If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20812 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.95,"lon":-80.82,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Mead Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: US-OH-001070 | |
Farm/Lease Name: ALBRIGHT UNIT | |
License Status: Producing | |
License Date: 2015-10-16 | |
Spud Date: 2014-07-27 | |
Spud Drilling Contractor: SIDEWINDER DRILLING INC | |
Final Drill Date: 2015-02-18 | |
Well Total Depth: 16070.00 ft | |
Configuration: Horizontal | |
Latitude: 39.950000 | |
Longitude: -80.820000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1801-01-02 | 959 RELIANCE OIL CORP |
APP | 2014-07-09 | Proposed Formations:POINT PLEASANT, Issued Date:7/9/2014, Expired Date:7/8/2016 12:00:00 PM, Drilling unit acres:639.077, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2015-02-18 | |
Correction to Well | 2015-03-20 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Correction to Well | 2015-04-10 | UPDATE TO UNIT SIZE. |
APP | 2015-10-16 | Proposed Formations:POINT PLEASANT, Issued Date:10/16/2015, Expired Date:10/15/2017 12:00:00 PM, Drilling unit acres:633.7229, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2015-10-16 | UPDATE TO UNIT SIZE. |
Completion Report Received | 2015-11-24 | |
Construction Permit Expires | 2017-10-15 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-11-27 | 15694 | 11252 | 0 |
15694 | 11252 | 0 | |
15694 | 11252 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/08/2015 | 06/24/2015 | 10400 | 10,118,100.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand, White, 100 mesh | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.801619 | 757066 |
Alpha 1427 | Baker Hughes | Biocide | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0178442 | 16852.5 | |
Scaletrol 720 | Baker Hughes | Scale Inhibitor | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0105584 | 9971.59 | |
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 89.3156 | 84,362,600.0 | |
Ingredients in Additive(s) (MSDS and non-MSDS) | Baker Hughes | See Trade Name(s) List | Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.0011294 | 1066.81 | |
Potassium Iodide | 7681-11-0 | 2 | 0.00004010 | 37.904 | ||||
Isopropanol | 67-63-0 | 5 | 0.0001003 | 94.76 | ||||
Oxyalkylated Fatty Acid | 61791-002 | 40 | 0.0008026 | 758.08 | ||||
Formic Acid | 64-18-6 | 30 | 0.0006019 | 568.56 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.0053526 | 5055.75 | ||||
Ethanol | 64-17-5 | 5 | 0.0008921 | 842.625 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.147053 | 138898 | ||||
Aldehyde | 104-55-2 | 30 | 0.0006019 | 568.56 | ||||
Polyaklylene | 7756-94-7 | 1 | 0.00002010 | 18.952 | ||||
Potassium Acetate | 127-08-2 | 0.5 | 0.00001000 | 9.476 | ||||
Potassium Chloride | 7447-40-7 | 1 | 0.0001056 | 99.7159 | ||||
Poly (acrylamide-co-acrylic acid) partial sodium salt | 62649-23-4 | 30 | 0.0169417 | 16002.2 | ||||
2-Propenoic, Polymer with Sodium Phosphinate, Sodium Salt | 71050-62-9 | 20 | 0.0021114 | 1994.32 | ||||
Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.0169417 | 16002.2 | ||||
Polyoxythylene Sorbitan Monooleate | 9005-65-6 | 0.5 | 0.0002824 | 266.703 | ||||
Citric Acid | 77-92-9 | 60 | 0.0040441 | 3819.85 | ||||
Sulfurized polyolefin | 68037-13-8 | 5 | 0.0001003 | 94.76 | ||||
Sorbitan Monooleate | 1338-43-8 | 0.5 | 0.0002824 | 266.703 | ||||
Quaternary Ammonium Compound | 68424-85-1 | 5 | 0.0009924 | 937.385 | ||||
Ethylene Glycol | 107-21-1 | 45 | 0.0047507 | 4487.22 | ||||
Calcium Chloride | 10043-52-4 | 5 | 0.0005279 | 498.579 | ||||
Water | 7732-18-5 | 85 | 0.875402 | 826857 | ||||
Oleamide DEA | 93-83-4 | 2 | 0.0011294 | 1066.81 | ||||
Sodium Chloride | 7647-14-5 | 5 | 0.0029292 | 2766.74 | ||||
Tar Bases, Quinoline Derivs., Benzyl Chloride-Quaternized | 72480-70-7 | 30 | 0.0006019 | 568.56 | ||||
