Well Details

Well ID: 34-007-24560
Loading map...
Country: United States
State: Ohio
County: Ashtabula
Municipality: Colebrook Township
Operator Name: US ENERGY OH LLC
Well Pad ID:
Farm/Lease Name: DUMITRAS UNIT
License Status: Producing
License Date: 2017-02-14
Spud Date: 2017-02-28
Spud Drilling Contractor: US ENERGY DRILLING LLC
Final Drill Date: 2017-03-27
Well Total Depth: 6300.00 ft
Configuration: Horizontal
Latitude: 41.520000
Longitude: -80.720000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-02-14 Proposed Formations:WHITE CLINTON, Issued Date:2/14/2017, Expired Date:2/14/2019 12:00:00 PM, Drilling unit acres:346.8, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-03-27
Correction to Well 2017-04-07 UPDATE ACREAGE/DRILL UNIT-ALE
Correction to Well 2017-05-22 UPDATE ACREAGE/TARGET/TAKEPOINTS PER AS-DRILLED PLAT RCVD 5-19-17 ALE
Correction to Well 2017-05-26 as drilled plat recvd
Construction Permit Expires 2019-02-14
Record Last Modified 2019-06-07

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-09-18 4300 4360 50
2017-09-18 6200 6260 50
6200 6260 50
4300 4360 50
4300 4360 50

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2019-06-16 H2O 15 15021 Bbl 4480 Reliance Well Service SEE RECORD FOR DETAILS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 US ENERGY OH LLC 2715.00 920.00 74
2018 US ENERGY OH LLC 6964.00 3301.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 US ENERGY OH LLC Brine 2433 74
2018 US ENERGY OH LLC Brine 4441 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1102208634 2017-7-26 0:00: PL No Violations
-1511474425 2018-5-1 0:00:0 PW No Violations 1.00
-1522599607 2017-2-28 0:00: DD No Violations
-156222368 2017-3-17 0:00: DD No Violations
-1857400187 2017-3-10 0:00: DD No Violations
-197990849 2017-3-6 0:00:0 DD No Violations
-1984214095 2019-6-3 0:00:0 PW No Violations
-2001993226 2017-6-28 0:00: DD No Violations 1.00
-229248965 2017-3-14 0:00: DD No Violations
-348594975 2017-3-20 0:00: DD No Violations
-644796347 2017-10-3 0:00: PW No Violations
-681708554 2017-3-3 0:00:0 DD No Violations
0045152654 2017-03-21 Drill / Deepen / Reopen No Violations I arrived on site to find the drilling rig drilling at 4289 feet in the horizontal portion of the well bore.
0150235625 2017-03-02 Drill / Deepen / Reopen No Violations I arrived on site to find the drilling rig drilling at 281 feet on the surface hole bore.
0156222368 2017-03-17 Drill / Deepen / Reopen No Violations I arrived on site to find the drilling rig was at a depth of 4042 feet. The rig was in the process in tripping the drill pipe from the well to change over to a fluid bit. The well began making fluid which forced them to change from air drilling to fluid drilling.
0197990849 2017-03-06 Drill / Deepen / Reopen No Violations I arrived on site to find the drilling rig was drilling at 2200 feet on the intermediate hole bore.
0229248965 2017-03-14 Drill / Deepen / Reopen No Violations I arrived on site to find the drilling rig was at the depth of 3450 feet and was in the process in tripping the drilling bit from the well.
0348594975 2017-03-20 Drill / Deepen / Reopen No Violations I arrived on site to find the drilling rig was still at a depth of 4042 feet and was still out of the well with the drill pipe. They were waiting on down hole drilling equipment.
0410255202 2017-03-10 Drill / Deepen / Reopen No Violations I arrived on site to find the drilling rig had drilled out the casing shoe and was in the process in tripping the drill pipe from the well. The company was going to shut-down for the weekend after they had removed the drill pipe from the well.
0644796347 2017-10-03 Production Wells No Violations U S Energy personnel was setting the electric pump jack and connecting it to the polish rod. I requested that U S Energy check the stock tanks for adequate capacity once the unit was started. There was approximately 400 barrels of room. No violations identified during this inspection.
0681708554 2017-03-03 Drill / Deepen / Reopen No Violations I was n on site to witness the pressure test on the BOP. They pressured up on the annular space of the drill pipe to 400 PSI and then closed in the annulus for 15 minutes. There was no loss of pressure in the fifteen minutes. The test passed.
1016009492 2017-03-07 Drill / Deepen / Reopen No Violations I arrived on site to find the drilling rig drilling at 2610 feet on the intermediate hole bore.
1102208634 2017-07-26 Preliminary Restoration No Violations I inspected the Dumtiras pad for the preliminary restoration status. I found that the pits were closed. The location was grade to prevent standing water. The road and pads perimeter had not been seeded at the time of my inspection. The timber was stacked on the east side of location per the Landowners request ( source Cary LeShock, U S Energy ). I inquired about the scrub brush and was referred to Harry ( construction manager ). The scrub brush needs to removed or chipped into the woods for habitat. Concrete barriers were placed to isolate the live wells. A 2408 GPU separator was on location awaiting tank battery construction. No violations identified during this inspection.
150235625 2017-3-2 0:00:0 DD No Violations
1511474425 2018-05-01 Production Wells No Violations The Dumitras 1- H well is equipped with electric pumping well. The tank battery was shared with the Dumitras 2- H well ( 34-007-2-4559 ). The tank battery was comprised of three (3) 210 barrel stock tanks and a Gas Production Unit ( GPU ). The tank pad was surrounded by a earthen dike.
1522599607 2017-02-28 Drill / Deepen / Reopen No Violations I arrived on site to find U S Energy drilling rig# 9 drilling the conductor hole. They were 30 feet deep at the time of my inspection.
1857400187 2017-03-10 Drill / Deepen / Reopen No Violations I was on site to witness the pressure test on the blind and pipe rams. They pressured up on the annulus of the drill pipe to 400 PSI and the shut-in the annulus of the drill pipe for 15 minutes. There was no lost of pressure after 15 minutes. The test passed.
2001993226 2017-06-28 Drill / Deepen / Reopen No Violations I performed a site inspection on this location. They are preparing to frac the well. The well are fraced. The pits are in good condition with ample room before over flowing. Location is well maintained and clean.
410255202 2017-3-10 0:00: DD No Violations
45152654 2017-3-21 0:00: DD No Violations

For data sources see[9]