If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22172 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.52,"lon":-81.12,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Union Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000348 | |
Farm/Lease Name: RUTLEDGE 10-14-6 | |
License Status: Producing | |
License Date: 2012-09-18 | |
Spud Date: 2012-10-19 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2012-11-04 | |
Well Total Depth: 13582.00 ft | |
Configuration: Horizontal | |
Latitude: 40.520000 | |
Longitude: -81.120000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-06-21 | Proposed Formations:POINT PLEASANT, Issued Date:6/21/2012, Expired Date:6/21/2014 12:00:00 PM, Drilling unit acres:153.24, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2012-09-18 | Proposed Formations:POINT PLEASANT, Issued Date:9/18/2012, Expired Date:9/18/2014 12:00:00 PM, Drilling unit acres:153.24, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2012-09-21 | CORRECTION TO WELL NUMBER. |
Correction to Well | 2012-09-28 | CORRECTION TO FOOTAGE, SURFACE & TARGET. |
APP | 2012-10-03 | Proposed Formations:POINT PLEASANT, Issued Date:10/3/2012, Expired Date:10/3/2014 12:00:00 PM, Drilling unit acres:153.24, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2012-10-16 | Proposed Formations:POINT PLEASANT, Issued Date:10/16/2012, Expired Date:10/16/2014 12:00:00 PM, Drilling unit acres:153.24, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2012-11-04 | |
Correction to Well | 2013-04-26 | UINT SIZE DECREASED TO 134.20 ACRES. CORRECTION TO SURFACE FOOTAGE AND TARGET INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2013-06-19 | |
Construction Permit Expires | 2014-09-18 | |
Record Last Modified | 2019-04-08 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-06-21 | 8508 | 13462 | 640 |
8508 | 13462 | 640 | |
8508 | 13462 | 640 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 12/13/2012 | 12/13/2012 | 7579.00 | 4,182,906.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ||||||||
Acid, Hydrochloric 15pct, A264,
B244, B317, J475, J580, J609, J610, L058, L071, Northern White Sand, 100 Mesh Sand |
Schlumberger | Acid, Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, KCl Substitute, Scale Inhibitor, Proppant - Natural | Guar gum | 9000-30-0 | 0.42 | 0.08 | ||
Glutaraldehyde | 111-30-8 | 0.03 | 0.00690000 | |||||
Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 0.00686000 | 0.00135000 | |||||
Fatty acids, tall-oil | 61790-12-3 | 0.00268000 | 0.00053000 | |||||
Sodium sulfate | 7757-82-6 | 0.02 | 0.00403000 | |||||
Boric acid, dipotassium salt | 1332-77-0 | 0.07 | 0.01 | |||||
Trisodium phosphate | 7601-54-9 | 0.00408000 | 0.00080000 | |||||
Glycerin, natural | 56-81-5 | 0.02 | 0.00469000 | |||||
Urea | 57-13-6 | 0.00330000 | 0.00065000 | |||||
Ammonium sulfate | 7783-20-2 | 0.04 | 0.00933000 | |||||
Methanol | 67-56-1 | 0.00365000 | 0.00072000 | |||||
Potassium hydroxide | 1310-58-3 | 0.02 | 0.00469000 | |||||
Sodium erythorbate | 6381-77-7 | 0.00367000 | 0.00072000 | |||||
Acrylamide-sodium-2-acrylamido-2-methlypropane
sulfonate copolymer |
38193-60-1 | 0.05 | 0.00988000 | |||||
Quartz | 14808-60-7 | 97.88 | 19.27 | |||||
Hydrochloric acid | 7647-01-0 | 1.00 | 0.19 | |||||
Choline chloride | 67-48-1 | 0.42 | 0.08 | |||||
2-Propenoic acid, 2-methyl-, polymer
with sodium 2-methyl-2-((1-oxo-2- propen-1-yl)amino)-1-propanesulfonate (1:1) |
136793-29-8 | 0.00537000 | 0.00106000 | |||||
Fresh Water | Carrier/Base Fluid | Water | 7732-18-5 | 100.00 | 83.90 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-12-17 | H2O | 15 | 5679 Bbl | 385980 | Schlumberger | STAGE 11
