If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-007-24512 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.94,"lon":-80.52,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: AMERICAN ENERGY ASSOCIATES INC | |
Well Pad ID: | |
Farm/Lease Name: CONNEAUT CITY | |
License Status: Producing | |
License Date: 2009-06-03 | |
Spud Date: 2009-08-04 | |
Spud Drilling Contractor: APPALACHIAN DRILLING | |
Final Drill Date: 2009-08-09 | |
Well Total Depth: 2942.00 ft | |
Configuration: Vertical | |
Latitude: 41.940000 | |
Longitude: -80.520000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-06-03 | Proposed Formations:CLINTON/MEDINA, Issued Date:6/3/2009, Expired Date:6/3/2010 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2009-08-09 | |
Completion Report Received | 2010-03-29 | |
Construction Permit Expires | 2010-06-03 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-05-27 | 2737 | 2795 | 30 |
2737 | 2795 | 30 | |
2737 | 2795 | 30 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 52972 Gal | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | AMERICAN ENERGY ASSOCIATES INC | 6461.00 | 0.00 | 227 |
2011 | AMERICAN ENERGY ASSOCIATES INC | 6652.00 | 0.00 | 365 |
2012 | AMERICAN ENERGY ASSOCIATES INC | 5028.00 | 0.00 | 366 |
2013 | AMERICAN ENERGY ASSOCIATES INC | 3890.00 | 0.00 | 365 |
2014 | AMERICAN ENERGY ASSOCIATES INC | 3346.00 | 0.00 | 365 |
2015 | AMERICAN ENERGY ASSOCIATES INC | 3137.00 | 0.00 | 365 |
2016 | AMERICAN ENERGY ASSOCIATES INC | 2925.00 | 0.00 | 365 |
2017 | AMERICAN ENERGY ASSOCIATES INC | 3099.00 | 0.00 | 365 |
2018 | AMERICAN ENERGY ASSOCIATES INC | 2880.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | AMERICAN ENERGY ASSOCIATES INC | Brine | 265 | 227 |
2011 | AMERICAN ENERGY ASSOCIATES INC | Brine | 152 | 365 |
2012 | AMERICAN ENERGY ASSOCIATES INC | Brine | 150 | 366 |
2013 | AMERICAN ENERGY ASSOCIATES INC | Brine | 242 | 365 |
2014 | AMERICAN ENERGY ASSOCIATES INC | Brine | 150 | 365 |
2015 | AMERICAN ENERGY ASSOCIATES INC | Brine | 155 | 365 |
2016 | AMERICAN ENERGY ASSOCIATES INC | Brine | 138 | 365 |
2017 | AMERICAN ENERGY ASSOCIATES INC | Brine | 154 | 365 |
2018 | AMERICAN ENERGY ASSOCIATES INC | Brine | 86 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0357059731 | 2009-08-09 | Drill / Deepen / Reopen | No Violations | On site to wittness several attempts to kill shale gas with no success . |
0943818712 | 2009-08-11 | Drill / Deepen / Reopen | No Violations | Appalachian drilling tried several times to kill shale gas with no success . They then attached bottom collar to bottom of 4.5 production casing and run casing into well through BOP . Production casing was cemented in then shale gas was flared through BOP till rig was removed . After rig was removed , 4 days later Bop was removed and shale gas was vented into atmosphere through 2 tubing 50 from well . |
1207964548 | 2019-10-16 0:00 | PW | No Violations | |
1813257242 | 2009-08-08 | Drill / Deepen / Reopen | No Violations | On site for flaring of shale gas . |
357059731 | 2009-8-9 0:00:0 | DD | No Violations | |
943818712 | 2009-8-11 0:00: | DD | No Violations |
For data sources see[9]