X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-20905

Well Details

Well ID: 34-013-20905
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Goshen Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001201
Farm/Lease Name: BOUNTY HUNTER
License Status: Producing
License Date: 2015-08-21
Spud Date: 2015-06-30
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2015-09-08
Well Total Depth: 8600.00 ft
Configuration: Horizontal
Latitude: 40.020000
Longitude: -81.030000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-12-29 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:12/29/2014, Expired Date:12/28/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2015-08-21 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:8/21/2015, Expired Date:8/20/2017 12:00:00 PM, Drilling unit acres:400.5363, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-09-08
Correction to Well 2016-01-22 UNIT CHANGE. ACRAGE, TAKE POINT AND TARGET.
Correction to Well 2016-04-22 CHANGE TAKEPOINT AS DRILLED PLAT -ALE
Completion Report Received 2016-04-26
Construction Permit Expires 2017-08-20
Record Last Modified 2017-10-23

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/01/2016 02/05/2016 9113 13,615,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 NEFE-180 Chemplex Corrosion Inhibitor/Iron Control Methanol 67-56-1 35 0.0003636 474.213
2-Ethylhexanol 104-76-7 10 0.000103886 135.489
Fatty acids, tall oil 61790-12-3 5 0.00005194 67.745
Olefin Proprietary 5 0.00005194 67.745
2-Propyn-1-ol 107-19-7 5 0.00005194 67.745
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00005194 67.745
Acetic acid 64-19-7 65 0.000675257 880.681
Coconut oil acid diethanolamine 68603-42-9 5 0.00005194 67.745
Sand (30/50 EP Proppant) Carbo Ceramic Inc. Proppant Ceramic materials and wares, chemicals 66402-68-4 100 1.01134 1,319,000.0
Water Rice Energy Carrier/Base Fluid Water 7732-18-5 100 87.1202 113,624,000.0
BioClear 5000 Lubrizol Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 10 0.00229559 2993.94
Water 7732-18-5 90 0.0206603 26945.5
Sand (40/70 CL Proppant) Carbo Ceramic Inc. Proppant Ceramic materials and wares, chemicals 66402-68-4 100 0.91307 1,190,840.0
FRA-405 Lubrizol Friction Reducer Distillates, Petroleum, Hydrotreated Light 64742-47-8 30 0.0143042 18655.7
Water 7732-18-5 70 0.0333764 43530
Sand (100 Mesh Proppant) Taylor Frac Proppant Silica Substrate 14808-60-7 100 10.7425 14,010,500.0
ScaleClear 112D Lubrizol Scale Inhibitor Water 7732-18-5 60 0.014271 18612.4
Ethylene 107-21-1 40 0.00951398 12408.3
Hydrochloric Acid (28%) Oxy Acidizing Water 7732-18-5 64 0.0751578 98022.1
Hydrochloric Acid (Hydrogen Chloride) 7732-18-5 36 0.0422763 55137.4

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-02-05 H2O 15 380940 Gal 493240 STINGRAY PRESSURE PUMPING LLC STAGE 33/33

40 SHOTS

2016-01-01 H2O 15 434112 Gal 503390 STINGRAY PRESSURE PUMPING LLC STAGE 1/33

40 SHOTS STAGES 2-32 SEE IMAGES

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 RICE DRILLING D LLC 2275517 0 262
2017 RICE DRILLING D LLC 1940196 0 363
2018 RICE DRILLING D LLC 69402 0 210
2019 RICE DRILLING D LLC 5868 0 43

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 RICE DRILLING D LLC Brine 74308 262
2017 RICE DRILLING D LLC Brine 34881 363
2018 RICE DRILLING D LLC Brine 1827 210
2019 RICE DRILLING D LLC Brine 82 43

