X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21283

Well Details

Well ID: 34-013-21283
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Pease Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001499
Farm/Lease Name: LANCE 210970
License Status: Producing
License Date: 2017-09-07
Spud Date: 2017-08-24
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2017-12-27
Well Total Depth: 18167.00 ft
Configuration: Horizontal
Latitude: 40.120000
Longitude: -80.750000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-08-17 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:8/17/2017, Expired Date:8/17/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-09-07 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:9/7/2017, Expired Date:9/7/2019 12:00:00 PM, Drilling unit acres:522.206, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2017-09-22 CHANGE TO WELL NUMBER, LEASE NAME AND PERMIT NUMBER AS A RESULT OF A LOST HOLE ON THE DRILL PAD.
Reached Total Depth 2017-12-27
Correction to Well 2018-08-31 TAKE TARGET AS-DRILLED
Record Last Modified 2019-04-15
Construction Permit Expires 2019-09-07

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
18007 10497 0
18007 10497 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/02/2019 01/21/2019 10340 11,258,700.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (28%) Oxy Acidizing Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.0601572 62112.8
Water 7732-18-5 72 0.15469 159719
Sand (Silica) Muskie Proppant Silica Substrate 14808-60-7 100 8.66113 8,942,680.0
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control Coconut oil acid diethanolamine 68603-42-9 5 0.00006421 66.299
Olefin Proprietary 5 0.00006421 66.299
2-Ethylhexanol 104-76-7 10 0.000128423 132.598
2-Propyn-1-ol 107-19-7 5 0.00006421 66.299
Acetic acid 64-19-7 65 0.00083475 861.886
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00006421 66.299
Fatty acids, tall oil 61790-12-3 5 0.00006421 66.299
Methanol 67-56-1 35 0.000449481 464.093
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 45 0.0381868 39428.2
Phosphonic Acid, [[(Phosphonomethyl)imino]bis[6,

1-hexanediylnitrilobis (methylene)]]tetrakis-, sodium salt

35657-77-3 30 0.00662433 6839.67
Oleic Acid Diethanolamide 93-83-4 2 0.00169719 1752.37
Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.00169719 1752.37
Water 7732-18-5 30 0.00662433 6839.67
Didecyl dimethyl Ammonium Chloride 7173-51-5 10 0.00201222 2077.63
2-Ethylhexanol 104-76-7 10 0.000128423 132.598
Quaternary Ammonium Compounds,

Benzyl-C12-C16-alkyldimethyl, Chlorides

68424-85-1 10 0.00201222 2077.63
Methanol 67-56-1 35 0.000449481 464.093
Petroleum Distillate 64742-47-8 20 0.0169719 17523.6
Ethanol 64-17-5 5 0.00100611 1038.81
Fatty acids, tall oil 61790-12-3 5 0.00006421 66.299
Olefin Proprietary 5 0.00006421 66.299
Ammonium Chloride 12125-02-9 1 0.000848596 876.182
Water 7732-18-5 60 0.0120733 12465.8
Water 7732-18-5 72 0.15469 159719
Ethanol, 2,2'-oxybis- 111-46-6 5 0.00110405 1139.94
2-Propyn-1-ol 107-19-7 5 0.00006421 66.299
Coconut oil acid diethanolamine 68603-42-9 5 0.00006421 66.299
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00006421 66.299
Plexslick 920 Chemplex Friction Reducer Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.00169719 1752.37
Petroleum Distillate 64742-47-8 20 0.0169719 17523.6
Water 7732-18-5 45 0.0381868 39428.2
Copolymer of 2-propenamide 69418-26-4 30 0.0254579 26285.5
Ammonium Chloride 12125-02-9 1 0.000848596 876.182
Oleic Acid Diethanolamide 93-83-4 2 0.00169719 1752.37
B2512 Moon Biocide Ethanol 64-17-5 5 0.00100611 1038.81
Quaternary Ammonium Compounds,

