Well Details

Well ID: 34-013-21216
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Goshen Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001517
Farm/Lease Name: DEL SCORCHO
License Status: Producing
License Date: 2017-11-09
Spud Date: 2017-09-30
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-03-21
Well Total Depth: 21331.00 ft
Configuration: Horizontal
Latitude: 40.010000
Longitude: -81.070000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-03-27 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/27/2017, Expired Date:3/27/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-11-09 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/9/2017, Expired Date:11/9/2019 12:00:00 PM, Drilling unit acres:467.3381, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-03-21
Completion Report Received 2019-02-25
Record Last Modified 2019-03-16
Construction Permit Expires 2019-11-09

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-03-15 10518 10685 0
2019-03-15 20979 21146 0
20979 21146 0
10518 10685 0
10518 10685 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-09-22 H2O 15 9792 Bbl 44288 PRO FRAC STAGE 2 OF 55
2018-10-15 H2O 15 9371 Bbl 81955 PRO FRAC STAGE 55 OF 55…SEE IMAGES FOR OTHER STAGES

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2019 RICE DRILLING D LLC 1312637 0 69

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2019 RICE DRILLING D LLC Brine 45880 69

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1210897350 2019-3-4 0:00:0 PW No Violations
-250064705 2020-7-1 0:00:0 PW No Violations 0.50
-266759482 2020-1-16 0:00: PW No Violations 0.30
-269935447 2020-5-7 0:00:0 PW No Violations 0.20
0228559182 2018-10-29 Completion Testing No Violations On site inspection found the well drilling and stimulation process is now complete and crews are on site preparing for the completion drill out process. The Service rig owned by CWS will arrive tonight and rig up on the H-6 well. A company identified as Tecton will handle the flow back operations with the company men indication no wells will be put into flow back until the drill out operations are complete. 55 total stages were complete. The fluid to be used to drill out was weighed and is 9:1 pound per gallon brine from other production operations in the area. The polymer containment that that the service rig will be situated on appears to be in good repair and free of well bore material. The well pad boundary does have a sound barrier in place on 3 sides. There is a above ground storage tank on location that does have bring water in it. The production fluid facility has been erected and consists of a total of 6-500 barrel capacity steel tanks situated inside a polymer lined steel containment dike area. All 3 wells present that were recently completed have annular pressure monitoring in place on the 13.375 and 9.625 well head sections along with an additional gauge present to monitor the well head B section seal area between the 5.5 and 9.625 diameter casing strings.
1210897350 2019-03-04 Production Wells No Violations Status check inspection found 6 wells present on the location with all 6 being drilled, however only (3) have been recently stimulated and are in the flow back production stages. The (3) producing wells are the # 2-#4 and #6 wells. The wells are producing through choke manifold systems into a gas processing unit. The said well is producing off the 5.5 diameter production casing through a primary master valve with a in line emergency shut down valve present between the well head and choke valve. The 5.5 casing on the said well is equipped with an electronic transducer only with no manual gauges present on any portion of the well head to confirm pressure. No annular pressure monitoring is in place on the well head A or B sections. I have informed the company men on site to install annular pressure monitoring on all 6 wells present on the pad. Production equipment on location consists of (4) gas processing units along with a production facility that consists of (6) steel 500 barrel capacity tanks situated inside a polymer lined steel containment dike area. Addressing the preliminary restoration- The well pad surface and lease road are stone surface construction and in good repair. There is a large above ground storage tank on location that is reported to contain fresh water only that will need removed along with the sound wall barrier that is erected on the earthen berm before the restoration can be signed off on.
1425816072 2018-02-13 Drill / Deepen / Reopen No Violations On the day of my inspection H&P Rig 471 was working on preparing the site for drilling operations to commence by rigging up all necessary equipment.
1506869708 2017-10-01 Casing String Witnessed No Violations physical address: 62827 johnson south road, bethesda oh 43719. On the day of my inspection I witnessed Express energy had augured a 36 inch diameter hole to 100 feet. 100 feet of 30 inch diameter conductor casing was run. Express was onsite with 275 sacks of class A cement. Additives include 2% CaCl, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% percent excess ran. Cement was displaced with 70 barrels of fresh water. 12 barrels of cement returned to surface.
1545315166 2018-12-20 Completion Testing No Violations Status check inspection found the well drilling process complete. The well is equipped with a lower A and upper B section well head with (2) primary master valves and a flow cross in place. The well is tied into a choke manifold system but not in production. The well has not been stimulated at this point. 6 wells total are present on the pad all drilled but only 2 are in production.
2079208637 2018-03-20 Casing String Witnessed No Violations H&P Rig 471 was running their 5.5-inch diameter casing into the well bore. Casing depth will be approximately 21,315 feet. Once they complete running this casing into the well bore BJ Cementing Services will be on site to cement the casing in place.
228559182 2018-10-29 0:00 CT No Violations 0.50

For data sources see[9]

References