34-013-20271

Well Details

Well ID: 34-013-20271
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Sunsbury Township
Operator Name: YONTZ OIL & GAS LLC
Well Pad ID:
Farm/Lease Name: TRUEX GLENN F & ALTA
License Status: Producing
License Date: 1969-04-10
Spud Date: 1969-04-08
Spud Drilling Contractor:
Final Drill Date: 1969-04-26
Well Total Depth: 1485.00 ft
Configuration: Vertical
Latitude: 39.860000
Longitude: -81.080000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1969-04-08
Completed 1969-04-26
Reached Total Depth 1969-04-26
Change of Owner 2018-06-12 Operator changed from 2356, YONTZ JAMES to 10153, YONTZ OIL & GAS LLC
Record Last Modified 2018-06-12

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 1406 1410 12
1406 1410 12
1406 1410 12

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 0 0 SD. FRAC. KEENER FORM.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1995 YONTZ JAMES 0.00 58.00 220
2003 YONTZ JAMES 0.00 46.00 365
2004 YONTZ JAMES 0.00 32.00 365
2005 YONTZ JAMES 0.00 29.00 365
2006 YONTZ JAMES 0.00 18.00 365
2007 YONTZ JAMES 0.00 46.00 365
2008 YONTZ JAMES 0.00 23.00 365
2009 YONTZ JAMES 0.00 17.00 365
2010 YONTZ JAMES 0.00 21.00 365
2011 YONTZ JAMES 0.00 30.00 365
2012 YONTZ JAMES 0.00 45.00 366
2013 YONTZ JAMES 0.00 50.00 365
2015 YONTZ JAMES 0.00 82.00 365
2016 YONTZ JAMES 0.00 36.00 365
2017 YONTZ JAMES 0.00 19.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1995 YONTZ JAMES Brine 40 220
2003 YONTZ JAMES Brine 0 365
2004 YONTZ JAMES Brine 0 365
2005 YONTZ JAMES Brine 0 365
2006 YONTZ JAMES Brine 0 365
2007 YONTZ JAMES Brine 0 365
2008 YONTZ JAMES Brine 0 365
2009 YONTZ JAMES Brine 35 365
2010 YONTZ JAMES Brine 10 365
2011 YONTZ JAMES Brine 45 365
2012 YONTZ JAMES Brine 20 366
2013 YONTZ JAMES Brine 0 365
2015 YONTZ JAMES Brine 35 365
2016 YONTZ JAMES Brine 15 365
2017 YONTZ JAMES Brine 15 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0719333814 2015-03-23 Production Wells No Violations Status check inspection found the following equipment present at the wellhead 4.5 production casing- 2.875 liner - 1.5 tubing and pumping rods with the well set up to produce fluid only and the casing venting the gas at the wellhead. A single 100 barrel production tank is present on location near the wellhead with a fluid knock out separator located on top of the production tank.
1202031763 2020-3-18 0:00: PW No Violations 0.50
1510179281 2017-11-08 Production Wells No Violations Status check inspection as a response to a complaint filed by the landowner Diane Kinney who indicated that a well tank on the property was overflowing and leaking into a nearby stream. I arrived at 13:00 pm to assist the lead County Inspector Andrew Corder and ODNR Emergency responder Jason Blocker. Upon inspection of the well the well was observed to be equipped with 4.5 diameter production casing with a 2.875 diameter inner isolation string and 1.900 diameter production tubing. There is pumping rods inserted inside the production tubing and the only production flowline present is attached to the production tubing head with no valve on the tubing flow line. The well is set up to be produced by the means of a electrically driven pumping unit set on a automatic timer. On location near the well head is the production facility consisting on 2 production tanks one being of steel construction and one being plastic, both tanks are of the same approximate capacity of 100 barrels volume and the steel tank was observed to be overflowing with what appeared to be the same consistency of crude oil. Both tanks were situated inside a small earthen dike that was free from standing fluid, also noted was the oil running from the tank could be seen running to the lowest elevation point in the dike and not staying above grade level. Directly below the production facility is a wet weather stream bed that has flowing surface water currently present with a visible oil sheen on the surface. I place oil boom filter socks in 2 locations and oil absorbent 2 x 2 pad downstream for approximately 100 yards to stop the down stream migration of product from the well. Also noted was at a location in the stream be of a coordinates of 39.86869 X 81.08365 oil could be seen entering the stream from what appeared to be a underground source later identified as a 4 corrugated plastic pipe that was traced back to the inside of the tank battery dike area low elevation area. The registered owner identifie
1510758686 2017-11-08 Production Wells Violations Noted I received a call from Scott King of the Emergency Response Group regarding a call that was received on this well. The call came in from Diane Kinney, who is a landowner nearby the well. The caller alleged that there was a noticeable sheen in the nearby stream. I arrived on scene and was accompanied by Inspector Bill Stolarik and Emergency Responder Jason Blocker. Present for the Division of Wildlife was Officer Wesley Feldner and Officer Supervisor Bryan Postlethwait. Present for the Ohio EPA was Aaron Wolfe. It was noted on this day that the production area containing one 100-barrel metal production fluid and one 100-
1538415777 2018-10-01 Production Wells No Violations Follow up inspection to a violation issued on 11/08/2017 By Andrew Corder. Upon inspection the well head was observed to be equipped with a 4.5 diameter casing head along with a 2.875 intermediate casing string and a 1.5 diameter production tubing string with a 1 diameter tubing line attached to the tubing string only. The 2.875 diameter casing head has a pressure relief device installed. The well is set up to be produced by a pumping unit equipped with an electric motor set on a mechanical timer. On location near the well head is the production fluid facility consisting of (2) production tanks one plastic and one steel. The plastic tank appears to be 80 barrels fluid volume capacity and the steel tank is 100 barrel capacity. The plastic tank is full and the steel tank is empty. Since my last visit the producer has remediated the affected area caused by the last spill incident. The violation is considered resolved and I will send notification to Supervisor Mike Moreland and request the violation be closed.
719333814 2015-3-23 0:00: PW No Violations 0.70

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1510758686 US-OH-114297 2017-11-17 Well operation causing pollution and contamination
1510758686 US-OH-114298 2017-11-17 Dike or pit not able to prevent escape of brine or other wastes
1510758686 US-OH-114299 2017-11-17 Failure to keep dike or pit free of brine or other wastes

For data sources see[9]

References