If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-007-20859 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.86,"lon":-80.6,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Ashtabula | |
| Municipality: Monroe Township | |
| Operator Name: CLARENCE K TUSSEL JR LTD | |
| Well Pad ID: | |
| Farm/Lease Name: KISTER JOHN C& MARIE J | |
| License Status: Producing | |
| License Date: 1977-08-24 | |
| Spud Date: 1977-10-02 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 1977-12-22 | |
| Well Total Depth: 3240.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.860000 | |
| Longitude: -80.600000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1977-08-24 | 12 TUSSELL CLARENCE JR GeoDate 8/24/77 |
| Oil and Gas | 1977-08-24 | Issued Date 8/24/77 Expired Date Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
| Original Spud | 1977-10-02 | |
| Completed | 1977-12-22 | |
| Reached Total Depth | 1977-12-22 | |
| Completion Report Received | 1978-05-05 | |
| Record Last Modified | 2013-10-03 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2006-09-11 | 3125 | 3146 | 0 |
| 3125 | 3146 | 0 | |
| 3125 | 3146 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 1650 Bbl | 59900 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1985 | TUSSEL CLARENCE JR | 4183.00 | 0.00 | 0 |
| 1986 | TUSSEL CLARENCE JR | 4002.00 | 19.00 | 365 |
| 1987 | TUSSEL CLARENCE JR | 3713.00 | 0.00 | 365 |
| 1988 | TUSSEL CLARENCE JR | 3475.00 | 0.00 | 365 |
| 1990 | TUSSEL CLARENCE JR | 3304.00 | 0.00 | 365 |
| 1991 | TUSSEL CLARENCE JR | 2929.00 | 0.00 | 365 |
| 1992 | TUSSEL CLARENCE JR | 2815.00 | 0.00 | 365 |
| 1993 | TUSSEL CLARENCE JR | 3123.00 | 0.00 | 365 |
| 1995 | TUSSEL CLARENCE JR | 2697.00 | 0.00 | 365 |
| 1996 | TUSSEL CLARENCE JR | 1964.00 | 40.00 | 365 |
| 1997 | TUSSEL CLARENCE JR | 2595.00 | 0.00 | 365 |
| 1998 | TUSSEL CLARENCE JR | 3110.00 | 0.00 | 365 |
| 1999 | TUSSEL CLARENCE JR | 3031.00 | 41.00 | 365 |
| 2000 | TUSSEL CLARENCE JR | 2807.00 | 0.00 | 365 |
| 2001 | TUSSEL CLARENCE JR | 2771.00 | 0.00 | 365 |
| 2002 | TUSSEL CLARENCE JR | 1886.00 | 43.00 | 365 |
| 2003 | TUSSEL CLARENCE JR | 1929.00 | 0.00 | 365 |
| 2004 | TUSSEL CLARENCE JR | 1728.00 | 0.00 | 365 |
| 2005 | TUSSEL CLARENCE JR | 1665.00 | 0.00 | 365 |
| 2006 | TUSSEL CLARENCE JR | 1526.00 | 0.00 | 365 |
| 2007 | TUSSEL CLARENCE JR | 1446.00 | 0.00 | 365 |
| 2008 | TUSSEL CLARENCE JR | 1182.00 | 0.00 | 365 |
| 2009 | TUSSEL CLARENCE JR | 1123.00 | 0.00 | 365 |
| 2010 | TUSSEL CLARENCE JR | 1607.00 | 0.00 | 365 |
| 2011 | TUSSEL CLARENCE JR | 1507.00 | 0.00 | 365 |
| 2012 | TUSSEL CLARENCE JR | 1327.00 | 0.00 | 366 |
| 2013 | TUSSEL CLARENCE JR | 1258.00 | 0.00 | 365 |
| 2014 | TUSSEL CLARENCE JR | 1192.00 | 0.00 | 365 |
| 2015 | TUSSEL CLARENCE JR | 1099.00 | 0.00 | 365 |
| 2016 | TUSSEL CLARENCE JR | 1266.00 | 0.00 | 365 |
| 2017 | TUSSEL CLARENCE JR | 1194.00 | 0.00 | 365 |
| 2018 | TUSSEL CLARENCE JR | 930.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1985 | TUSSEL CLARENCE JR | Brine | 57 | 0 |
| 1986 | TUSSEL CLARENCE JR | Brine | 136 | 365 |
| 1987 | TUSSEL CLARENCE JR | Brine | 76 | 365 |
| 1988 | TUSSEL CLARENCE JR | Brine | 81 | 365 |
| 1990 | TUSSEL CLARENCE JR | Brine | 78 | 365 |
| 1991 | TUSSEL CLARENCE JR | Brine | 77 | 365 |
| 1992 | TUSSEL CLARENCE JR | Brine | 74 | 365 |
| 1993 | TUSSEL CLARENCE JR | Brine | 92 | 365 |
| 1995 | TUSSEL CLARENCE JR | Brine | 71 | 365 |
| 1996 | TUSSEL CLARENCE JR | Brine | 39 | 365 |
| 1997 | TUSSEL CLARENCE JR | Brine | 43 | 365 |
| 1998 | TUSSEL CLARENCE JR | Brine | 102 | 365 |
| 1999 | TUSSEL CLARENCE JR | Brine | 52 | 365 |
| 2000 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
| 2001 | TUSSEL CLARENCE JR | Brine | 23 | 365 |
| 2002 | TUSSEL CLARENCE JR | Brine | 18 | 365 |
| 2003 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
| 2004 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
| 2005 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
| 2006 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
| 2007 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
| 2008 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
| 2009 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
| 2010 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
| 2011 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
| 2012 | TUSSEL CLARENCE JR | Brine | 0 | 366 |
| 2013 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
| 2014 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
| 2015 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
| 2016 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
| 2017 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
| 2018 | TUSSEL CLARENCE JR | Brine | 0 | 365 |