drill / Deepen / Reopen | No Violations | No personnel were on site during inspection. The operator has finished installing sales line and production equipment at the location. The location needs to be finish graded to complete restoration of the disturbed area. MFC was contacted following inspection to determine their plans for completing preliminary restoration. Randy stated the equipment crew is finishing up pipeline installation and will be moving to 4198 next. |
1808306698 | 2017-11-22 | Drill / Deepen / Reopen | No Violations | Arrived for production casing cement job. The job was not witnessed. The job was originally scheduled for the evening of 11/21/17 and pushed back to after midnight. At 2 am, the operator advised that the job would not occur until morning with no specific time given. On inspector arrival at 8:50 am, the job was completed. Randy of MFC on location. |
1844793133 | 2017-11-14 | Drill / Deepen / Reopen | No Violations | HAD is drilling on fluid at 1500 feet. |
1852481337 | 2018-06-14 | Drill / Deepen / Reopen | No Violations | Bakerwell service rig is on the well. The rig completed cleaning out the production casing to the wiper plug and they are pulling the tubing and bit out. Appalachian Well Service is scheduled to perforate the production casing at 2pm. Acid was spotted on the bottom of the hole. |
518184818 | 2017-12-1 0:00: | DD | No Violations | |
735243689 | 2017-11-20 0:00 | DD | No Violations | |
850343292 | 2017-11-16 0:00 | DD | No Violations |
For data sources see[8]