If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20884 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.88,"lon":-81.23,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Somerset Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-001171 | |
Farm/Lease Name: FRANCIS 210226 | |
License Status: Producing | |
License Date: 2015-02-04 | |
Spud Date: 2015-02-05 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2015-10-05 | |
Well Total Depth: 17500.00 ft | |
Configuration: Horizontal | |
Latitude: 39.880000 | |
Longitude: -81.230000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-11-06 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/6/2014, Expired Date:11/5/2016 12:00:00 PM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class:EW |
APP | 2015-02-04 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:2/4/2015, Expired Date:2/3/2017 12:00:00 PM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2015-08-14 | CORRECTION TO UNIT SIZE (INCREASE) AND CORRECTION TO FOOTAGES (SURFACE, TARGET AND TAKE-POINT) |
Reached Total Depth | 2015-10-05 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
Correction to Well | 2016-03-25 | change in target/takepoint per as drilled plat-ALE |
Completion Report Received | 2016-12-16 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
Construction Permit Expires | 2017-02-03 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
Record Last Modified | 2019-06-07 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-12-19 | 9110 | 17348 | 0 |
9110 | 17348 | 0 | |
9110 | 17348 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/20/2016 | 06/12/2016 | 8525 | 13,235,900.0 | 0 |
2 | 05/20/2016 | 06/12/2016 | 8620 | 13,149,400.0 | 54000 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 89.227 | 109,534,000.0 |
Fresh Water | 7732-18-5 | 100 | 89.3775 | 110,387,000.0 | ||||
FR-76, HAI-OS ACID INHIBITOR, SAND-COMMON
WHITE - 100 MESH, 3307 LB BAG, SAND-PREMIUM WHITE-40/70, BULK |
Halliburton | Corrosion Inhibitor, Friction Reducer, Proppant | NA | Confidential | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Base Fluid | NA | Confidential | 0 | 0 | 0 | |
FR-76, HAI-OS ACID INHIBITOR, COMMON
WHITE - 100 MESH, PREMIUM WHITE-40/70, |
Halliburton | Corrosion Inhibitor, Friction Reducer, Proppant | NA | Confidential | 0 | 0 | 0 | |
Hazardous and Non-Hazardous Ingredients | Methanol | 67-56-1 | 60 | 0.00019439 | 241 | |||
Alcohols, C14-C15, ethoxylated | 68951-67-7 | 30 | 0.00009719 | 121 | ||||
Fatty acids, tall oil | Confidential | 30 | 0.00009779 | 121 | ||||
Methanol | 67-56-1 | 60 | 0.000195573 | 241 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 10.1586 | 12,546,500.0 | ||||
Alcohols ethoxylated | Confidential | 5 | 0.00426427 | 5267 | ||||
Ammonium chloride | 12125-02-9 | 5 | 0.00426427 | 5267 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0267362 | 32822 | ||||
Water | 7732-18-5 | 100 | 0.429478 | 530434 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.00009779 | 121 | ||||
Water | 7732-18-5 | 100 | 0.440681 | 540977 | ||||
Polyacrylamide copolymer | Confidential | 30 | 0.0255856 | 31600 | ||||
Alcohols, C14-C15, ethoxylated | 68951-67-7 | 30 | 0.00009779 | 121 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00003240 | 41 | ||||
Fatty acids, tall oil | Confidential | 30 | 0.00009719 | 121 | ||||
Acrylamide acrylate polymer | Confidential | 30 | 0.0267362 | 32822 | ||||
Sodium chloride | 7647-14-5 | 30 | 0.0267362 | 32822 | ||||
Sorbitan, mono-9-octadecenoate, (Z) | 1338-43-8 | 1 | 0.000852854 | 1054 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0255856 | 31600 | ||||
Olefins | Confidential | 5 | 0.00003911 | 52 | ||||
Hydrochloric acid | 7647-01-0 | 10 | 0.0378306 | 46723.5 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.00009719 | 121 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 10.2964 | 12,639,800.0 | ||||
Sodium chloride | 7647-14-5 | 5 | 0.00426427 | 5267 | ||||
Sorbitan monooleate polyoxyethylene derivative | 9005-65-6 | 1 | 0.000852854 | 1054 | ||||
Olefins | Confidential | 5 | 0.00003888 | 52 | ||||
Hydrochloric acid | 7647-01-0 | 10 | 0.0387208 | 47534 | ||||
Amide | Confidential | 5 | 0.00426427 | 5267 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-06-12 | H2O | 10 | 274740 Gal | 248123 | Halliburton | STAGE 46/46
40 SHOTS |
2016-05-20 | H2O | 15 | 293895 Gal | 275693 | Halliburton | STAGE 1/46
40 SHOTS STAGES 2-45 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | GULFPORT ENERGY CORPORATION | 2432655 | 1553 | 181 |
2017 | GULFPORT ENERGY CORPORATION | 2393471 | 327 | 361 |
2018 | GULFPORT ENERGY CORPORATION | 1161241 | 1 | 363 |
2019 | GULFPORT ENERGY CORPORATION | 212838 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | GULFPORT ENERGY CORPORATION | Brine | 19504 | 181 |
2017 | GULFPORT ENERGY CORPORATION | Brine | 29940 | 361 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 10386 | 363 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 1817 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1058877716 | 2015-9-11 0:00: | DD | No Violations | 2.00 |
