If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20653 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.97,"lon":-80.83,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Mead Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: US-OH-000549 | |
Farm/Lease Name: KALDOR | |
License Status: Producing | |
License Date: 2012-04-09 | |
Spud Date: 2012-06-15 | |
Spud Drilling Contractor: WACO DRILLING | |
Final Drill Date: 2012-11-24 | |
Well Total Depth: 11120.00 ft | |
Configuration: Horizontal | |
Latitude: 39.970000 | |
Longitude: -80.830000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-01-11 | Proposed Formations:UTICA SHALE, Issued Date:1/11/2012, Expired Date:1/10/2014 12:00:00 PM, Drilling unit acres:460.99, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2012-04-09 | Proposed Formations:POINT PLEASANT, Issued Date:4/9/2012, Expired Date:4/9/2014 12:00:00 PM, Drilling unit acres:460.99, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2012-06-08 | CORRECTION TO PROPOSED TOTAL DEPTH, PROPOSED GEOLOGICAL FORMATION AND CASING PROGRAM. |
Reached Total Depth | 2012-11-24 | |
Correction to Well | 2013-03-08 | CORRECTION TO TARGET INFORMATION, FOOTAGE AND X, Y COORDINATES FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 460.99 ACRES. |
Completion Report Received | 2013-04-17 | |
End of Confidential Data | 2013-11-24 | |
Construction Permit Expires | 2014-04-09 | |
Correction to Well | 2015-12-25 | Change in acreage per as-drilled plat. Updated to 553.6817 AC-ALE |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 02/12/2013 | 02/12/2013 | 5815.0 | 5350380.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Biocide - MC 8520 | Multi-Chem | Biocide | Whole Product | None | None | ||
Acid - 7.5 HCl Acid | Universal | Acid | Whole Product | None | None | |||
Water | water | 7732-18-5 | 100.0 | 87.090319 | ||||
Water | 7732-18-5 | 30.0 | 0.001872 | |||||
4,4 -Dimethyloxazolidine | 51200-87-4 | 95.0 | 0.008849 | |||||
Not hazardous | 70.0 | 0.004369 | ||||||
3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.5 | 0.000419 | |||||
Glutaraldehyde | 111-30-8 | 60.0 | 0.002763 | |||||
Hydrotreated light distillates (10-30) | 64742-47-8 | 30.0 | 0.014752 | |||||
Other -(non hazardous) | 100.0 | 0.008107 | ||||||
2-Amino-2-Methyl-1-Propanol | 124-68-5 | 0.5 | 0.00004700 | |||||
Other -(non hazardous) | 70.0 | 0.034422 | ||||||
Hydrochloric Acid (15-40) blended down to 7.5 | 7647-01-0 | 7.5 | 0.036267 | |||||
Other -(non hazardous) | 92.5 | 0.447294 | ||||||
Other -(non hazardous) | 40.0 | 0.001842 | ||||||
Clay Stabilizer - ClaChek G | Shrieve | Clay Stabilizer | None | None | ||||
Scale Inhibitor - MC-MX-588-2 | Multi-Chem | Scale Inhibitor | Whole Product | None | None | |||
Biocide - MC 8650 | Multi-Chem | Biocide | Whole Product | None | None | |||
Sand | Proppant | sand | 14808-60-7 | 100.0 | 12.34868 | |||
Friction Reducer - MC MX-14-5 | Multi-Chem | Friction Reducer | Whole Product | None | None |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 8 | 6933 Bbl | 385844 | STAGE 17
60 SHOTS | ||
H2O | 8 | 6885 Bbl | 377444 | STAGE 14
60 SHOTS | ||
H2O | 8 | 7677 Bbl | 353619 | STAGE 6
60 SHOTS | ||
H2O | 8 | 6933 Bbl | 385844 | STAGE 16
60 SHOTS | ||
2013-02-12 | H2O | 8 | 9787 Bbl | 396749 | STAGE 1
60 SHOTS | |
H2O | 8 | 8388 Bbl | 511845 | STAGE 7
60 SHOTS | ||
H2O | 8 | 9269 Bbl | 382400 | STAGE 2
60 SHOTS | ||
H2O | 8 | 7069 Bbl | 335515 | STAGE 5
60 SHOTS | ||
H2O | 8 | 7348 Bbl | 386144 | STAGE 9
60 SHOTS | ||
H2O | 8 | 6851 Bbl | 370669 | STAGE 11
60 SHOTS | ||
H2O | 8 | 6937 Bbl | 375844 | STAGE 15
60 SHOTS | ||
H2O | 8 | 7068 Bbl | 374356 | STAGE 12
60 SHOTS | ||
H2O | 8 | 9990 Bbl | 382626 | STAGE 3
60 SHOTS | ||
H2O | 8 | 4730 Bbl | 203174 | STAGE 8
60 SHOTS | ||
H2O | 8 | 7389 Bbl | 360188 | STAGE 4
60 SHOTS | ||
H2O | 8 | 6883 Bbl | 379326 | STAGE 10
60 SHOTS | ||