Benzyl-C12-C16-alkyldimethyl, Chlorides

68424-85-1 10 0.00201222 2077.63
Didecyl dimethyl Ammonium Chloride 7173-51-5 10 0.00201222 2077.63
Glutaraldehyde 111-30-8 30 0.00603665 6232.89
Water 7732-18-5 60 0.0120733 12465.8
Water Gulfport Energy Carrier/Base Fluid Water 7732-18-5 100 90.9957 93,953,800.0
Plexaid 627W-N Chemplex Scale Inhibitor Ethanol, 2,2'-oxybis- 111-46-6 5 0.00110405 1139.94
Water 7732-18-5 30 0.00662433 6839.67
Phosphonic Acid, [[(Phosphonomethyl)imino]bis[6,

1-hexanediylnitrilobis (methylene)]]tetrakis-, sodium salt

35657-77-3 30 0.00662433 6839.67
Ethylene Glycol 107-21-1 35 0.00772838 7979.62

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1082126709 2018-8-22 0:00: CT No Violations
-1418416547 2020-5-12 0:00: PW No Violations 0.20
-1437442742 2019-3-20 0:00: CT No Violations 0.10
-1511734472 2019-1-2 0:00:0 CT No Violations 0.40
0198703099 2017-08-28 Drill / Deepen / Reopen No Violations On the day of my inspection I found that HAD drilling has set 97 feet of 26 inch diameter casing by way of concentric drilling. Mouse hole was also concentrically drilled. Cellars are to be cemented tomorrow morning. Pad address is 57084 Nixon Run Road, Martins Ferry Ohio 43935. Spudded 8/24/17.
0484028835 2019-05-02 Completion Testing No Violations Status check inspection found 7 wells present on the well pad. All 7 wells have been drilled and completed and the completion plugs drilled out. The completion rig has finished up and is off location. All 7 wells are equipped with 2 primary master valves and will produce off the 5.5 diameter production casing. Flowback has not moved onto location and began rigging up yet.
1082126709 2018-08-22 Completion Testing No Violations Status check inspection found the well drilling process is now complete. The well head configuration consists of a Cactus Company lower A section that is attached to the 13.375 diameter casing string, this is a new style well head system that the 9.625 and 5.5 diameter casing string land out in the A section by the means of mandrill hanger systems. The B section well head assembly consists of the 5.5 production casing flow cross only. The company has removed the lower and upper completion master valves and installed a service cap and 2 butterfly style valves to allow monitoring and pressure relief of the internal of the 5.5 diameter production casing which has not had the toe sleeves open or the initial set of perforations shot in the casing. A company identified as Full Circle is on site installing riser pipes on the well head A sections to monitor annular pressures. 7 wells are present on location and no production equipment is present on location. A mid stream pipeline is being installed to the pad midstream service point. 7 wells are present and have been drilled on the pad. The rig that drilled the wells identified as H&P 628 is disassembled and stacked out on location.
1230408779 2018-02-20 Completion Testing No Violations On the day of my inspection the site was still being occupied by H&P Rig 628. Although the rig was on location it was laid down and await mobilization off site. The trailers where the employees stayed were still on location. The well was equipped with 5.5-inch diameter production casing and was shut in. The well is awaiting completion operations at this time.
1437442742 2019-03-20 Completion Testing No Violations Status check inspection found the well drilling and stimulation process complete on all 7 wells on the pad. Annular pressure monitoring is installed on each well on the pad with no pressures noted on any well above 500 psi. The tin horn cellars are free from standing fluid. A 3rd party contractor identified as shale pro was on site installing the surface production equipment, all sub surface equipment was previously installed. There are some areas of disturbance around the well pad perimeter where the mid stream operator installed the mid stream pipe line and the fresh water flow line was located during stimulation, these areas will need vegetation established. The company has a service rig on the neighboring Ridgetop pad and once drill out is complete there the rig will move over to the said well pad.
