If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-21250 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.9,"lon":-80.93,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Washington Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-001520 | |
Farm/Lease Name: HORSESHOE 210088 | |
License Status: Producing | |
License Date: 2017-11-27 | |
Spud Date: 2017-12-19 | |
Spud Drilling Contractor: PIONEER DRILLING | |
Final Drill Date: 2018-04-03 | |
Well Total Depth: 23807.00 ft | |
Configuration: Horizontal | |
Latitude: 39.900000 | |
Longitude: -80.930000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-05-25 | Proposed Formations:TRENTON, Issued Date:5/25/2017, Expired Date:5/25/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-11-27 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/27/2017, Expired Date:11/27/2019 12:00:00 PM, Drilling unit acres:663.085, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-04-03 | |
Record Last Modified | 2018-08-09 | |
Correction to Well | 2018-08-31 | TAKE TARGET AS-DRILLED |
Construction Permit Expires | 2019-11-27 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
23647 | 10507 | 0 | |
23647 | 10507 | 0 |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2096865217 | 2018-7-31 0:00: | CT | No Violations | 0.10 |
-899267340 | 2020-10-20 0:00 | PW | No Violations | 0.20 |
-920934483 | 2019-7-30 0:00: | PW | No Violations | 0.40 |
0176231226 | 2018-03-23 | Drill / Deepen / Reopen | No Violations | Pioneer Rig 71 had reached total depth in the 12.25-inch diameter open hole section of the well bore. They were currently performing a reamer run. Following the reamer run they will run their 9.625-inch diameter casing string to approximately 9261 feet. Stingray Cementing Services will provide the cementing procedure for this section of the well bore. |
1103688779 | 2020-2-25 0:00: | PW | No Violations | 0.20 |
1533062474 | 2018-07-31 | Completion Testing | No Violations | Status check inspection found the well drilling process is complete and there is a night cap on the well head B section. Crews are on site installing the subsurface production equipment such as flowlines etc. 6 wells have been drilled on the well pad. |
1534063899 | 2019-04-11 | Completion Testing | No Violations | |
1560431186 | 2019-6-13 0:00: | CT | No Violations | 0.20 |
1728462370 | 2017-12-20 | Casing String Witnessed | No Violations | Location address: 55950 Goddard Rd, Beallsville. On the day of my inspection I witnessed Lightning had augured a 36 inch diameter hole to 110 feet. 110 feet of 26 inch diameter conductor casing was run. Stingray was onsite with 430 sacks of class A cement. Additives include 2% CaCl and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.21. 30 percent excess ran. 15 barrels of gel ahead of cement. Cement was displaced with 55 barrels of fresh water. 15 barrels of cement returned to surface. |
176231226 | 2018-3-23 0:00: | DD | No Violations | 1.00 |
2096865217 | 2018-07-31 | Completion Testing | No Violations | Status check inspection found the well drilling process is complete and there is a night cap on the well head B section. Crews are on site installing the subsurface production equipment such as flowlines etc. 6 wells have been drilled on the well pad. The drilling rig mouse hole has been filled with cement. |
417983113 | 2020-4-29 0:00: | PW | No Violations | 0.20 |
For data sources see[4]