H2O | 8 | 6917 Bbl | 376894 | STAGE 13
60 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | XTO ENERGY INC. | 167834 | 16135 | 331 |
2015 | XTO ENERGY INC. | 134840 | 5370 | 211 |
2016 | XTO ENERGY INC. | 42355 | 1580 | 57 |
2017 | XTO ENERGY INC. | 0 | 0 | 0 |
2018 | XTO ENERGY INC. | 132741 | 4763 | 211 |
2019 | XTO ENERGY INC. | 15814 | 710 | 55 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | XTO ENERGY INC. | Brine | 21023 | 331 |
2015 | XTO ENERGY INC. | Brine | 4402 | 211 |
2016 | XTO ENERGY INC. | Brine | 149 | 57 |
2017 | XTO ENERGY INC. | Brine | 0 | 0 |
2018 | XTO ENERGY INC. | Brine | 2718 | 211 |
2019 | XTO ENERGY INC. | Brine | 379 | 55 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1048121181 | 2013-1-31 0:00: | CT | No Violations | 0.50 |
-1416092894 | 2012-10-19 0:00 | DD | No Violations | 0.50 |
-1481130018 | 2012-10-25 0:00 | DD | No Violations | |
-1495296578 | 2013-2-13 0:00: | CT | No Violations | 2.50 |
-1555755015 | 2013-3-14 0:00: | AM | No Violations | 0.50 |
-1559079057 | 2013-2-27 0:00: | CT | No Violations | 1.50 |
-1587832858 | 2013-2-26 0:00: | CT | No Violations | 1.00 |
-172631786 | 2012-11-21 0:00 | DD | No Violations | 2.00 |
-1728737064 | 2012-11-21 0:00 | DD | No Violations | 4.00 |
-2050991984 | 2013-2-20 0:00: | CT | No Violations | 2.00 |
-281274751 | 2018-7-16 0:00: | PW | No Violations | 0.50 |
-374327213 | 2013-1-24 0:00: | CT | No Violations | 0.50 |
-377426721 | 2012-11-23 0:00 | DD | No Violations | |
-521344407 | 2013-5-16 0:00: | PL | No Violations | |
-711262759 | 2016-1-26 0:00: | PW | No Violations | |
-739897619 | 2013-2-14 0:00: | CT | No Violations | 3.00 |
0109806723 | 2012-11-01 | Drill / Deepen / Reopen | No Violations | On the day of my inspection the rig was drilling in the lateral section at 13429ft. No violations were noted. |
0172631786 | 2012-11-21 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Precision was drilling at 9970ft and were planning to reach total depth by Saturday. No violations noted. |
0281274751 | 2018-07-16 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a four-string casing design, 5.5-inch diameter production casing and 2.875 inch diameter tubing that appeared to be open flowing with no artificial lift technology. Annular pressure monitoring was in place on both the 13.325-inch diameter surface casing and the 9.625-inch diameter deep intermediate casing, pressures were monitored with transducers with no ability to read pressures at the well head. Both casings had bleed down lines ran to the production fluid tanks, at the time of my inspection the 13.375-inch diameter casing was open flowing into tanks through a choke manifold. Production equipment included a Gas Processing Unit, that was inside of containment. There were also 4- 400-barrel production fluid tanks inside containment. Production fluid tanks were all shared with 34013207760000, 34013206540000. There was also a defoamer injection tank near the well head and production fluid tanks. There was also a gas compressor on the northeast corner of the pad, and a flare stack that had a 6 foot flare at the time of my inspection. There was also a 500 barrel frack tank on location that was no longer hooked up to the wells. Identification tags were present, and production was up to date. No violations were found at the time of my inspection. |
0361175172 | 2013-02-27 | Completion Testing | No Violations | On the day of my inspection the mud had been cleaned and the contaminated soil removed and will be disposed of in a landfill. |
0374327213 | 2013-01-24 | Completion Testing | No Violations | On the day of my inspection basic was moving onto this hole to drill out cement shoe. No violations noted. |
0375593663 | 2012-11-07 | Drill / Deepen / Reopen | No Violations | On the day of my inspection rig was drilling the lateral section at 16,075 ft. TD will be 16,090ft. No violations noted. |
