If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-21020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.98,"lon":-80.91,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Smith Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: US-OH-001370 | |
Farm/Lease Name: BENNINGTON UNIT | |
License Status: Producing | |
License Date: 2016-07-01 | |
Spud Date: 2016-07-08 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2016-08-20 | |
Well Total Depth: 18186.00 ft | |
Configuration: Horizontal | |
Latitude: 39.980000 | |
Longitude: -80.910000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-12-10 | Proposed Formations:TRENTON, Issued Date:12/10/2015, Expired Date:12/9/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2016-07-01 | Proposed Formations:POINT PLEASANT, Issued Date:7/1/2016, Expired Date:7/1/2018 12:00:00 PM, Drilling unit acres:226.113, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2016-08-20 | |
Correction to Well | 2016-10-07 | CHANGE IN TARGET/TAKEPOINT AS DRILLED PLAT RCVD 09/7/16-ALE |
Completion Report Received | 2017-04-06 | |
Record Last Modified | 2017-10-23 | |
Construction Permit Expires | 2018-07-01 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-04-11 | 17874 | 17964 | 0 |
2017-04-11 | 10232 | 10369 | 0 |
17874 | 17964 | 0 | |
10232 | 10369 | 0 | |
10232 | 10369 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/27/2016 | 12/12/2016 | 9964 | 10,271,100.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | KFR-16FW | Keane | Friction Reducer | ammonium chloride | 12125-02-9 | 1.5 | 0.00002783 | 26.955 |
Distillates (petroleum), hydrotreated light | 64742-47-8 | 20 | 0.000371076 | 359.402 | ||||
alcohols, C12-16, ethoxylated | 68551-12-2 | 1 | 0.000764657 | 740.602 | ||||
oleic acid diethanolamide | 93-83-4 | 1.5 | 0.00114699 | 1110.9 | ||||
Hydrochloric Acid (15%) | Keane | Acidizing | Water | 7732-18-5 | 85 | 1.19149 | 1,154,010.0 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.210263 | 203649 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.4959 | 85,712,000.0 | |
KAI-13 | Keane | Acid Inhibitor | Cinnamaldehyde | 104-55-2 | 10 | 0.000185538 | 179.701 | |
dipropylene gylcol, monomethyl ether | 34590-94-8 | 20 | 0.000371076 | 359.402 | ||||
formic acid | 64-18-6 | 10 | 0.000185538 | 179.701 | ||||
Ethoxylated alcohol | Proprietary | 10 | 0.000185538 | 179.701 | ||||
propan-2-ol | 67-63-0 | 5 | 0.00009277 | 89.851 | ||||
Tar bases, quinoline derivs., benzyl chloride-quaternized | 72480-70-7 | 10 | 0.000185538 | 179.701 | ||||
ethanediol | 107-21-1 | 40 | 0.000742152 | 718.805 | ||||
MBC-516 | Keane | Biocide | quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000886315 | 858.433 | |
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.00133031 | 1288.46 | ||||
glutaral | 111-30-8 | 26.7 | 0.00237686 | 2302.09 | ||||
KSI-16 | Keane | Scale Inhibitor | Ethylene glycol | 107-21-1 | 5 | 0.000445105 | 431.103 | |
Alkyl phosphonic acid | Proprietary | 5 | 0.00382329 | 3703.01 | ||||
ammonia | 7664-41-7 | 0.5 | 0.000382328 | 370.301 | ||||
Sand (Proppant) | Keane | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 9.9984 | 9,683,870.0 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.00133031 | 1288.46 | |
propan-2-ol | 67-63-0 | 5 | 0.00009277 | 89.851 | ||||
Ethylene glycol | 107-21-1 | 5 | 0.000445105 | 431.103 | ||||
formic acid | 64-18-6 | 10 | 0.000185538 | 179.701 | ||||
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000886315 | 858.433 | ||||
dipropylene gylcol, monomethyl ether | 34590-94-8 | 20 | 0.000371076 | 359.402 | ||||
Ethoxylated alcohol | Proprietary | 10 | 0.000185538 | 179.701 | ||||
Tar bases, quinoline derivs., benzyl chloride-quaternized | 72480-70-7 | 10 | 0.000185538 | 179.701 | ||||
Cinnamaldehyde | 104-55-2 | 10 | 0.000185538 | 179.701 | ||||
oleic acid diethanolamide | 93-83-4 | 1.5 | 0.00114699 | 1110.9 | ||||
Water | 7732-18-5 | 85 | 1.19149 | 1,154,010.0 | ||||
alcohols, C12-16, ethoxylated | 68551-12-2 | 1 | 0.000764657 | 740.602 | ||||
Alkyl phosphonic acid | Proprietary | 5 | 0.00382329 | 3703.01 | ||||
ammonium chloride | 12125-02-9 | 1.5 | 0.00002783 | 26.955 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-12-12 | H2O | 15 | 217056 Gal | 225920 | Keane Frac | STAGE 45 OF 45-SEE IMAGES FOR STAGES 2-44 |
2016-11-27 | H2O | 15 | 237804 Gal | 217390 | Keane Frac | STAGE 1 OF 45 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | XTO ENERGY INC. | 3492536 | 0 | 315 |
2018 | XTO ENERGY INC. | 2321809 | 0 | 332 |
2019 | XTO ENERGY INC. | 325873 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | XTO ENERGY INC. | Brine | 20893 | 315 |
2018 | XTO ENERGY INC. | Brine | 23922 | 332 |
2019 | XTO ENERGY INC. | Brine | 1924 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1387564967 | 2016-9-7 0:00:0 | CT | No Violations | 1.00 |
-2115887115 | 2016-9-12 0:00: | CT | No Violations | 1.00 |
1387564967 | 2016-09-07 | Completion Testing | No Violations | On site with Austin Gutridge, a follow up for Emergency Response was conducted. The area that had been affected from the brine release appeared to be completely remediated. This well is currently awaiting completion operations. |
1470835526 | 2016-08-07 | Casing String Witnessed | No Violations | |
1470853623 | 2016-08-10 | Drill / Deepen / Reopen | No Violations | I was on site in response to a call regarding a release that occurred on this pad. Upon arrival I met with some XTO representatives. They explained that the release was due to a mechanical issue. The substance on site consisted of brine water and eco-friendly de-foamer. The area affected measured approximately 40ft*20ft. Following delineation, the company was remediating the area by vacuuming and diluting the affected portion of the pad. The valves on the out flow drains were closed. The company will continue to monitor the sump areas to ensure the clean-up is successful. The remediation efforts will continue until the conductivity and chloride readings reach an acceptable level. This release was within the pad area and did not extend past the berms. Nomac 79 is continuing drilling operations during the remediation. |
2115887115 | 2016-09-12 | Completion Testing | No Violations | An inspection was conducted on this site accompanied by Trish Cartmell. The well is currently awaiting completion efforts. Trish and I reviewed the remediation on site and determined that it was satisfactory. |
958086980 | 2020-4-16 0:00: | PL | No Violations | 0.30 |
For data sources see[10]