If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-21252 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.9,"lon":-80.93,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Washington Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-001520 | |
Farm/Lease Name: HORSESHOE 210704 | |
License Status: Producing | |
License Date: 2018-04-11 | |
Spud Date: 2017-12-21 | |
Spud Drilling Contractor: PIONEER DRILLING | |
Final Drill Date: 2018-05-28 | |
Well Total Depth: 24672.00 ft | |
Configuration: Horizontal | |
Latitude: 39.900000 | |
Longitude: -80.930000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-05-25 | Proposed Formations:TRENTON, Issued Date:5/25/2017, Expired Date:5/25/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2018-04-11 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:4/11/2018, Expired Date:4/10/2020 12:00:00 PM, Drilling unit acres:673.838, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-05-28 | |
Record Last Modified | 2018-09-28 | |
Construction Permit Expires | 2020-04-10 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
24520 | 10563 | 0 | |
24520 | 10563 | 0 |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-347123805 | 2020-4-29 0:00: | PW | No Violations | 0.20 |
-637172635 | 2019-4-11 0:00: | CT | No Violations | 0.50 |
0637172635 | 2019-04-11 | Completion Testing | No Violations | |
1007289410 | 2020-10-20 0:00 | PW | No Violations | 0.20 |
1156568041 | 2018-07-31 | Completion Testing | No Violations | Status check inspection found the well drilling process is complete and there is a night cap on the well head B section. Crews are on site installing the subsurface production equipment such as flowlines etc. 6 wells have been drilled on the well pad. The drilling rig mouse hole has been filled with cement. |
1298481360 | 2019-6-13 0:00: | CT | No Violations | 0.20 |
1485657863 | 2020-2-25 0:00: | PW | No Violations | 0.20 |
For data sources see[4]