34-013-21078

Well Details

Well ID: 34-013-21078
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Smith Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001043
Farm/Lease Name: SON-UVA DIGGER
License Status: Producing
License Date: 2016-10-17
Spud Date: 2017-01-21
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2017-03-30
Well Total Depth: 22427.00 ft
Configuration: Horizontal
Latitude: 40.010000
Longitude: -80.950000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-06-20 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:6/20/2016, Expired Date:6/20/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2016-10-17 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:10/17/2016, Expired Date:10/17/2018 12:00:00 PM, Drilling unit acres:296.111, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-03-30
Correction to Well 2017-06-30 UPDATE TARGET/TAKE PER AS-DRILLED RCVD 5-22-17 ALE.
Completion Report Received 2017-11-01
Record Last Modified 2017-12-22
Correction to Well 2017-12-29 UPDATE TAKEPOINT/ACREAGE PER AS-DRILLED PLAT
Construction Permit Expires 2018-10-17

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-11-29 9779 9914 0
2017-11-29 22251 22346 0
22251 22346 0
9779 9914 0
9779 9914 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-05-22 H2O 15 12550 Bbl 467450 EVOLUTION WELL SERVICE STAGE 1 OF 75
2017-07-13 H2O 15 9187 Bbl 498940 EVOLUTION WELL SERVICE STAGE 75 OF 75 SEE IMAGES FOR STAGES 2-74

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 RICE DRILLING D LLC 1546978 0 81
2018 RICE DRILLING D LLC 6931106 0 362
2019 RICE DRILLING D LLC 1226234 0 87

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 RICE DRILLING D LLC Brine 21626 81
2018 RICE DRILLING D LLC Brine 128192 362
2019 RICE DRILLING D LLC Brine 15535 87

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1272885040 2018-8-14 0:00: PW No Violations 0.20
-1423322164 2019-9-17 0:00: PW No Violations 0.40
-1578655579 2019-8-27 0:00: PW No Violations 0.30
-2008750199 2018-8-23 0:00: PW No Violations 0.50
0515512090 2017-01-10 Drill / Deepen / Reopen No Violations I received a call from Clay with Rice Energy to notify me that Rice anticipates to spud pad on 01/11/2017.
0574293833 2018-07-10 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a three-string casing design with surface, intermediate and 5.5 inch diameter production casing, the well was currently in flow back operations. Annular pressure monitoring was in place, the 9.625-inch diameter intermediate casing gauge read 1515 pounds per square inch, the 13.375 inch diameter surface casing gauge read 60 pounds per square inch. Production equipment included an individual Gas Processing unit. Shared production equipment included a dehydrator, 2 phase separators, contact tower, and 3- 400-barrel purge tanks shared with 34013207790000, 34013207780000, 34013210770000, 34013210790000, 34013208700000. The well pad and all equipment were contained in an earthen dike with secondary containment around the production tanks. There were multiple Emergency Shutoff Devices on location, Identification tags were present, and production was up to date.
1009284402 2017-01-11 Drill / Deepen / Reopen No Violations I met with Clay, a representative with Rice Energy, and he advised me that Rice has elected to not start conductor work on this pad until further notice.
1272885040 2018-08-14 Production Wells No Violations Follow up inspection to a spill that was discovered on the well site on 08/14/2018. Upon inspection it was observed that crews were on site recovering fluid from a pond area next to the well pad entrance. The fluid entered the pond from the well site sometime between 08/10/2018 and when I discovered it on 08/14/2018. The fluid appeared to of leaked from (2) 500 barrel capacity fluid storage tanks that were situated on the well pad between the well head and the production tanks. The tanks were on location and used during the initial production flow back operation stages. The initial product identified on the well pad by visual site by the company was recovered by a mini excavator and skid steer loader. The product is being stored on site until it can be tested properly. The Division has appointed hydrologist Scott Schiner as the contact point lead man to work with the company and address the remediation-clean up and testing process.
1299732093 2020-3-3 0:00:0 PW No Violations 0.20
1427982778 2017-06-15 Completion Testing No Violations An onsite inspection, accompanied by Emergency Response Coordinator Trish Cartmell, revealed that the completion operations were underway and the anticipate to be completed by July.
1485056748 2017-01-21 Casing String Witnessed No Violations On site inspection to witness the conductor casing cement job with Express Drilling and Cementing Services. A 36 diameter conductor borehole has been drilled to 100 and 32 weld connection line pipe has been installed to 100. The casing was cemented with 275 sacks of class A cement and displaced with 75 barrels of fresh water. Cement returns were witnessed to surface inside the cellar.
1487683822 2017-02-19 Casing String Witnessed No Violations On location to witnes the cementing of the surface casing. The rig ran 20 casing with all the required float equipment to 519. O-Tex Pumping cemented it with 745 sacks of class H cement. 21 bbls of good cement were returned to the surface.
1534173208 2018-08-13 Production Wells No Violations On site inspection accompanied on this day by ODNR Inspector Ryan Armstrong. The well pad was equipped with 6 wells total all wells are currently in production. 3 wells were recently drilled and completed and 3 wells were drilled and completed 2014. The said well is producing off the 5.5 production casing through 2 primary master valves. Supportive equipment on site includes 3 gas processing units with 2 sand trap separators at each unit. The production fluid area consists of 3 steel construction 400 barrel fluid volume tanks situated inside a polymer lined steel containment dike area. The well recently was in the initial flow back operation stages and 2 steel construction 500 barrel capacity tanks were still situated on location between the well head and the production tanks. The tanks were placed inside a polymer lined area. While conducting my inspection I noticed that a reddish colored liquid that was on the well pad surface around the tanks and appeared to be leaking from under the liner the tanks were situated inside of. Also noted was the containment had a reddish colored fluid inside it. The fluid near the tanks was then field titrate tested for chlorides with both low and high level Quantab Chloride strip tests with the results showing chlorides exceeding the low range strip test above a level of 637 parts per million and also exceeding a high level strip test of 6,208 parts per million chlorides. A red cast was also visible in a depressed ditch line on the well pad surface. That area was followed a measured distance of 153 to a catch basin on the North West corner of the well pad. The catch basin had a 12 diameter drain pipe that traveled a measured distance of 100 and exited on the west side of the well pad into a defined ditch line. Also noted is the drain system supporting the catch basing has no shut off valve and the North side of the well pad has no earthen berm. At the exit point of the 12 pipe stressed vegetation could be seen along with the disc
1704744862 2019-03-06 Production Wells No Violations Status check inspection found that during the last phase of drilling on the pad (3) wells were drilled and completed identified as the #2 -#4 and #6 wells. All 3 wells are producing off the 5.5 diameter production casing through the (2) primary master valves set on the B section well head during the completion process. The company has also installed 2 diameter riser pipes onto the well head A&B sections, the riser pipes are equipped with valves and both electronic and manual gauges for the purpose of annular pressure monitoring. All (3) wells are selling through gas processing units. The production fluid facility consists of (3) steel 400 barrel tanks situated inside a polymer lined steel containment dike area.
2008750199 2018-08-23 Production Wells No Violations Follow up inspection to a spill that occurred on the well pad on or before 08/14/2018 found the (2) 500 barrel fluid volume tanks and the containment they were place in has been removed off site. The earthen material identified by the company as affected during the incident has been removed from the surface and placed in portable container boxes. The area off pad has not been addressed and the Division has requested a remediation plan. A violation was issued against 3401321077-0000.
515512090 2017-1-10 0:00: DD No Violations 0.50
574293833 2018-7-10 0:00: PW No Violations 0.50

For data sources see[9]

References