If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20754 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.95,"lon":-81.21,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Somerset Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-000884 | |
Farm/Lease Name: BROTHERS | |
License Status: Producing | |
License Date: 2014-03-13 | |
Spud Date: 2014-03-27 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2014-06-17 | |
Well Total Depth: 15546.00 ft | |
Configuration: Horizontal | |
Latitude: 39.950000 | |
Longitude: -81.210000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-02-14 | Proposed Formations:POINT PLEASANT, Issued Date:2/14/2014, Expired Date:2/14/2016 12:00:00 PM, Drilling unit acres:595.833, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2014-03-13 | Proposed Formations:POINT PLEASANT, Issued Date:3/13/2014, Expired Date:3/12/2016 12:00:00 PM, Drilling unit acres:595.833, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-06-17 | |
Completion Report Received | 2015-06-15 | |
Construction Permit Expires | 2016-03-12 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/21/2014 | 09/23/2014 | 8509 | 9,219,000.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Methanol | 67-56-1 | 60 | 0.000277187 | 0 |
Propargyl alcohol | 107-19-7 | 10 | 0.00004620 | 0 | ||||
LCA-1 | Halliburton | Solvent | Paraffinic solvent | Confidential | 100 | 0.00202323 | 0 | |
FE-2A | Halliburton | Additive | Citric acid | 77-92-9 | 60 | 0.00385456 | 0 | |
Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 90.9671 | 0 | |
Halliburton | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10 | 0.00106492 | 0 | ||
BE-9 | Halliburton | Biocide | Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.00087539 | 0 | |
Other Purpose | Organic phosphonate | Confidential | 0 | 0.00638952 | 0 | |||
Olefins | Confidential | 0 | 0.00002369 | 0 | ||||
Fatty acids, tall oil | Confidential | 0 | 0.000138594 | 0 | ||||
Formaldehyde | 50-00-0 | 0 | 0.00010661 | 0 | ||||
Water | 7732-18-5 | 0 | 0.0189909 | 0 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 0 | 0.000138594 | 0 | ||||
Alcohols, C14-C15, ethoxylated | 68951-67-7 | 0 | 0.000138594 | 0 | ||||
Olefins | Confidential | 0 | 0.00000474 | 0 | ||||
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Acetic anhydride | 108-24-7 | 100 | 0.00557454 | 0 | |
Acetic acid | 64-19-7 | 60 | 0.0033452 | 0 | ||||
40/70 White | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 8.88562 | 0 | |
FRA 405 | Operator | Friction Reducer | Alcohol, C12-16, Ethoxilated | 68551-12-2 | 7 | 0.00497 | 0 | |
Ammonium chloride | 12125-02-9 | 7 | 0.00497 | 0 | ||||
Sodium Chloride | 7647-14-5 | 10 | 0.0071 | 0 | ||||
Petroleum Distillate | 64742-47-8 | 40 | 0.0284 | 0 | ||||
Water | 7732-18-5 | 36 | 0.02556 | 0 | ||||
OptiKleen- | Halliburton | Concentrate | Sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.00509065 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-09-22 | H2O | 8 | 238353 Bbl | 260177 | Halliburton | STAGE 32/32
SHOTS |
2014-08-24 | H2O | 15 | 46350 Bbl | 352900 | STAGE 1/32
45 SHOTS STAGES 2-31 SEE IMAGES |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | GULFPORT ENERGY CORPORATION | 761723 | 1290 | 76 |
2015 | GULFPORT ENERGY CORPORATION | 2640139 | 727 | 364 |
2016 | GULFPORT ENERGY CORPORATION | 1192433 | 0 | 362 |
2017 | GULFPORT ENERGY CORPORATION | 747991 | 1 | 361 |
2018 | GULFPORT ENERGY CORPORATION | 533581 | 1 | 340 |
2019 | GULFPORT ENERGY CORPORATION | 98004 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | GULFPORT ENERGY CORPORATION | Brine | 7062 | 76 |
2015 | GULFPORT ENERGY CORPORATION | Brine | 15729 | 364 |
2016 | GULFPORT ENERGY CORPORATION | Brine | 6647 | 362 |
2017 | GULFPORT ENERGY CORPORATION | Brine | 4588 | 361 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 3666 | 340 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 711 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1214006937 | 2020-1-27 0:00: | PW | No Violations | 0.50 |
-1264918859 | 2018-9-13 0:00: | PW | No Violations | 0.50 |
-1275315499 | 2015-1-23 0:00: | PL | No Violations | 0.50 |
-1344922108 | 2018-9-13 0:00: | PW | No Violations | 0.60 |
-1661242823 | 2014-7-29 0:00: | DD | No Violations | 0.50 |
-1802293900 | 2014-6-18 0:00: | CS | No Violations | 3.00 |
-294395456 | 2018-6-5 0:00:0 | PW | No Violations | 0.50 |
-701432656 | 2017-5-30 0:00: | PW | No Violations | 0.50 |
0153424038 | 2014-04-27 | Administrative Inspection | No Violations | Call from operator for spudding the 18.625 section. |
0289219571 | 2014-04-28 | Casing String Witnessed | No Violations | On the day of my inspection the 18.625 casing was ran and cemented. See cement ticket for details. No violations noted. |
