X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21212

Well Details

Well ID: 34-013-21212
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Goshen Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001517
Farm/Lease Name: DEL SCORCHO
License Status: Producing
License Date: 2017-11-09
Spud Date: 2017-10-09
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-08-08
Well Total Depth: 25981.00 ft
Configuration: Horizontal
Latitude: 40.010000
Longitude: -81.070000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-03-27 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/27/2017, Expired Date:3/27/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-11-09 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/9/2017, Expired Date:11/9/2019 12:00:00 PM, Drilling unit acres:444.1753, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2018-06-22 CHANGE TO TARGET AND TAKE POINT INFORMATION
Reached Total Depth 2018-08-08
Record Last Modified 2018-10-04
Construction Permit Expires 2019-11-09

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
25842 25891 0
9157 9342 0
9157 9342 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-16353934 2018-6-4 0:00:0 DD No Violations 2.00
-1818063590 2020-1-16 0:00: PW No Violations 0.30
-562820564 2019-3-4 0:00:0 CT No Violations 0.20
-783062871 2019-6-4 0:00:0 CT No Violations 0.50
0016353934 2018-06-04 Drill / Deepen / Reopen No Violations On the day of my inspection H&P 471 had drilled approximately 593 feet of cement and reached a total depth at 2165 feet which was 4 feet above the float collar. When total depth was reached they ran a gyro survey and loaded the hole with approximately 243 barrels of fresh water. The 13.375 inch diameter float collar was set at 2169 feet. Hosco Services was on location to perform a casing integrity test, the 13.375 inch diameter casing was pressured up to 502 pounds per square inch at 12:38 on 6/4/2018. After 5 min pressure had fallen to 496 pounds per square inch, and after the 30 minute test pressure was at 467 pounds per square inch. Company man Pat Smith Informed me that they would continue to drill out the shoe track, and begin drilling the 12.25 inch diameter deep intermediate portion of the well bore. He believed that they would be setting and cementing the 9.625 inch diameter casing on 6/8/2018.
0562820564 2019-03-04 Completion Testing No Violations Status check inspection found 6 wells present on the pad. The said well has been drilled and not completed. The well is equipped with a night cap with a manual gate valve on the night cap. There is a gauge on the valve but the valve is closed. No annular pressure monitoring is present on the A or B section. The Del Scorcho # 8 #10 and #12 wells have been drilled but are not completed. The number 2 #4 and # 6 wells are in the flow back production stages and are not equipped with annular pressure monitoring either. There is a large above ground storage tank on location. The well pad perimeter does have a sound wall erected on top of the earthen berm. A third party midstream pipe line was installed ant the earthen berm was removed and not properly put back. I did notify ODNR Engineer Technician Anthony Carson on this day of the deficiency related to the berm.
0783062871 2019-06-04 Completion Testing No Violations On the day of my inspection I witnessed Halliburton Pressure Pumping, Schlumberger wireline were currently on location and had just completed the 39th stage of the stimulation process out of a total of 84 total stages. At the time of my inspection the stimulation process was currently shut down due to a wireline failure at surface. Annular pressures were being monitored on every well on the pad. After speaking with EQT consultant Brad Wolff he informed me that they had a Schlumberger wireline failure at surface, they intend to switch out the Schlumberger wireline truck and tool. I informed EQT consultant Brad Wolff to keep me updated with any problems or situations that occur during the stimulation process.
1321804381 2017-10-10 Casing String Witnessed No Violations physical address: 62827 johnson south road, bethesda oh 43719. On the day of my inspection I witnessed Express energy had augured a 36 inch diameter hole to 100 feet. 100 feet of 30 inch diameter conductor casing was run. Express was onsite with 275 sacks of class A cement. Additives include 2% CaCl, and .5 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. 50% percent excess ran. Cement was displaced with 70 barrels of fresh water. 12 barrels of cement returned to surface.
1922781693 2018-05-30 Casing String Witnessed No Violations On this day, I am onsite to witness the 18.625-inch diameter surface casing cement job with BJ Services. The H&P FlexRig 471 rig drilled a 24--inch diameter J-55 87.5 lb./ft. casing into the wellbore. BJ Services circulated the hole with 192 barrels of water and pumped 35 barrels of gel spacer, ahead of cement. They cemented the casing with 145 barrels total volume (680 sacks) of Class A cement with a weight of 15.6 pounds per gallon, verified by scale, and a 1.2 yield. It was displaced with 100 barrels of fresh water. The plug landed with 146 pounds per square inch and then pressured up to 670 pounds per square inch. It was noticed that the cement-head had a leak and the pressure declined 25 psi per minute for 5 minutes. The floats held and 1 barrel was bled back. 15 barrels of cement returns were brought to surface. Update on 5/31/2018 Company Man, Pat Smith, informed me that they waited on the cement for 6 hours, and then retested the casing to 300 psi, for 30 minutes, and the pressure held.
2029958474 2018-12-20 Completion Testing No Violations Status check inspection found the well drilling process complete and the well equipped with a night cap on the B section. The well has not been stimulated. 6 wells are present on the pad that have been drilled and only (2) are in production.
280366541 2020-5-7 0:00:0 PW No Violations 0.20
412440942 2019-7-11 0:00: CT No Violations 0.50

For data sources see[4]

References