If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20789 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.86,"lon":-80.92,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Washington Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: US-OH-001051 | |
Farm/Lease Name: PAVICH UNIT | |
License Status: Producing | |
License Date: 2018-03-29 | |
Spud Date: 2018-07-27 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-09-28 | |
Well Total Depth: 17334.00 ft | |
Configuration: Horizontal | |
Latitude: 39.860000 | |
Longitude: -80.920000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-06-10 | Proposed Formations:POINT PLEASANT, Issued Date:6/10/2014, Expired Date:6/9/2016 12:00:00 PM, Drilling unit acres:615.076, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2018-03-29 | Proposed Formations:POINT PLEASANT, Issued Date:3/29/2018, Expired Date:3/28/2020 12:00:00 PM, Drilling unit acres:607.113, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-09-28 | CANCELLED PER OWNER REQUEST (05/05/2015) |
Completion Report Received | 2019-03-07 | CANCELLED PER OWNER REQUEST (05/05/2015) |
Record Last Modified | 2019-04-03 | CANCELLED PER OWNER REQUEST (05/05/2015) |
Construction Permit Expires | 2020-03-28 | CANCELLED PER OWNER REQUEST (05/05/2015) |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2019-04-02 | 16887 | 17027 | 0 |
2019-04-02 | 10687 | 10827 | 0 |
16887 | 17027 | 0 | |
10687 | 10827 | 0 | |
10687 | 10827 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/29/2018 | 11/18/2018 | 10374 | 15,207,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand | C&J Energy Services | Sand - Bulk - Pennsylvania | Listed Below | Listed Below | 0 | 0 | 0 |
CI-3 | C&J Energy Services | Acid Corrosion Inhibitors | Listed Below | Listed Below | 0 | 0 | 0 | |
GA-7F | C&J Energy Services | Gelling Agents | Listed Below | Listed Below | 0 | 0 | 0 | |
HC-15 | C&J Energy Services | Bulk Acid | Listed Below | Listed Below | 0 | 0 | 0 | |
1-DECANOL | 112-30-1 | 5 | 0.00008100 | 0 | ||||
Sorbitan Monooleate | 1338-43-8 | 2 | 0.002129 | 0 | ||||
Ethoxylated Sorbitan Monooleate | 9005-65-6 | 1 | 0.001064 | 0 | ||||
Cinnamaldehyde | 104-55-2 | 15 | 0.000242 | 0 | ||||
Hydrated magnesium silicate | 14807-96-6 | 1 | 0.00000400 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.074888 | 0 | ||||
2,2-Dibromo-3-nitrilo-propionamide (DBNPA) | 10222-01-2 | 30 | 0.006567 | 0 | ||||
Ethylene Glycol | 107-21-1 | 5 | 0.005322 | 0 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.131118 | 0 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.000396 | 0 | ||||
Poly(oxy-1,2-ethandiyl), alpha-isodecyl-omega-hydroxy-phosphat
Poly(oxy-1,2-ethandiyl), alpha-isodecyl-omega-hydroxy-phosphate |
108818-88-8 | 2 | 0.002129 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.006808 | 0 | ||||
Cured Resin | 25038-72-6 | 10 | 0.00003900 | 0 | ||||
Triethyl Phosphate | 78-40-0 | 2.5 | 0.00004000 | 0 | ||||
Isopropanol | 67-63-0 | 2.5 | 0.00004000 | 0 | ||||
CRYSTALLINE QUARTZ | 14808-60-7 | 99.5 | 0.850199 | 0 | ||||
Dimethylformamide | 68-12-2 | 20 | 0.000323 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 6.80117 | 0 | ||||
Ammonium Persulfate | 7727-54-0 | 100 | 0.000394 | 0 | ||||
1-OCTANOL | 111-87-5 | 2.5 | 0.00004000 | 0 | ||||
2-Propenoic acid, polymer with 2-propenamide, sodium salt | 25987-30-8 | 30 | 0.031935 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.006808 | 0 | ||||
Polyethylene glycol | 25322-68-3 | 50 | 0.010944 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 2.3382 | 0 | ||||
Methanol | 67-56-1 | 1 | 0.000198 | 0 | ||||
Water | 7732-18-5 | 30 | 0.000484 | 0 | ||||
Bentonite | 1302-78-9 | 5 | 0.001767 | 0 | ||||
CRYSTALLINE QUARTZ | 14808-60-7 | 0.01 | 0.00000400 | 0 | ||||
Hydrochloric Acid | 7647-01-0 | 20 | 0.004175 | 0 | ||||
Water | 7732-18-5 | 30 | 0.031935 | 0 | ||||
Alcohols, C9-11-iso-, C10-rich, ethoxylated propoxylated | 68002-97-1 | 3 | 0.00106 | 0 | ||||
Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 35 | 0.037257 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 15 | 0.000242 | 0 | ||||
Alcohols, C12-15-branched and linear,
ethoxylated propoxylated |
120313-48-6 | 2 | 0.002129 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 15 | 0.000242 | 0 | ||||
Tar Bases, Quinoline Derivs. | 68513-87-1 | 1 | 0.00001600 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.002341 | 0 | ||||
Sodium Acetate Anhydrous | 127-09-3 | 3 | 0.003193 | 0 | ||||
Poly(oxy-1,2-ethanediyl),alpha-(4-nonylphenyl)-omega
hydroxy-, branched |
127087-87-0 | 5 | 0.00008100 | 0 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.000646 | 0 | ||||
Water | 7732-18-5 | 80 | 0.016699 | 0 | ||||
2-Propenamide as residual | 79-06-1 | 0.1 | 0.000106 | 0 | ||||
Phenol-Formaldehyde Novolak Resin | 9003-35-4 | 5 | 0.042724 | 0 | ||||
Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 60 | 0.021201 | 0 | ||||
Water | 7732-18-5 | 96 | 0.019011 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.025746 | 0 | ||||
Monoethanolamine hydrochloride | 2002-24-6 | 2 | 0.000396 | 0 | ||||
Poly(tetrafluoroethylene) | 9002-84-0 | 0.7 | 0.00000300 | 0 | ||||
Guar Gum | 9000-30-0 | 60 | 0.021201 | 0 | ||||
Water | 7732-18-5 | 28.5 | 0.006238 | 0 | ||||
Water | 7732-18-5 | 85 | 0.743004 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.002341 | 0 | ||||
Phosphonic Acid Salt | Proprietary | 6 | 0.001188 | 0 | ||||
TrueSet 40/70 | C&J Energy Services | Proppants - Manufactured - Santrol | Listed Below | Listed Below | 0 | 0 | 0 | |
BIO-CLEAR 2000 | C&J Energy Services | Biocides | Listed Below | Listed Below | 0 | 0 | 0 | |
Water | XTO Energy/ExxonMobil | Carrier Fluid | Water | 7732-18-5 | 100 | 88.9165 | 0 | |
BR-11 | C&J Energy Services | Gel Breakers | Listed Below | Listed Below | 0 | 0 | 0 | |
FR-16 | C&J Energy Services | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
HC-20 | C&J Energy Services | Bulk Acid | Listed Below | Listed Below | 0 | 0 | 0 | |
SI-6 | C&J Energy Services | Paraffin & Scale Additives | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-10-29 | H2O | 15 | 11737 Bbl | 447000 | C&J Energy Services | STAGE 1/32
STAGES 2-31 SEE IMAGES |
2018-11-18 | H2O | 15 | 10782 Bbl | 424020 | C&J Energy Services | STAGE 32/32
STAGES 2-31 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | XTO ENERGY INC. | 0 | 0 | 0 |
2019 | XTO ENERGY INC. | 917805 | 0 | 75 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | XTO ENERGY INC. | Brine | 0 | 0 |
2019 | XTO ENERGY INC. | Brine | 28859 | 75 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1407521654 | 2018-8-1 0:00:0 | DD | No Violations | 0.50 |
-334894308 | 2020-9-22 0:00: | PW | No Violations | 0.20 |
-422103618 | 2020-7-21 0:00: | PL | No Violations | 0.40 |
0068938096 | 2019-02-25 | Production Wells | No Violations | Preliminary Restoration status check inspection found the area affected by the well pad construction meets ORC 1509.072 with vegetation established and no erosion control issues noted. The well pad and lease road surface are stone construction and in good repair. The well pad is not equipped with a perimeter berm. (2) wells were recently drilled the Pavich #3 and # 5 and completed on the pad with (2) additional pre existing wells present. The (2) newer wells identified as the # 3 are producing off the 5.5 diameter production casing through a primary master valve and production tree and were recently turned over from flow back to production. Annular pressure monitoring is in place on the well head A&B sections. There is (2) tank battery production facilitys present with the well pad with the facility associated with the # 3 wells equipped with (4) steel 400 barrel tanks that are situated inside a polymer lined steel containment dike area. |
0951531748 | 2018-07-12 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed that Patterson Rig 579 had drilled the 24-inch diameter well bore to a depth of 725 feet. Wyoming Casing crew ran 701 feet of 18.625-inch diameter J 55 buttress thread casing at 87.5 pound per foot, with 2.4 feet of casing above Kelly Bushing, which is 26 feet above ground level. Two cement baskets were set at 569 feet. C&J Energy Services was on site and rigged up their cement head and loaded lines with 5 barrels of fresh water and pressure tested to 1500 pounds per square inch. C&J Energy Services pumped a 100-barrel gel spacer with poly flake, washed up and then pumped 311 barrels 1456 sacks of 15.6 pounds per gallon Class A cement with a yield of 1.2 cubic feet per sack mixed with 5.25 gallons of water per sack. Cement was displaced with 201 barrels of fresh water, with 105 barrels of good cement to surface. Plug was bumped at 340 pounds per square inch and pressured up to 840 pounds per square inch then held for 5 minutes with .5 barrels of flowback. I informed XTO company man JR Hill that the casing must remain static until cement reaches a compressive strength of 500 pounds per square inch. |
1279954332 | 2020-9-24 0:00: | CT | No Violations | 0.30 |
1407521654 | 2018-08-01 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that the Cellars and conductors had been set and was currently under a steel plate. I spoke with XTO representative Paul Hahn and he informed me that the cement jobs went according to plan, and cement did no drop after 1 day of setting, this could not be confirmed due to the cellars being covered. Well was spudded and cemented on 7/27/2018. |
1863625619 | 2020-5-7 0:00:0 | PW | No Violations | 0.20 |
68938096 | 2019-2-25 0:00: | PW | No Violations | 0.50 |
951531748 | 2018-7-12 0:00: | CS | No Violations | 6.00 |
For data sources see[10]