34-005-24199

Well Details

Well ID: 34-005-24199
Loading map...
Country: United States
State: Ohio
County: Ashland
Municipality: Green Township
Operator Name: CABOT OIL & GAS CORPORATION
Well Pad ID:
Farm/Lease Name: KAMENIK T
License Status: Final Restoration
License Date: 2018-04-04
Spud Date: 2018-06-10
Spud Drilling Contractor: PRECISION DRILLING
Final Drill Date: 2018-07-08
Well Total Depth: 5500.00 ft
Configuration: Vertical
Latitude: 40.720000
Longitude: -82.330000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-04-04 Proposed Formations:ROME, Issued Date:4/4/2018, Expired Date:4/3/2020 12:00:00 PM, Drilling unit acres:139.951, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2018-04-13 CORRECTION TO LEASE NAME.
Original Spud 2018-06-10
Reached Total Depth 2018-07-08
Plugged Back 2018-07-12
Completion Report Received 2018-09-06
Record Last Modified 2018-09-07
Construction Permit Expires 2020-04-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-10-01 5130 5260 0
2018-10-01 9025 9030 0
9025 9030 0
5130 5260 0
5130 5260 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/13/2018 09/17/2018 4877 3,566,770.0 0
2 11/14/2018 11/14/2018 4877 4260 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (15%) Keane Acidizing Anhydrous hydrochloric acid 7647-01-0 15 0.16164 57002
Water 7732-18-5 85 0.91598 323014
Flowback Control, KPFC-1 Keane Flowback Control Dipropylene glycol monomethyl ether 34590-94-8 12 0.00615 2169
2-acrylamido-2-methylpropanesulphonic acid 15214-89-8 5 0.00256 904
1,2- Ethanediol 107-21-1 32 0.0164 5784
Pyridine, alkyl derivatives 68391-11-7 65 0.03332 11750
PROPRIETARY PROPRIETARY 5 0.00256 904
Delayed Breaker, Encap LP Keane Delayed Breaker Crystallilne silica 14808-60-7 10 0.00096 339
Ammonium persulfate 7727-54-0 77 0.0074 2610
PROPRIETARY PROPRIETARY 12 0.00115 407
Friction Reducer, KFR-36 Keane Friction Reducer (Mineral oil) Light hydrotreated petroleum distillate 64742-47-8 60 0.21371 75364
Iron Control, KFEAC-20/30 Keane Iron Control Citric acid 77-92-9 30 0.00249 877
Acetic acid 64-19-7 5 0.00041 146
Biocide, MBC-516 Keane Biocide Didecyldimethylammonium chloride 7173-51-5 7.97 0.00074 263
Glutaral 111-30-8 26.7 0.00249 880
Water 7732-18-5 56.72 0.0053 1869
Quaternary ammonium compound 68424-85-1 5.31 0.0005 175
Ethanol 64-17-5 2.8 0.00026 92
Acid Inhibitor, KAI-12 Keane Acid Inhibitor Formic acid 64-18-6 10 0.00012 41
Ethylene glycol 107-21-1 40 0.00047 165
Cinnamaldehyde 104-55-2 10 0.00012 41
Dipropylene glycol monomethyl ether 34590-94-8 20 0.00023 83
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.00012 41
Alcohols, C12-15 linear, ethoxylated 68131-39-5 10 0.00012 41
Isopropyl alcohol 67-63-0 5 0.00006000 21
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 84.4049 29,764,700.0
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor Water 7732-18-5 95 0.0118 4162
Diethylenetriaminepenta(methylenephosphonic) acid 15827-60-8 15 0.00186 657
Surfactant, KS-15 Keane Surfactant Water 7732-18-5 65 0.04833 17043
PROPRIETARY PROPRIETARY 15 0.01115 3933
Methanol 67-56-1 30 0.02231 7866
Sand (Proppant) Keane Proppant Crystallilne silica 14808-60-7 100 13.9948 4,935,140.0
2 Acid Inhibitor, KAI-12 Keane Acid Inhibitor dipropylene gylcol, monomethyl ether 34590-94-8 20 0.0455794 17.725
isoproyl alcohol 67-63-0 5 0.0113949 4.431
Ethylene glycol 107-21-1 40 0.0911589 35.45
Cinnamaldehyde 104-55-2 10 0.0227897 8.862
Ethoxylated alcohol 68131-39-5 10 0.0227897 8.862
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.0227897 8.862
formic acid 64-18-6 10 0.0227897 8.862
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 91.4164 35549.7
Other Chemical(s) Listed Above See Trade Name(s) List Citric acid 77-92-9 30 0.192361 74.805
formic acid 64-18-6 10 0.0227897 8.862
Cinnamaldehyde 104-55-2 10 0.0227897 8.862
isoproyl alcohol 67-63-0 5 0.0113949 4.431
Water 7732-18-5 85 6.55735 2550
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.0227897 8.862
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.0455794 17.725
Ethoxylated alcohol 68131-39-5 10 0.0227897 8.862
Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 1.15718 450
Water 7732-18-5 85 6.55735 2550
Iron Control, KFEAC-20/30 Keane Iron Control Citric acid 77-92-9 30 0.192361 74.805
Acetic acid 64-19-7 5 0.0320601 12.467