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 10 | 0.0017842 | 1685.25 | ||||
Ammonium Chloride | 12125-02-9 | 3 | 0.0016942 | 1600.22 | ||||
Crystalline Silica (Quartz) | 14808-60-7 | 100 | 9.59721 | 9,065,010.0 | ||||
FRW-18 | Baker Hughes | Friction Reducer | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0564796 | 53340.6 | |
HCl, 10.1 - 15% | Baker Hughes | Acidizing | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.980481 | 925987 | |
Sand, White, 30/50 | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 4.96995 | 4,693,730.0 | |
Sand, White, 40/70 | Baker Hughes | Proppant | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 3.82691 | 3,614,210.0 | |
Ferrotrol 300L | Baker Hughes | Iron Control | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0067411 | 6366.41 | |
CI-39 | Baker Hughes | Corrosion Inhibitor | MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.0019288 | 1821.6 | |
MSDS and Non-MSDS Ingredients Listed Below | N/A | 0 | 0.00007790 | 73.6 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-06-23 | H2O | 8 | 13741 Bbl | 521886 | BAKER-HUGHES | STAGE 17/18
60 SHOTS |
2015-06-10 | H2O | 8 | 9487 Bbl | 286095 | BAKER-HUGHES | STAGE 1/18
60 SHOTS STAGES 2-17 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | XTO ENERGY INC. | 681382 | 0 | 70 |
2016 | XTO ENERGY INC. | 2875358 | 0 | 356 |
2017 | XTO ENERGY INC. | 1175015 | 0 | 351 |
2018 | XTO ENERGY INC. | 527345 | 0 | 333 |
2019 | XTO ENERGY INC. | 102842 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | XTO ENERGY INC. | Brine | 7463 | 70 |
2016 | XTO ENERGY INC. | Brine | 20972 | 356 |
2017 | XTO ENERGY INC. | Brine | 6825 | 351 |
2018 | XTO ENERGY INC. | Brine | 9706 | 333 |
2019 | XTO ENERGY INC. | Brine | 1046 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1113239953 | 2015-1-22 0:00: | DD | No Violations | 0.50 |
-1901938328 | 2014-7-28 0:00: | CS | No Violations | 5.00 |
-2027634396 | 2015-1-26 0:00: | DD | No Violations | 0.50 |
-434944322 | 2014-9-7 0:00:0 | CS | No Violations | 6.00 |
-515719692 | 2014-7-27 0:00: | CS | No Violations | 5.00 |
-699821738 | 2015-2-2 0:00:0 | DD | No Violations | 0.50 |
-751504671 | 2017-6-7 0:00:0 | PW | No Violations | 0.50 |
-75212208 | 2018-8-7 0:00:0 | PW | No Violations | 0.50 |
0075212208 | 2018-08-07 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a four-string casing design, 5.5-inch diameter production casing and 2.875-inch diameter tubing that appeared to be open flowing with no artificial lift technology. Annular pressure monitoring was in place on both the 13.325-inch diameter surface casing and the 9.625-inch diameter deep intermediate casing, pressures were monitored with transducers with no ability to read pressures at the well head. Both casings had bleed down lines ran to the production fluid tanks, at the time of my inspection the 13.375-inch diameter casing was open flowing into tanks through a choke manifold. There were also two chemical vault tanks near the well heads with foaming and anti-scaling agents. Production equipment included a Gas Processing Unit, that was inside of containment. There were also 3- 400-barrel production fluid tanks inside containment. Production fluid tanks were all shared with 34013208140000, 34013208130000. There were also 3 400-barrel production fluid tanks that were on location and not hooked up to the wells. Identification tags were present, and production was up to date. No violations were found at the time of my inspection. |
0177647774 | 2015-01-23 | Drill / Deepen / Reopen | No Violations | Current operations are waiting on cement |
0434944322 | 2014-09-07 | Casing String Witnessed | No Violations | Purpose of this inspection was to witness the cementing of the surface casing back to surface. First Class Energy Rig 6 drilled a 28x421 open hole. 24x401 (95#/ft) casing set. Casing was centralized with 4 centralizers. Previous casing set was a 30 conductor to 95. Baker-Hughes is onsite with 605 sks of class A cement (15.6 ppg; 1.21 yield). Cement additives are 3% CaCl and .25#/sk celloflake. 30% excess ran in the open hole. 189 bbl of fresh water used for diplacement. 20.5 bbl of cement returned to surface. |
