If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-21253 | |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Washington Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-001520 | |
Farm/Lease Name: HORSESHOE 210704 | |
License Status: Producing | |
License Date: 2018-04-11 | |
Spud Date: 2017-12-22 | |
Spud Drilling Contractor: PIONEER DRILLING | |
Final Drill Date: 2018-05-13 | |
Well Total Depth: 24850.00 ft | |
Configuration: Horizontal | |
Latitude: 39.900000 | |
Longitude: -80.930000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-05-25 | Proposed Formations:TRENTON, Issued Date:5/25/2017, Expired Date:5/25/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2018-04-11 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:4/11/2018, Expired Date:4/10/2020 12:00:00 PM, Drilling unit acres:673.838, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-05-13 | |
Record Last Modified | 2018-08-27 | |
Correction to Well | 2018-08-31 | TAKE TARGET AS-DRILLED |
Construction Permit Expires | 2020-04-10 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
24673 | 10839 | 0 | |
24673 | 10839 | 0 |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1224260463 | 2019-6-13 0:00: | CT | No Violations | 0.20 |
-135645435 | 2018-2-13 0:00: | CS | No Violations | 4.50 |
-1647503244 | 2019-4-11 0:00: | CT | No Violations | 0.20 |
-1687252098 | 2019-7-30 0:00: | PL | No Violations | 0.40 |
-2125583138 | 2020-2-25 0:00: | PW | No Violations | 0.20 |
-527850134 | 2020-4-29 0:00: | PW | No Violations | 0.20 |
-736752741 | 2020-10-20 0:00 | PW | No Violations | 0.20 |
0135645435 | 2018-02-13 | Casing String Witnessed | No Violations | On the day of my inspection Pioneer 71 had reached total depth in the 17.5-inch diameter open hole section of the well bore at 1395 feet. The 13.375-inch diameter casing was ran to total depth. Bow spring centralizers were utilized to provide proper stand-off from the well bore. Stingray Cementing provided the cementing procedures. A safety meeting was held prior to cementing operations to ensure safety precautions were met and go over the cementing procedures. Stingray ran 264 barrels of Class A cement with .3 percent Calcium Chloride and .25 pounds of celluflake per sack. The cement weight of 15.6 pounds per gallon was verified using a pressurized cement scale. The cementing procedure produced cement returns to surface. |
1131363464 | 2018-07-31 | Completion Testing | No Violations | Status check inspection found the well drilling process is complete and there is a night cap on the well head B section. Crews are on site installing the subsurface production equipment such as flowlines etc. 6 wells have been drilled on the well pad. The drilling rig mouse hole has been filled with cement. |
1519756516 | 2018-02-21 | Casing String Witnessed | No Violations | On the day of my inspection Pioneer Rig 71 had reached total depth in the 12.25-inch diameter open hole section of the well bore at a depth of 9328 feet. The 9.625-inch diameter casing was ran to total depth. Stingray Cementing Services was on site and cemented the casing with a lead cement of 1146 sacks of Class H cement with a yield of 2.29cuft/sk. For the tail cement they ran 1788 sacks of Class H cement with a yield of 1.27cuft/sk. There was a safety meeting held prior to the job commencing. The cementing procedures produced 240 barrels of cement to surface. |
1647503244 | 2019-04-11 | Completion Testing | No Violations | Status check inspection found Stingray pressure pumping service along with Nine Energy wireline on location completing wells # 4 #5 on location. The #1 #2 and # 3 wells will have the stimulation process started on 04/15/2019. The said well is equipped with a lower A and upper B section with 2 primary master valves present. The 2 primary master valves present are owned by B&B. All annular pressures are being checked and recorded daily. |
For data sources see[4]