For data sources see[4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 CABOT OIL & GAS CORPORATION Brine 68942 40

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1251064274 2018-7-11 0:00: DD No Violations
-1282040502 2018-8-23 0:00: DD No Violations
-1291018685 2019-2-12 0:00: PW No Violations
-130788682 2019-9-16 0:00: PB No Violations
-1308974560 2018-6-15 0:00: DD No Violations
-1524541475 2018-7-9 0:00:0 DD No Violations
-1525992698 2018-6-14 0:00: DD No Violations
-199384008 2019-9-11 0:00: PB No Violations
-2134888999 2019-9-12 0:00: PB No Violations
-410878139 2020-2-5 0:00:0 PB No Violations
-439129685 2019-4-5 0:00:0 PW No Violations
-509872089 2018-8-24 0:00: DD No Violations
-560069215 2018-6-20 0:00: DD No Violations
-814108679 2018-9-20 0:00: DD No Violations
0130539050 2018-08-08 Drill / Deepen / Reopen No Violations Cabot has moved in the stimulation contractor at the location. A portable fresh water tank has been constructed on location. Keane is the stimulation contractor. The first stage is going to be pumped through a sliding sleeve tool.
0145865768 2018-08-13 Drill / Deepen / Reopen No Violations Keane is on site and rigged up. The operator advised that the first stage of the stimulation had been pumped. They were doing maintenance on the pump trucks and preparing to perforate stage 2. Fresh water was being hauled to the tank on location.
0288251504 2018-06-08 Surface Facility Construction No Violations The pad construction has been certified by the engineering group. Liner is being installed on the pad surface. The cellar has been set at the well location. The bottom of the cellar is cut out where the well will be spudded. A plate will be welded to the conductor and cellar floor to create a liquid tight seal.
0436156849 2018-06-11 Drill / Deepen / Reopen No Violations HAD Drilling spudded the 20 inch conductor hole over the weekend. Casing was drilled concentrically. The drilling was not witnessed.
0439129685 2019-04-05 Production Wells No Violations Inspected well on 04/05/2019. The location was secure. There were no activities on-site at the time of the inspection, nor any apparent changes since the previous inspection. No problems were noted at the time of the inspection.
0509872089 2018-08-24 Drill / Deepen / Reopen No Violations Fortis Energy service rig is on the well. Baker Hughes is on location with a submersible pump which has been run into the well. The well did not flow back naturally and the operator is preparing to pump fluid out of the well to tanks on location.
0560069215 2018-06-20 Drill / Deepen / Reopen No Violations Precision Drilling is rigging up to drill. The operator stated they will be drilling by 2 pm. At 3:30, the rig crew had the bit in the hole and was preparing to tag the bottom of the conductor casing.
0570051346 2019-01-15 Drill / Deepen / Reopen No Violations Visited location on 01/15/2019 with NW Region Supervisor Steve Ochs to follow-up on a received complaint. The well-site was secure. No evidence of recent activities onsite was present, as no tracks through the snow were noted. No problems were noted at the time of the inspection.
0640535520 2018-07-13 Drill / Deepen / Reopen No Violations Precision Drilling is back to drilling. They are building curve for the lateral at approximately 4500 feet. The first kick plug, which was drilled out, was set 1000 feet too high at 2500 feet. The plug was drilled out and a second plug was set with the top at 3476 feet as designed.
0724580383 2019-05-02 Production Wells No Violations Performed status check on 05/02/2019. The well and location were secure, and no on-site activities were taking place at the time of the inspection. No apparent changes were noted since the previous inspection. No problems were noted at the time of the inspection.
0814108679 2018-09-20 Drill / Deepen / Reopen No Violations The operator is continuing to flow back the well. Gas is being flared through a small flare stack on location.
0953587270 2018-09-11 Drill / Deepen / Reopen No Violations The operator is conducting flowback operations on the well. A flare is installed on the flowback iron. Water is being flowed to tanks on location.
1143344047 2019-9-17 0:00: PB No Violations
1144587558 2019-9-13 0:00: PB No Violations
1211850759 2018-08-29 Drill / Deepen / Reopen No Violations The operator is flowing back the well at 50 barrels per hour via a submersible pump installed in the well. A flare has been installed on the flowback lines for gas and water is being directed to tanks on location.