0377426721 | 2012-11-23 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Precision was drilling at 10840ft and were still planning to reach total depth by Saturday. No violations noted. |
0521344407 | 2013-05-16 | Preliminary Restoration | No Violations | On site with local inspector Andrew Corder to look over restoration work preformed at site and I told inspector Corder that once vegetation is fully established restoration work would be satisfactory. |
0711262759 | 2016-01-26 | Production Wells | No Violations | On this day the well was equipped to be considered capable of production. The pad area appeared to be in satisfactory condition. |
0739897619 | 2013-02-14 | Completion Testing | No Violations | On the day of my inspection I was accompanied by Inspector Dave Ball. Universal Well Services was on site stimulating the well. No violations noted. |
1048121181 | 2013-01-31 | Completion Testing | No Violations | On the day of my inspection the company was preparing for fracing operations. The earth pit was being filled with fresh water. Universal was present and company was working with the well head. Fracing anticipated to begin on 02/11/2013. No violations noted. |
109806723 | 2012-11-1 0:00: | DD | No Violations | 1.00 |
1350769989 | 2012-10-18 | Drill / Deepen / Reopen | No Violations | On the day of my inspection rig was still down and waiting on top head drive parts. No violations noted. |
1352984643 | 2012-11-14 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Precision Drilling 228 tagged cement at 4610 and will start drilling after circulating three bottoms up. Kick off will be at 5014. No violations noted. |
1416092894 | 2012-10-19 | Drill / Deepen / Reopen | No Violations | Call from company man that rig had been fixed and they were back to drilling. |
1481130018 | 2012-10-25 | Drill / Deepen / Reopen | No Violations | On the day of my inspection the rig was drilling in the lateral section. No violations were noted. |
1495296578 | 2013-02-13 | Completion Testing | No Violations | On the day of my inspection Universal Well Services was on site stimulating the well. I spoke with Ed Smith of XTO who advised that they will be completing 7 stages and drilling out the plugs after commencement of the stimulation. No violations noted. |
1555755015 | 2013-03-14 | Administrative Inspection | No Violations | Received call from Stan Lowther of XTO. They will be testing BOPs on 03/15/2013. |
1559079057 | 2013-02-27 | Completion Testing | No Violations | I received a call from Todd Snyder of XTO who informed me of a FRESH WATER based mud spill on site. Upon arrival I found that most of the mud was within containment and all was contained on the pad. Buckeye Water services was on site to help with the remediation. |
1587832858 | 2013-02-26 | Completion Testing | No Violations | On the day of my inspection the company was waiting on mud to load the hole and begin pulling tubing. No violations noted. |
1687104599 | 2012-12-17 | Completion Testing | No Violations | On the day of my inspection completion efforts had not begun. There was no activity taking place. No violations noted. |
1728737064 | 2012-11-21 | Drill / Deepen / Reopen | No Violations | Rig is currently drilling at depth of 9972 and the highest gas in unit has been 2200 units. The Measurement while drilling tools were laid out on site. Pulse tool is on bottom. The gamma ray tool , Batteries and then the Brain or the electronics part of the tool is on the top toward the rig. This tool tells where and what is going on at the bit at all times. |
2050991984 | 2013-02-20 | Completion Testing | No Violations | On the day of my inspection the Universal Well Services were stimulating the well. No violations noted. |
361175172 | 2013-2-27 0:00: | CT | No Violations | 1.00 |
375593663 | 2012-11-7 0:00: | DD | No Violations | 2.00 |
For data sources see[9]