If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20767 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40,"lon":-80.89,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Richland Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: US-OH-000548 | |
Farm/Lease Name: COOK UNIT | |
License Status: Producing | |
License Date: 2014-04-03 | |
Spud Date: 2014-04-24 | |
Spud Drilling Contractor: SIDEWINDER DRILLING INC | |
Final Drill Date: 2014-06-22 | |
Well Total Depth: 16775.00 ft | |
Configuration: Horizontal | |
Latitude: 40.000000 | |
Longitude: -80.890000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-04-03 | Proposed Formations:POINT PLEASANT, Issued Date:4/3/2014, Expired Date:4/2/2016 12:00:00 PM, Drilling unit acres:442.52, Proposed Well Type:OG, Proposed Well Class:NWC |
Reached Total Depth | 2014-06-22 | |
Correction to Well | 2015-01-09 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Construction Permit Expires | 2015-04-03 | |
Completion Report Received | 2015-06-19 | |
Record Last Modified | 2018-10-30 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-06-22 | 10265 | 16582 | 0 |
10265 | 16582 | 0 | |
10265 | 16582 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/16/2015 | 04/10/2015 | 9979 | 12,295,400.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | WFR-5W | Nabors Completion and Production Services | Friction Reducer | Hydrotreated paraffinic solvent | 64742-47-8 | 30 | 0.022069 | 0 |
Ethoxylated alcohol blend | Proprietary | 5 | 0.003678 | 0 | ||||
Other Ingredients | Nabors Completion and Production Services | Other Ingredients | Proprietary | Proprietary | 8 | 0.000757 | 0 | |
Alkali Chloride salt | Proprietary | 15 | 0.00000500 | 0 | ||||
Water | 7732-18-5 | 99 | 0.009363 | 0 | ||||
Organophylic Clay | 68953-58-2 | 2 | 0.00005000 | 0 | ||||
Crystalline Silica (in the form of quartz) | 14808-60-7 | 2 | 0.00005000 | 0 | ||||
Proprietary | Proprietary | 0.99 | 0.00001500 | 0 | ||||
Water | 7732-18-5 | 48 | 0.000712 | 0 | ||||
Water | 7732-18-5 | 55 | 0.006344 | 0 | ||||
Proprietary | Proprietary | 0.02 | 0 | 0 | ||||
Proprietary | Proprietary | 25 | 0.002364 | 0 | ||||
Glycol Ethers | 111-46-6 | 40 | 0.000593 | 0 | ||||
Anionic Polyacrylamide | Proprietary | 60 | 0.044137 | 0 | ||||
Proprietary | Proprietary | 4 | 0.002942 | 0 | ||||
HCl Acid (12.5-18.0%), 22 Baume | Nabors Completion and Production Services | Bulk Acid | Water | 7732-18-5 | 87.5 | 0.688162 | 0 | |
Hydrochloric Acid | 7647-01-0 | 18 | 0.141565 | 0 | ||||
Water | XTO Energy/ExxonMobil | Water | Water | 7732-18-5 | 100 | 89.4127 | 0 | |
Acid Inhibitor 2 (AI-2) | Nabors Completion and Production Services | Acid Corrosion Inhibitors | Propargyl Alcohol | 107-19-7 | 20 | 0.000297 | 0 | |
Isopropyl Alcohol | 67-63-0 | 20 | 0.000297 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 20 | 0.000297 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 10 | 0.000148 | 0 | ||||
Proprietary | Proprietary | 15 | 0.000222 | 0 | ||||
LSG-100 | Nabors Completion and Production Services | Gelling Agents | Surfactant | 68439-51-0 | 2 | 0.00005000 | 0 | |
guar gum | 9000-30-0 | 50 | 0.001253 | 0 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.001504 | 0 | ||||
KR-153SL | Nabors Completion and Production Services | Biocides | Polyethlyene-Glycol | 25322-68-3 | 50 | 0.005767 | 0 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.002307 | 0 | ||||
Sand | Nabors Completion and Production Services | Sand - Bulk - Pennsylvania | Crystalline Silica, quartz | 14808-60-7 | 99.9 | 4.02802 | 0 | |
Aluminum Oxide | 1344-28-1 | 1.1 | 0.005919 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.056453 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.000538 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.044353 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 5.12697 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.000538 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.004032 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.004032 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.005132 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.005132 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 0.53754 | 0 | ||||
OB-2 LT | Nabors Completion and Production Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 85 | 0.00002700 | 0 | |