121894515 2019-9-10 0:00: PB No Violations
1251064274 2018-07-11 Drill / Deepen / Reopen No Violations Precision Drilling drilled out the first kick plug. A new plug was set in the well overnight. The rig is waiting on cement to harden for 24 hours to resume drilling the lateral.
1252170145 2019-03-14 Production Wells No Violations Visited location on 03/14/2019. The location and well were secure, and no activities were occurring on-site. No changes were noted from the prior inspection. No problems were noted at the time of the inspection.
1282040502 2018-08-23 Drill / Deepen / Reopen No Violations Keane has moved off location. Fortis Energy Service has a service rig on the well. Bridge plugs have been drilled out. There is no pressure on the well currently. The Cabot representative on location advised that the rig was waiting on a changeover to be delivered and then flowback operations would start. Baker Hughes is on location with a submersible pump which has been ran in the well.
1291018685 2019-02-12 Production Wells No Violations Inspected production well on 02/12/2019. The well is equipped with a flanged wellhead located within metal fencing, and 1-360 gal plastic tank. The well and location were secure, and well identification was clearly displayed at the lease road entrance. No problems were noted at the time of the inspection.
130539050 2018-8-8 0:00:0 DD No Violations
1308974560 2018-06-15 Drill / Deepen / Reopen No Violations Precision Drilling equipment is being moved in to the location. The drilling rig has not arrived yet. Job trailers are being set up on the pad and support equipment is on site.
1441875390 2018-07-18 Drill / Deepen / Reopen No Violations Precision Drilling is drilling lateral at 6050 feet measured depth. True vertical depth is at 4830 feet.
145865768 2018-8-13 0:00: DD No Violations
1507692274 2019-8-16 0:00: PW No Violations
1524541475 2018-07-09 Drill / Deepen / Reopen No Violations The rig set a kick plug in the well in preparation to drill the lateral. The rig is waiting on cement to set. A bottom hole kick assembly was set in the well at 3476 feet.
1525992698 2018-06-14 Drill / Deepen / Reopen No Violations Precision Drilling is moving in rig equipment on location. Drilling is planned to start over the weekend of the 16 and 17th.
1529498914 2018-06-19 Drill / Deepen / Reopen No Violations The drilling rig is on location and is being rigged up. Aaron Wilhite of Cabot stated they intend to start drilling at midnight. Luke Marsh of Cabot discussed spill response plans and drainage controls on the well pad.
1529688478 2018-06-22 Drill / Deepen / Reopen No Violations The operator requested inspection to witness surface casing at 8 AM. The rig was not ready as planned and the job was rescheduled for 2 PM. The job was then postponed until 6 PM. Halliburton was the cement contractor on site. The well circulated and cement returned to surface. See the casing ticket for details.
1530116852 2018-06-25 Drill / Deepen / Reopen No Violations Precision Drilling is drilling below surface casing at approximately 2100 feet. The rig crew stopped drilling ahead to change bits.
1532970697 2018-07-30 Drill / Deepen / Reopen No Violations The drilling rig has moved out. The operator and contractors are on location moving debris and support equipment. The well is shut in.
1604782663 2019-06-05 Production Wells No Violations Visited location on 06/05/2019 to check on the status of the well. NW Region Supervisor Steve Ochs was also present. No activities were occurring on-site at the time of the inspection, nor were any apparent changes from the previous inspection noted.
1648753051 2018-06-27 Drill / Deepen / Reopen No Violations Precision Drilling had to make a bit trip to change bits. The rig crew is preparing to run back in the hole. Drilling is at 2300 feet near the bottom of the lime.
183456361 2019-7-1 0:00:0 PW No Violations
1853335434 2018-06-21 Drill / Deepen / Reopen No Violations The operator requested inspection to witness surface casing cement. The job was scheduled for 9AM to 12 PM. On arrival, the operator advised that the rig broke down early this morning with approximately 200 feet left to drill and the job was being postponed to the 22nd.
288251504 2018-6-8 0:00:0 SC No Violations
436156849 2018-6-11 0:00: DD No Violations
570051346 2019-1-15 0:00: DD No Violations
640535520 2018-7-13 0:00: DD No Violations
680025378 2020-2-7 0:00:0 PB No Violations
724580383 2019-5-2 0:00:0 PW No Violations
953587270 2018-9-11 0:00: DD No Violations

For data sources see[7]