0294395456 | 2018-06-05 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with 5.5 inch diameter production casing with a plunger lift system. Annular pressure monitoring was in place for the intermediate casing gauge read 0 pounds per square inch, the surface casing gauge read 250 pounds per square inch. Production equipment included a Separator, Gas Processing unit, production equipment was shared with 34013207520000, 34013207530000. There are 6- 400 barrel purge tanks and a 50 barrel brine storage tank shared with 34013207520000, 34013207530000. Identification tags were present, and production was up to date. No violations were found at the time of my inspection. |
0701432656 | 2017-05-30 | Production Wells | No Violations | An inspection of this site revealed the well was equipped in a manner that made it appear to have the capability of producing. The location included a gas processing unit and a tank battery that consisted of six 400 barrel production tanks. |
1034203076 | 2016-05-26 | Production Wells | No Violations | The well currently appears to be equipped properly to be considered capable of production. The well site appears to be in satisfactory condition. |
1264918859 | 2018-09-13 | Production Wells | No Violations | On site inspection found 3 wells present on the pad. A third party contractor identified as Integrity Services is on location and rigged up on the well with a slick line truck broaching the production tubing on the # 1well preparing the well to be equipped with a plunger lift system. The 2 additional wells on the pad the Brothers # 2 & #3 are equipped with a plunger lift production system. The production equipment consists of a single gas processing unit and production fluid facility consisting of 6 steel tanks capable of holding 400 barrels fluid each. The tanks are situated inside a polymer lined steel containment dike area with hazard warning labels posted. Identification is posted at each well head and signage is posted at the entry point of the lease road. The entry point of the well pad is gated. There is a third party mid stream operation at the entry point of the well pad on the right side. The lease road and well pad surface are of stone construction and in good repair. The Divisions Engineering section is addressing a slip on the South slope of the well pad. |
1275315499 | 2015-01-23 | Preliminary Restoration | No Violations | The preliminary restoration for this well is completed. The pad is in satisfactory condition with proper erosion and sedimentation controls in place. Company shall continue to monitor the location to ensure the pad remains in satisfactory condition. Preliminary restoration passed. |
1344922108 | 2018-09-13 | Production Wells | No Violations | On site inspection found 3 wells present on the pad. A third party contractor identified as Integrity Services is on location and rigged up on the well with a slick line truck broaching the production tubing on the # 1well preparing the well to be equipped with a plunger lift system. The 2 additional wells on the pad the Brothers # 2 & #3 are equipped with a plunger lift production system. The production equipment consists of a single gas processing unit and production fluid facility consisting of 6 steel tanks capable of holding 400 barrels fluid each. The tanks are situated inside a polymer lined steel containment dike area with hazard warning labels posted. Identification is posted at each well head and signage is posted at the entry point of the lease road. The entry point of the well pad is gated. There is a third party mid stream operation at the entry point of the well pad on the right side. The lease road and well pad surface are of stone construction and in good repair. The Divisions Engineering section is addressing a slip on the South slope of the well pad. |
1520621514 | 2018-03-01 | Production Wells | No Violations | The well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit. From there, it is routed to a production area that contains six 400-barrel production fluid holding tanks. The production records within RBDMS are currently updated to 2017. |
153424038 | 2014-4-27 0:00: | AM | No Violations | 0.50 |
1661242823 | 2014-07-29 | Drill / Deepen / Reopen | No Violations | On the day of my inspection the rig had mobilized and the containment was being removed and disposed of. The rig mats were being sanitized and moved to another location. No violations noted. |
1802293900 | 2014-06-18 | Casing String Witnessed | No Violations | On the day of my inspection Nomac 310 had reached total depth and the 5.5 casing was being run and would be cemented soon. No violations noted. |
288926585 | 2020-2-10 0:00: | PW | No Violations | 0.20 |
289219571 | 2014-4-28 0:00: | CS | No Violations | |
343458092 | 2020-10-26 0:00 | PW | No Violations | 0.20 |
For data sources see[9]