34-019-20286

Well Details

Well ID: 34-019-20286
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Brown Township
Operator Name: R E GAS DEVELOPMENT LLC
Well Pad ID:
Farm/Lease Name: CLARK ETAL UNIT
License Status: Final Restoration
License Date: 2016-03-23
Spud Date: 1967-06-09
Spud Drilling Contractor:
Final Drill Date: 1967-08-24
Well Total Depth: 8823.00 ft
Configuration: Vertical
Latitude: 40.650000
Longitude: -81.100000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1967-05-29 311 STOCKER & SITLER INC GeoDate 5/29/67
Original Spud 1967-06-09 GL=1166.6 SAMPLE NUMBER : SD
Completed 1967-08-24 GL=1166.6 SAMPLE NUMBER : SD
Reached Total Depth 1967-08-24 GL=1166.6 SAMPLE NUMBER : SD
Change of Owner 2003-09-08 Operator changed from 311, STOCKER & SITLER INC to 28, CGAS EXPLORATION
Change of Owner 2007-04-27 Operator changed from 28, CGAS EXPLORATION to 7578, ENERVEST OPERATING LLC well was plugged prior to transfer
Change of Owner 2016-03-18 Operator changed from 28, CGAS EXPLORATION to 8894, R E GAS DEVELOPMENT LLC
APP 2016-03-23 Proposed Formations:TREMPEALEAU, Issued Date:3/23/2016, Expired Date:3/23/2018 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2016-04-23 GL=1166.6 SAMPLE NUMBER : SD
Record Last Modified 2017-06-22 GL=1166.6 SAMPLE NUMBER : SD
Construction Permit Expires 2018-03-23 GL=1166.6 SAMPLE NUMBER : SD

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 5598 5644 0
5598 5644 0
5598 5644 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
N2 0 148 Mscf 0
H2O 0 1480 Bbl 45000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 BELDEN & BLAKE CORPORATION 1032.00 273.00 0
1985 BELDEN & BLAKE CORPORATION 892.00 265.00 0
1986 BELDEN & BLAKE CORPORATION 698.00 202.00 365
1987 BELDEN & BLAKE CORPORATION 767.00 286.00 365
1988 BELDEN & BLAKE CORPORATION 684.00 193.00 284
1989 BELDEN & BLAKE CORPORATION 229.00 292.00 363
1990 BELDEN & BLAKE CORPORATION 0.00 158.00 345
1991 BELDEN & BLAKE CORPORATION 0.00 102.00 365
2004 PLEASANT HILL OIL CO 0.00 247.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 BELDEN & BLAKE CORPORATION Brine 0 0
1985 BELDEN & BLAKE CORPORATION Brine 89 0
1986 BELDEN & BLAKE CORPORATION Brine 72 365
1987 BELDEN & BLAKE CORPORATION Brine 56 365
1988 BELDEN & BLAKE CORPORATION Brine 57 284
1989 BELDEN & BLAKE CORPORATION Brine 192 363
1990 BELDEN & BLAKE CORPORATION Brine 114 345
1991 BELDEN & BLAKE CORPORATION Brine 28 365
2004 PLEASANT HILL OIL CO Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1191317710 2016-3-21 0:00: PB No Violations
0597534182 2016-03-29 Plug / Plug Back No Violations The Clark # 1 well was being prepared , by Rex Energy, for re-entry and re-plugging due to the close proximity to the Goebeler # 3Hs ( 34-019-2-2692, Washington Twp., Carroll Cty., R E Gas Development ) lateral wellbore. Beaver Excavating had cut and compacted the access road and location. The 11.75 casing stump had been dressed and a five (5) thousand psi flange welded on top. A blind flange ( night cap ) was bolted in place. I did not identify any violations during this inspection.
1191317710 2016-03-21 Plug / Plug Back No Violations I inspected the cellar construction at the Clark Unit # 1 on 3/21/2016. Rex Energy plans to re-enter the Clark Unit # 1 P&Ad wellbore and replug utilizing present day methods. This task is being undertaken by Rex, due to the close proximity to the lateral wellbore emanating from the Goebeler # 3H ( 34-019-2-2692, Harrison Twp., Carroll Cty., R E Gas Development ). Rex excavated around the casings and placed a six (6) X five (5) tin whistle around the casings and backfilled to construct the cellar. An expanded metal screen was placed over the cellar. The excavation revealed multiple casing strings starting with 24 conductor, 16 surface casing and 11.75 intermediate string. No violations identified during this inspection.
1403509531 2011-08-03 Final Restoration No Violations RBDMS - P/A 10-10-1969. Well location is now a crop field (corn). FR - passed.According to our database, this well was plugged on 10-10-1969. No visual evidence of well or production equipment. Site is a corn field. Final Restoration passed.
1531323793 2018-07-11 Final Restoration No Violations I conducted a final restoration inspection of this plugged well which was drilled-out and re-plugged by R.E. Gas Development in 2016 due to the proximity of the lateral wellbore to the Goebeler #3H well (34-019-2-2692). The well is located in a crop field which is currently being farmed and I located no surface expression of the well. Road mats were used during operations, so no lease road needed to be restored. Final restoration can be passed.
1631767919 2016-03-31 Plug / Plug Back No Violations I inspected the Clark #1 location to review the site construction prior to plugging activities commencing. Containment fabric had been placed over the entire location. Silt fencing had been positioned to control offsite erosion on the southwestern perimeter of the location. Newpark Services were on site placing rig matting on location and the access road. No violations identified during this inspection.
597534182 2016-3-29 0:00: PB No Violations

For data sources see[9]