-1478971018 | 2017-10-17 0:00 | PW | No Violations | 1.00 |
-1663520793 | 2015-9-22 0:00: | DD | No Violations | 1.00 |
-2145029059 | 2015-10-6 0:00: | CS | No Violations | 5.50 |
0311390317 | 2015-02-05 | Casing String Witnessed | No Violations | On this day the 26 conductor pipe was ran and cemented to a depth of 110 in a 30 open hole. 288 sks were pumped and cement to surface established. See cement ticket for details. No violations noted. |
0565639621 | 2015-10-01 | Drill / Deepen / Reopen | No Violations | My inspection today finds the Patterson 257 is drilling an 8.5 borehole at 329 degrees azimuth. |
0682271382 | 2015-01-22 | Drill / Deepen / Reopen | No Violations | Operator plans to mobilize Rocky Mountain Drilling to this site and start setting the cellars. They anticipate to commence drilling the open hole section after. |
1011388786 | 2020-10-19 0:00 | PW | No Violations | 0.20 |
1058877716 | 2015-09-11 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig, Patterson 257, is rigging up over the well and preparing to drill the surface section. |
1334043347 | 2020-2-20 0:00: | PW | No Violations | 0.20 |
1478971018 | 2017-10-17 | Production Wells | No Violations | This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit and then to a production area that contains four 400- |
1543510675 | 2018-11-29 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with erosion control in place and vegetation established. Previously a slip occurred on the west side of the well pad shortly after the initial excavation construction phase, this area was inspected and no earthen movement was observed. The lease road and well pad surface is stone construction and in good repair. The well pad entrance does have a gate present. 3 wells are present on the well pad with the said well being equipped with a lower A and upper B section, attached to the A&B section well head ports is 2 diameter riser pipes that are equipped with valves and gauges for annular pressure monitoring purposes. The 13,375 well head ( A) section gauge reads 350 pounds pressure. The 9.625 well head (B) section gauge reads 250 pounds pressure. The 5.5 diameter casing internal pressure is 500 pounds pressure. The well head assembly does have a tubing production tree and the flow line pressure down stream from the well head choke is 200 pounds pressure. The well is producing into a gas processing unit. The production fluid storage area consists of (4) steel construction 400 barrel fluid capacity tanks and one 50 barrel tank situated inside a polymer lined steel containment dike area. |
1552916105 | 2019-03-18 | Production Wells | No Violations | On site inspection accompanied by ODNER Engineers Paul Logan, Mark Atkinson and Anthony Carson. On site to represent Gulfport was Blake Arthur. The reason for the on site meeting was to review 2 separate earthen slips on the outward slopes of the well pad. The company had submitted material modifications and is working with the ODNR Engineering staff to address the slips. There is 3 wells present on the pad that are producing, the production equipment and production flow lines are on the opposite side of the pad from the earthen slip. The wells are producing. |
1663520793 | 2015-09-22 | Drill / Deepen / Reopen | No Violations | On my inspection today I was accompanied by Inspector Conrad, our inspection finds the drilling rig Patterson 257 has ran 9.625 casing to a depth of 7910 with fifty bow spring centralizers. The casing will be cemented in place as soon as the Stingray Cementing pump truck arrives on site. |
1818069871 | 2015-09-22 | Drill / Deepen / Reopen | No Violations | I am accompanied today by Inspector Sefcik, our inspection finds the drilling rig Patterson 257 ran 9.625 casing to a depth of 7910 with fifty bow spring centralizers. The casing will be cemented in place as soon as the Stingray Cementing pump truck arrives on site. |
1847230202 | 2015-09-12 | Casing String Witnessed | No Violations | I am onsite to witness the surface casing cementing operations. Patterson rig 257 drilled 394 of 24 borehole and then ran 394 of 18.625 casing to the same depth. Stingray cemented the casing in place by circulating 126 barrels of cement around the annular space of the casing. I witnessed 25 barrels of cement circulated to surface. |
2145029059 | 2015-10-06 | Casing String Witnessed | No Violations | I am onsite to witness the 5.5 production casing string installation and cementing operations. 17,496 of 5.5 casing was installed in the well by Patterson Rig 257. Stingray cemented the casing in place with 736 barrels of class H based cement slurry. |
311390317 | 2015-2-5 0:00:0 | CS | No Violations | 4.00 |
565639621 | 2015-10-1 0:00: | DD | No Violations | |
682271382 | 2015-1-22 0:00: | DD | No Violations | 0.50 |
For data sources see[10]