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-150965104 2020-9-25 0:00: PW No Violations 0.20
-1570478552 2015-9-3 0:00:0 DD No Violations 3.00
-197271308 2020-7-9 0:00:0 PL No Violations
-2080304706 2018-5-24 0:00: PW No Violations 0.10
-517324791 2018-8-8 0:00:0 PW No Violations 0.50
0013343029 2015-10-15 Drill / Deepen / Reopen No Violations My inspection today finds Patterson 296 has reached a total depth of 18049 in the 8.5 production section of the well. The rig is pulling drill pipe and laying it down in anticipation of the upcoming rig move. Once all of the drill pipe has been pulled, they will run 5.5 casing with a fiber optic line attached.
0221800386 2018-08-08 Production Wells No Violations On site inspection accompanied by ODNR Inspector Ryan Armstrong. Currently there are 4 producing wells on the pad and 3 new wells that the company has service crews on location and completing. The said well is equipped with a lower A section and upper B section and is producing off the 5.5 diameter production casing. The company has installed 2 diameter riser pipes in the cellar, the pipes are connected to the A&B section well head and are equipped with valves and gauges to allow for annular pressure monitoring. The A section which monitors the pressure between the 13.375 and 9.625 diameter casing strings shows 188 pounds per square inch (psi). The B section which monitors the pressure between the 9.625 and 5.5 diameter casing strings shows 1,680 psi on the gauge. The 5.5 diameter production string internal pressure is 1,600 psi and the production flow line pressure is 1,086 psi. There is currently cages placed over the 4 producing wells and barriers around them. The production equipment includes 4 gas processing units and 2 glycol heaters. Upon entering the location on the left side of the well pad is the production fluid facility consisting of 6 steel construction 400 barrel fluid capacity production tanks situated inside a polymer lined steel containment dike area. At the rear of the well pad a midstream operation has been installed. On this day I contacted ODNR Belmont County Engineer Tech Anthony Carson and informed him that the well pad perimeter earthen berm has been removed in the area of the mid stream operation. Mr. Carson will address the issue with the company. I also spoke with the lease operator who manages the well production on site and requested they address the annular pressure on the # 4 well and post proper identification on the # 8 well.
0517324791 2018-08-08 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a four-string casing design with 5.5-inch diameter production casing, and 2.875-inch diameter tubing that appeared to be open flowing. Annular pressure monitoring was in place, the 9.625-inch diameter intermediate casing gauge read 1680 pounds per square inch, the 13.375-inch diameter surface casing gauge read 188 pounds per square inch. Production equipment included an individual Gas Processing unit and 6- 400-barrel production fluid tanks shared with 34013209040000, 34013209030000, 34013209020000. The well pad and all equipment were contained in an earthen dike; however the dike had been disturbed by midstream on the western edge of the pad, with secondary containment around the production tanks. There were multiple Emergency Shutoff Devices on location, Identification tags was not present, and production was up to date. There were three wells also on location that were in completion process with Mountain State Pressure Systems snubbing rig was currently on the last well to have isolation plugs drilled out. ODNR inspector Bill Stolarik spoke with the lease operator about identification tag not being present and it needed to be addressed.
13343029 2015-10-15 0:00 DD No Violations 3.00
1570478552 2015-09-03 Drill / Deepen / Reopen No Violations My inspection today finds the drilling rig, Patterson 296, is drilling a 12.25 hole at a depth of 6333. The company was notified to make Andrew Corder their first contact through 9/7/15.
2040916511 2015-07-01 Casing String Witnessed No Violations Falcon Drilling drilled to a depth of 363 of 24 hole and ran 333 of 20 surface pipe with shoe on bottom and 4-centralizers and Halliburton cemented casing in place with 270 sacks of cement with 5 bbl of good cement returns.
2080304706 2018-05-24 Production Wells No Violations On site inspection found there is a total of 4 wells in production on the well pad and 3 additonal wells that are being stimulated. The 4 wells have steel cages over them and concrete barriers around them. Annular pressure monitoring. The tank battery is on the well pad and consists of 6 steel construction 400 barrel capacity tanks situated inside a polymer lined steel containment area. The company has annular pressure transducers monitoring the annular pressure on the 13.375 and 9.625 well head sections.
221800386 2018-8-8 0:00:0 PW No Violations 0.40
872011946 2020-2-21 0:00: PW No Violations 0.20

For data sources see[9]

References