Crystalline Silica (in the form of quartz) | 14808-60-7 | 10 | 0.00000300 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-04-09 | H2O | 15 | 17755 Bbl | 745710 | STAGE 21/21
60 SHOTS | |
2015-03-16 | H2O | 15 | 13280 Bbl | 560200 | STAGE 1/21
60 SHOTS STAGES 2-20 SEE IMAGES C & J Energy Services |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | XTO ENERGY INC. | 2253903 | 0 | 234 |
2016 | XTO ENERGY INC. | 2537844 | 0 | 366 |
2017 | XTO ENERGY INC. | 1028421 | 0 | 338 |
2018 | XTO ENERGY INC. | 799365 | 0 | 365 |
2019 | XTO ENERGY INC. | 162945 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | XTO ENERGY INC. | Brine | 24310 | 234 |
2016 | XTO ENERGY INC. | Brine | 17377 | 366 |
2017 | XTO ENERGY INC. | Brine | 6282 | 338 |
2018 | XTO ENERGY INC. | Brine | 4883 | 365 |
2019 | XTO ENERGY INC. | Brine | 977 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1513040525 | 2017-8-23 0:00: | PW | No Violations | 0.50 |
0188688537 | 2018-08-16 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a four-string casing design, 5.5-inch diameter production casing that appeared to be open flowing. Annular pressure monitoring was in place on both the 13.325-inch diameter surface casing and the 9.625-inch diameter deep intermediate casing, pressures were monitored with transducers with no ability to read pressures. Both casings had bleed down lines ran to the production fluid tanks, at the time of my inspection the 13.375-inch diameter casing was open flowing into tanks. Production equipment included a vertical separator and tank vault de-foaming unit. There were also 2- 400-barrel production fluid tanks inside secondary containment. Identification tags were present, and production was up to date. No violations were found at the time of my inspection. |
1239899025 | 2015-01-22 | Preliminary Restoration | No Violations | The preliminary restoration for this well is completed. The pad is in satisfactory condition with proper erosion and sedimentation controls in place. Company shall continue to monitor the location to ensure the pad remains in satisfactory condition. Preliminary restoration passed. |
1399628931 | 2014-05-09 | Casing String Witnessed | No Violations | On the day of my inspection Sidewinder 08 had drilled the surface hole. The 24 surface casing was ran and cemented. See cement ticket for details. No violations noted. |
1399635178 | 2014-05-09 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I inspected the next casing string to be ran. It was new 18.625 casing that appeared to be of satisfactory condition. No violations noted. |
1513040525 | 2017-08-23 | Production Wells | No Violations | This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing without any artificial lift technology present at this time. The well is piped to a gas processing unit and then to a production area and to sales. The production area contains two 400-barrel production fluid holding tanks and a vertical mechanical separator. Production records in RBDMS are current to 2017. |
1543337175 | 2018-11-27 | UrbanProduction Wells | No Violations | Status check inspection found one well present on the pad that is currently in production. The well is equipped with an lower A and upper B section. Attached to the lower A and upper B section well head outlet ports are 2 diameter riser pipes, the pipes are equipped with valves and gauges to monitor annular pressure. The tanks are tied into a 2 sales line that runs back to the production tanks. There is a production tree present on the B section with 3 manual valves and one emergency shut down hydraulic valve present. All pressure monitoring is done through electronic transducers. The production facility consists of (2) streel construction 400 barrel fluid volume tanks situated along with a mechanical separator and gas metering equipment inside a polymer lined steel containment dike area. The production facility is on a separate pad adjacent to the well pad that is also at the entry point of the well pad. There are emergency shut down devices situated at the well pad entry point and tank battery only. Also on the right side of the lease road at the well pad entry point is the 3rd party midstream operator. Also noted is that the well pad and production pad do not have perimeter earthen berms present. |
188688537 | 2018-8-16 0:00: | PW | No Violations | 1.00 |
441209521 | 2020-4-10 0:00: | PW | No Violations | 0.40 |
For data sources see[10]