If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20683 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.88,"lon":-81.17,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Somerset Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-001245 | |
Farm/Lease Name: INHERST | |
License Status: Producing | |
License Date: 2013-06-17 | |
Spud Date: 2013-05-02 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2014-01-22 | |
Well Total Depth: 18495.00 ft | |
Configuration: Horizontal | |
Latitude: 39.880000 | |
Longitude: -81.170000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-03-07 | Proposed Formations:POINT PLEASANT, Issued Date:3/7/2013, Expired Date:3/7/2015 12:00:00 PM, Drilling unit acres:503.23, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2013-06-17 | Proposed Formations:POINT PLEASANT, Issued Date:6/17/2013, Expired Date:6/17/2015 12:00:00 PM, Drilling unit acres:985.312, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2014-01-22 | |
Completion Report Received | 2014-12-02 | |
Correction to Well | 2014-12-05 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Construction Permit Expires | 2015-06-17 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/16/2014 | 05/06/2014 | 8877 | 14,781,100.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FE-2A | Halliburton | Additive | Citric acid | 77-92-9 | 60 | 0.00412508 | 0 |
FE ACID - >10% HCL | Halliburton | Solvent | Hydrochloric acid | 7647-01-0 | 30 | 0.1787 | 0 | |
SAND - PREMIUM WHITE | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 11.6839 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Methanol | 67-56-1 | 60 | 0.000167732 | 0 | |
Propargyl alcohol | 107-19-7 | 10 | 0.00002796 | 0 | ||||
Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 87.6435 | 0 | |
FR-66 | Halliburton | Friction Reducer | Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.012396 | 0 | |
LP-65MC | Halliburton | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10 | 0.000982002 | 0 | |
FDP-S1078-12 | Halliburton | Friction Reducer | Alcohols, C12-16, ethoxylated | 68551-12-2 | 10 | 0.00568316 | 0 | |
Ammonium chloride | 12125-02-9 | 10 | 0.00568316 | 0 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0170488 | 0 | ||||
9-Octadecenamide, n,n-bis-2(hydroxy-ethyl)-,(Z) | 93-83-4 | 5 | 0.00284158 | 0 | ||||
BE-9 | Halliburton | Biocide | Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.000802837 | 0 | |
Other Purpose | Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 0 | 0.00008387 | 0 | |||
Acetic acid | 64-19-7 | 0 | 0.00595666 | 0 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 0 | 0.002066 | 0 | ||||
Alcohols, C14-C15, ethoxylated | 68951-67-7 | 0 | 0.00008387 | 0 | ||||
Citric acid | 77-92-9 | 0 | 0.00595666 | 0 | ||||
Ammonium chloride | 12125-02-9 | 0 | 0.002066 | 0 | ||||
Organic phosphonate | Confidential | 0 | 0.00589201 | 0 | ||||
Sodium chloride | 7647-14-5 | 0 | 0.002066 | 0 | ||||
Fatty acids, tall oil | Confidential | 0 | 0.00008387 | 0 | ||||
Acetic anhydride | 108-24-7 | 0 | 0.00595666 | 0 | ||||
Water | 7732-18-5 | 0 | 0.638503 | 0 | ||||
Olefins | Confidential | 0 | 0.00000280 | 0 | ||||
Fatty acid tall oil amide | Confidential | 0 | 0.002066 | 0 | ||||
Olefins | Confidential | 0 | 0.00001398 | 0 | ||||
Sorbitan monooleate polyoxyethylene derivative | 9005-65-6 | 0 | 0.000413199 | 0 | ||||
Sorbitan, mono-9-octadecenoate, (Z) | 1338-43-8 | 0 | 0.000413199 | 0 | ||||
Polyacrylamide copolymer | Confidential | 0 | 0.012396 | 0 | ||||
Formaldehyde | 50-00-0 | 0 | 0.00009820 | 0 | ||||
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Acetic anhydride | 108-24-7 | 100 | 0.00596466 | 0 | |
Acetic acid | 64-19-7 | 60 | 0.0035788 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-04-15 | H2O | 15 | 428438 Gal | 447000 | Halliburton | STAGE 1/37
45 SHOTS STAGES 2-36 SEE IMAGES |
2014-05-05 | H2O | 15 | 393831 Gal | 391331 | Halliburton | STAGE 37/37
45 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | GULFPORT ENERGY CORPORATION | 1600024 | 0 | 156 |
2015 | GULFPORT ENERGY CORPORATION | 2861668 | 0 | 352 |
2016 | GULFPORT ENERGY CORPORATION | 1413208 | 0 | 362 |
2017 | GULFPORT ENERGY CORPORATION | 884481 | 0 | 359 |
2018 | GULFPORT ENERGY CORPORATION | 591279 | 0 | 359 |
2019 | GULFPORT ENERGY CORPORATION | 114296 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | GULFPORT ENERGY CORPORATION | Brine | 24273 | 156 |
2015 | GULFPORT ENERGY CORPORATION | Brine | 34816 | 352 |
2016 | GULFPORT ENERGY CORPORATION | Brine | 18457 | 362 |
2017 | GULFPORT ENERGY CORPORATION | Brine | 12042 | 359 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 8817 | 359 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 1850 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1310852455 | 2020-2-25 0:00: | PW | No Violations | 0.30 |
-1450923795 | 2013-4-8 0:00:0 | SC | No Violations | 0.50 |
-1745800703 | 2013-5-30 0:00: | DD | No Violations | |
-19568364 | 2014-3-19 0:00: | DD | No Violations | 1.00 |
-2132628752 | 2013-5-2 0:00:0 | DD | No Violations | 3.00 |
-220691969 | 2013-7-15 0:00: | DD | No Violations | 0.50 |
-479093202 | 2014-1-6 0:00:0 | DD | No Violations | 1.00 |
-583248376 | 2018-9-21 0:00: | PW | No Violations | 0.50 |
-740339993 | 2019-3-18 0:00: | PW | No Violations | 0.30 |
0019568364 | 2014-03-19 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Nomac 311 was almost complete with transit to Duvall. No violations noted. |