1508944535 2017-10-25 Casing String Witnessed No Violations On site inspection to witness the surface casing installation and cement job with H&P Drilling rig 628 on the hole along with Stingray Cement Service and Wyoming Casing. The rig has drilled a 24 diameter borehole to a measured depth of 466 with the depth measured off of a drilling rig Kelly Bushing Heigth of 26.8. A coal seam was encountered between the depths of 407 and 418 with air circulation maintained and the hole loaded with fresh water and circulated prior to pulling the drill string. Upon recovering the drill string the rig then inserted a total of 466 of 18.625 diameter casing with a guide shoe and float collar casing equipment ran along with a Wetherford swell packer set at 356 to 382. The last casing joint was circulated into well bore with fresh water and the hole maintained fluid level to surface. Stingray Cement Service cemented the casing using a 131 barrel cement mix consisting of 750 sacks of class A cement with circulation lost 65 barrels into the pumping of the cement. At that point the initial cement job to was completed and the cement plug dropped and displacement initiated and at approximately 90 barrels into displacement circulation was regained to surface and cement returns were witnessed to surface at 110 barrels into displacement with 19 barrels of cement to surface. The plug was landed at 300 psi and the casing pressure tested to 692 psi. The casing pressure was then increased in 200 psi increments until the packer inflated at 1,310 psi and confirmed set. The casing pressure was then released and the casing floats held.
1510529550 2017-11-12 Casing String Witnessed No Violations On site inspection to witness the surface casing cement job with H&P Drilling rig 628 on location along with Wyoming Casing and Stingray Cement Service. The rig has drilled a 24 diameter surface borehole to a measured depth of 462 off of a drilling rig Kelly Bushing heigth of 28.6 above ground level elevation. The rig implemented (5) one gallon soap sweeps upon reaching total depth and reported a slight loss of weight on bit while drilling through the coal seam at 406 to 418 but maintained 10,000 pounds bit weight and air circulation indicating no true mine void. The rig pulled the drill string and inserted the 18.625 diameter 87.5 pound per foot buttress thread casing with a casing guide shoe ran along with a float collar and a Wetherford Inflatable packer set in the string between the depths of 347 to 374. The casing was installed and went right to bottom with no restriction of cuttings or cave in. The rig circulated the last 2 casing joints into the well bore and pumped total pipe and annular capacity x 2 attempting to gain circulation prior to cementing with no success the job was turned over to Stingray Cement Service. Initially prior to the installation of the cement head we dropped a gauge line down the inside of the casing and tagged a static fluid level at 142( see conductor report of void at 110-possible old mine). Stingray then installed the cement head and pumped 100 barrels of fresh water at a rate of 8 barrel (bbl) a minute with a final lift pressure of 400 psi before beginning a 25 barrel 6% gel sweep with loss circulation material followed by a 170 barrel cement mix consisting of 806 sacks of class A cement. The cement was displaced with 128 barrels of fresh water with the displacement rate maintained at 4 barrel a minute with no lift pressure seen over 150 psi and no circulation to surface. The cement plug was landed at 111 psi and the casing was pressure tested to 700 psi before increasing the pressure in increment until the packer inflated at 1,
1511734472 2019-01-02 Completion Testing No Violations On this day I attend the pre stimulation safety meeting along with all current contractors and company representatives. 7 wells are present on the pad, all well have the drilling process complete and are rigged up to be stimulated. The stimulation company is Stingray Pressure Pumping Service and the wireline is Renegade Wireline along with Select Energy Flowback. The well head A & B Sections are Cactus with the completion stack being from B&B. The well head B section which is the 5.5 x 9.625 annular space does have pressure control attached with electronic transducers in place to monitor pressure. Transducers are also attached to the A section which monitors between the 9.625 and 13.375 well head section. The well pad surface is of stone construction with earthen berms in place.
1678314821 2017-11-06 Preliminary Restoration No Violations This location has met the requirement of the Ohio Revised Code regarding preliminary restoration. The restoration is passed at this time. The operator shall continue to monitor the site and ensure that the location remains stable.
198703099 2017-8-28 0:00: DD No Violations 1.00
2116009889 2020-10-26 0:00 PW No Violations 0.20
484028835 2019-5-2 0:00:0 CT No Violations 0.20
847393702 2020-1-10 0:00: PW No Violations 0.20

For data sources see[5]

References