0515719692 | 2014-07-27 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the conductor string remediation cement top off. Top off was successful. See cement ticket for details. No violations noted. |
0634436459 | 2015-01-22 | Preliminary Restoration | No Violations | The preliminary restoration for this well is completed. The pad is in satisfactory condition with proper erosion and sedimentation controls in place. Company shall continue to monitor the location to ensure the pad remains in satisfactory condition. Preliminary restoration passed. |
0699821738 | 2015-02-02 | Drill / Deepen / Reopen | No Violations | |
0751504671 | 2017-06-07 | Production Wells | No Violations | On the day of my inspection the well appeared to be in the production phase. The production line off of the wellhead lead to a tank battery consisting of five 400 barrel production fluid holding tanks and a gas processing unit. All production mechanics within the tank battery were held within a metal diked area. |
1113239953 | 2015-01-22 | Drill / Deepen / Reopen | No Violations | |
1410227175 | 2014-09-08 | Casing String Witnessed | No Violations | First class energy rig 6 drilled a 22x721 open hole and set 708 of 18 5/8 casing (87.5#/ft). Casing is centralized with 6 centralizers. Previous casing set was 24 to a depth of 401. Baker Hughes is onsite with 656 sks of Class A (15.6; 1.21 yield) to cement the casing back to surface. 50% excess ran in open hole. 30 bbl cement returned to the surface. Rig was still running joints into the hole upon my arrival and I was not updated that the job was running behind schedule. |
1421986715 | 2015-01-22 | Casing String Witnessed | No Violations | On this day the 13.375 casing was cemented into a 17.5 open hole to a depth of 2460. Nabors ran 1720 sks of Class A cement with an excess of 30%. Cement to surface was established. See Cement ticket for detials. No violations noted. |
1674770071 | 2020-5-21 0:00: | PW | No Violations | 0.20 |
177647774 | 2015-1-23 0:00: | DD | No Violations | 0.50 |
1901938328 | 2014-07-28 | Casing String Witnessed | No Violations | On the date of inspection I was informed by XTO Company Man Paul Hahn that Express Energy Services has drilled a 36 inch diameter hole to 101 feet. 30 inch diameter casing at 118.64 lbs/ft was set at 100 feet. I witnessed Express Energy Services (Express) establish circulation in hole prior to pumping cement. Express pumped 57.8bbl of Class A cement with 0.50 lbs/sk of flake, 2% CaCl, a weight of 15.6 lbs/gallon and 1.18 yield. 15bbl cement returned to surface. Cement stayed at surface while I was on site. |
2027634396 | 2015-01-26 | Drill / Deepen / Reopen | No Violations | |
2064431787 | 2015-08-07 | Production Wells | No Violations | On this day I received a call from Chris Holmes with the Ohio EPA at 12:02 pm who indicated they had received a complaint from a John Vigoffi about a gas leak in the area of KEY in Richland Township Belmont County. I responded and found workers were conducting maintained operations on the Summit Midstream Kaldor Dehy station that receives gas from the Albright well pad. The company representative on site had indicated that they were running a pig sweep on the newly conducted 20 sales line and only air was being discharged. The location of the pad is at EPE 25-39.95450 X 80.82932. Due to Jurisdictional boundaries the information was forwarded over to the Ohio EPA by ODNR Emergency Response Director Scott King. My Direct supervisor Brent Bear was also updated on the findings. |
634436459 | 2015-1-22 0:00: | PL | No Violations | 0.50 |
For data sources see[10]