0136790795 | 2013-05-02 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Express had moved to this hole and begun drilling the conductor. No violations noted. |
0220691969 | 2013-07-15 | Drill / Deepen / Reopen | No Violations | On the day of my inspection the pad was awaiting rig mobilization to continue drilling operations. No violations noted. |
0479093202 | 2014-01-06 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Nomac was drilling ahead @ 3044. When reached total depth of this section will perform a F.I.T and determine whether or not or run the deep intermediate string of casing. No violations noted. |
0583248376 | 2018-09-21 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with 5.5-inch diameter production casing, and 2.875-inch diameter tubing that appeared to be open flowing. Annular pressure monitoring was in place for the 9.625-inch diameter intermediate casing gauge read 420 pounds per square inch, and the 13.375-inch diameter casing gauge read 420 pounds per square inch. Production equipment included a Sand Separator, Gas Processing unit and 3 400-barrel production fluid tanks, and a 500-barrel condensate tank shared with the other producing wells on the pad. There were multiple Emergency Shutoff Devices on location, Identification tags were present, and production was up to date. |
0740339993 | 2019-03-18 | Production Wells | No Violations | Status check inspection found 3 wells present on the pad. All 3 have been drilled and completed. The said well does have artificial lift technology installed on the production tree. The 5.5 production casing pressure is 500 pounds. Annular pressure monitoring is installed on the well head A&B sections. There is 3 gas processing units present on the pad. The production facility consists of (3) 400 barrel and one 500 barrel steel production tank situated inside a polymer lined steel containment dike area. Proper well identification is installed on the well head with hazard warning labels on the tank battery. The well pad and lease road surface is stone construction and in good repair, the well pad perimeter is protected by an earthen dike. |
1024050991 | 2013-05-30 | Drill / Deepen / Reopen | No Violations | On the day of my inspection there was brine contaminated water escaping the location from the side of the drilling pad. Samples and photos were taken. Permit conditions require proper disposal of such material. |
136790795 | 2013-5-2 0:00:0 | DD | No Violations | 1.00 |
1370603960 | 2013-05-30 | Drill / Deepen / Reopen | Violations Noted | On the day of my inspection there was brine contaminated water escaping the location from the side of the drilling pad. Samples and photos were taken. Gulfport Energy shall remediate all necessary areas to ensure that all contamination has been removed and proper vegetation established to prevent erosion. |
1440060318 | 2017-09-26 | Production Wells | No Violations | This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing without any artificial lift technology present at this time. The well is piped to a gas processing unit and then to the production area. The production area contains three 400-barrel production fluid storage tanks and one 500 barrel storage tank. The production records within the RBDMS system are current to 2017. |
1450923795 | 2013-04-08 | Surface Facility Construction | No Violations | On the day of my inspection there was no activity on the pad. Some equipment still on lease road. No violations noted. |
1457158610 | 2014-01-23 | Drill / Deepen / Reopen | No Violations | On the day of my inspection the well was at total depth. 5.5 casing will be set soon. No violations noted. |
1691826688 | 2013-06-04 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Yost 6 ran 10.34 casing and Stingray cemented. See cement ticket. No violations noted. |
1745800703 | 2013-05-30 | Drill / Deepen / Reopen | Violations Noted | On the day of my inspection there was brine contaminated water escaping the location from the side of the drilling pad. Samples and photos were taken. Gulfport Energy shall remediate all necessary areas to ensure that all contamination has been removed and proper vegetation established to prevent erosion. |
2003258191 | 2013-07-22 | Drill / Deepen / Reopen | No Violations | On the day of my inspection there was no activity on the site. Site is awaiting rig. No violations noted. |
2049681155 | 2014-01-06 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Nomac 311 had skidded to this hole. They were drilling @3044. After this section they plan to run a formation integrity test (F.I.T) and determine whether or not to run a second intermediate casing string. No violations noted. |
2085115190 | 2016-03-14 | Preliminary Restoration | No Violations | On this day I visited this pad to perform a preliminary restoration inspection. The pad appeared to be in satisfactory condition. Vegetation has been established and the erosion and sediment controls appear to be functioning properly. Preliminary restoration for this site has passed. |
2132628752 | 2013-05-02 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Stingray was on location to cement well. See casing ticket. No violations noted. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1370603960 | US-OH-110940 | 2013-06-07 | Dike or pit not able to prevent escape of Brine or other wastes | |
1745800703 | US-OH-117347 | 2014-04-10 | Drilling operation causing pollution and contamination |
For data sources see[9]