If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-007-20752 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.87,"lon":-80.61,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashtabula | |
Municipality: Monroe Township | |
Operator Name: CLARENCE K TUSSEL JR LTD | |
Well Pad ID: | |
Farm/Lease Name: DANSEREAU-LITTLE UNIT | |
License Status: Producing | |
License Date: 1976-09-01 | |
Spud Date: 1976-09-28 | |
Spud Drilling Contractor: | |
Final Drill Date: 1976-11-10 | |
Well Total Depth: 3221.00 ft | |
Configuration: Vertical | |
Latitude: 41.870000 | |
Longitude: -80.610000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1976-09-01 | 12 TUSSELL CLARENCE JR GeoDate 9/1/76 |
Oil and Gas | 1976-09-01 | Issued Date 9/1/76 Expired Date Acres 0129000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1976-09-28 | |
Completed | 1976-11-10 | |
Reached Total Depth | 1976-11-10 | |
Record Last Modified | 2013-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3074 | 3079 | 1 |
2006-09-11 | 3051 | 3055 | 1 |
3046 | 3048 | 1 | |
3046 | 3048 | 1 | |
2006-09-11 | 3046 | 3048 | 1 |
2006-09-11 | 3089 | 3093 | 1 |
2006-09-11 | 3122 | 3124 | 1 |
2006-09-11 | 3107 | 3108 | 1 |
2006-09-11 | 3097 | 3103 | 1 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1575 Bbl | 45000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | TUSSEL CLARENCE JR | 17897.00 | 0.00 | 0 |
1986 | TUSSEL CLARENCE JR | 19272.00 | 24.00 | 365 |
1987 | TUSSEL CLARENCE JR | 1930.00 | 17.00 | 365 |
1988 | TUSSEL CLARENCE JR | 2489.00 | 12.00 | 365 |
1990 | TUSSEL CLARENCE JR | 3637.00 | 14.00 | 365 |
1991 | TUSSEL CLARENCE JR | 6997.00 | 0.00 | 365 |
1992 | TUSSEL CLARENCE JR | 4680.00 | 0.00 | 365 |
1993 | TUSSEL CLARENCE JR | 1400.00 | 0.00 | 365 |
1995 | TUSSEL CLARENCE JR | 1032.00 | 0.00 | 365 |
1996 | TUSSEL CLARENCE JR | 1322.00 | 0.00 | 365 |
1997 | TUSSEL CLARENCE JR | 1474.00 | 0.00 | 365 |
1998 | TUSSEL CLARENCE JR | 559.00 | 24.00 | 365 |
1999 | TUSSEL CLARENCE JR | 857.00 | 0.00 | 365 |
2000 | TUSSEL CLARENCE JR | 977.00 | 30.00 | 365 |
2001 | TUSSEL CLARENCE JR | 865.00 | 0.00 | 365 |
2002 | TUSSEL CLARENCE JR | 188.00 | 0.00 | 365 |
2003 | TUSSEL CLARENCE JR | 151.00 | 0.00 | 365 |
2004 | TUSSEL CLARENCE JR | 136.00 | 0.00 | 365 |
2005 | TUSSEL CLARENCE JR | 162.00 | 0.00 | 365 |
2006 | TUSSEL CLARENCE JR | 123.00 | 0.00 | 365 |
2007 | TUSSEL CLARENCE JR | 91.00 | 0.00 | 365 |
2008 | TUSSEL CLARENCE JR | 210.00 | 0.00 | 365 |
2009 | TUSSEL CLARENCE JR | 90.00 | 0.00 | 365 |
2010 | TUSSEL CLARENCE JR | 51.00 | 0.00 | 365 |
2011 | TUSSEL CLARENCE JR | 105.00 | 0.00 | 365 |
2012 | TUSSEL CLARENCE JR | 226.00 | 0.00 | 366 |
2013 | TUSSEL CLARENCE JR | 702.00 | 0.00 | 365 |
2014 | TUSSEL CLARENCE JR | 450.00 | 22.00 | 365 |
2015 | TUSSEL CLARENCE JR | 321.00 | 0.00 | 365 |
2016 | TUSSEL CLARENCE JR | 281.00 | 0.00 | 365 |
2017 | TUSSEL CLARENCE JR | 530.00 | 0.00 | 365 |
2018 | TUSSEL CLARENCE JR | 445.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | TUSSEL CLARENCE JR | Brine | 95 | 0 |
1986 | TUSSEL CLARENCE JR | Brine | 107 | 365 |
1987 | TUSSEL CLARENCE JR | Brine | 105 | 365 |
1988 | TUSSEL CLARENCE JR | Brine | 67 | 365 |
1990 | TUSSEL CLARENCE JR | Brine | 198 | 365 |
1991 | TUSSEL CLARENCE JR | Brine | 173 | 365 |
1992 | TUSSEL CLARENCE JR | Brine | 31 | 365 |
1993 | TUSSEL CLARENCE JR | Brine | 63 | 365 |
1995 | TUSSEL CLARENCE JR | Brine | 36 | 365 |
1996 | TUSSEL CLARENCE JR | Brine | 56 | 365 |
1997 | TUSSEL CLARENCE JR | Brine | 117 | 365 |
1998 | TUSSEL CLARENCE JR | Brine | 46 | 365 |
1999 | TUSSEL CLARENCE JR | Brine | 154 | 365 |
2000 | TUSSEL CLARENCE JR | Brine | 32 | 365 |
2001 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
2002 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
2003 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
2004 | TUSSEL CLARENCE JR | Brine | 17 | 365 |
2005 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
2006 | TUSSEL CLARENCE JR | Brine | 43 | 365 |
2007 | TUSSEL CLARENCE JR | Brine | 30 | 365 |
2008 | TUSSEL CLARENCE JR | Brine | 23 | 365 |
2009 | TUSSEL CLARENCE JR | Brine | 24 | 365 |
2010 | TUSSEL CLARENCE JR | Brine | 35 | 365 |
2011 | TUSSEL CLARENCE JR | Brine | 10 | 365 |
2012 | TUSSEL CLARENCE JR | Brine | 7 | 366 |
2013 | TUSSEL CLARENCE JR | Brine | 58 | 365 |
2014 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
2015 | TUSSEL CLARENCE JR | Brine | 49 | 365 |
2016 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
2017 | TUSSEL CLARENCE JR | Brine | 25 | 365 |
2018 | TUSSEL CLARENCE JR | Brine | 25 | 365 |