40 SHOTS |
2012-12-13 | H2O | 15 | 10419 Bbl | 387100 | Schlumberger | STAGE 1
40 SHOTS |
2012-12-15 | H2O | 15 | 5401 Bbl | 395026 | Schlumberger | STAGE 5
40 SHOTS |
2012-12-17 | H2O | 15 | 5553 Bbl | 387791 | Schlumberger | STAGE 12
40 SHOTS |
2012-12-14 | H2O | 15 | 5728 Bbl | 381404 | Schlumberger | STAGE 3
40 SHOTS |
2012-12-18 | H2O | 15 | 5829 Bbl | 382480 | Schlumberger | STAGE 13
40 SHOTS |
2012-12-15 | H2O | 15 | 5861 Bbl | 38770 | Schlumberger | STAGE 4
40 SHOTS |
2012-12-18 | H2O | 15 | 5899 Bbl | 385100 | Schlumberger | STAGE 14
40 SHOTS |
2012-12-18 | H2O | 15 | 5426 Bbl | 384800 | Schlumberger | STAGE 16
40 SHOTS |
2012-12-17 | H2O | 15 | 5771 Bbl | 389440 | Schlumberger | STAGE 10
40 SHOTS |
2012-12-16 | H2O | 0 | 5692 Bbl | 380240 | Schlumberger | STAGE 8
40 SHOTS |
2012-12-14 | H2O | 15 | 5827 Bbl | 382260 | Schlumberger | STAGE 2
40 SHOTS |
2012-12-18 | H2O | 15 | 5559 Bbl | 387481 | Schlumberger | STAGE 15
40 SHOTS |
2012-12-16 | H2O | 15 | 5798 Bbl | 385340 | Schlumberger | STAGE 7
40 SHOTS |
2012-12-16 | H2O | 15 | 5692 Bbl | 380240 | Schlumberger | STAGE 9
40 SHOTS |
2012-12-15 | H2O | 15 | 5612 Bbl | 382820 | Schlumberger | STAGE 6
40 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | 255755 | 40180 | 231 |
2014 | CHESAPEAKE EXPLORATION LLC | 170893 | 22307 | 338 |
2015 | CHESAPEAKE EXPLORATION LLC | 129761 | 16086 | 359 |
2016 | CHESAPEAKE EXPLORATION LLC | 104569 | 12113 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 90676 | 9017 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 74492 | 7777 | 363 |
2019 | CHESAPEAKE EXPLORATION LLC | 19111 | 1836 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 8532 | 231 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 1407 | 338 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 1343 | 359 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 230 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 194 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 369 | 363 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 145 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-106229055 | 2019-9-26 0:00: | PW | No Violations | 2.00 |
-1115193243 | 2019-8-28 0:00: | PW | No Violations | 1.00 |
-583625702 | 2015-9-28 0:00: | PL | No Violations | |
-858364154 | 2017-12-12 0:00 | PW | No Violations | 0.80 |
-880772930 | 2019-8-19 0:00: | PW | No Violations | 1.00 |
0073353344 | 2015-01-20 | Production Wells | No Violations | I was on location to conduct a status check of this well. The well is of plunger lift construction. Jersey barriers were installed around the wellhead. The tank battery consisted of 8, 400 BBL production tanks and was diked. A windsock was installed on the top of the production tanks. Other production equipment on the well pad consisted of:
|
0583625702 | 2015-09-28 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is equipped with a plunger lift unit. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly marked well identification sign. The tank battery consisted of eight 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock is installed on top of the production tanks. Other production equipment on the well pad consisted of:
|
0858364154 | 2017-12-12 | Production Wells | No Violations | I was on location to conduct a status check of this well. The pad is equipped with four producing wells, and this well was equipped with a plunger lift assembly. Proper identification was posted at the access road entrance, the pad entrance, the wells, and tank battery. The tank battery was surrounded by a steel dike. Other production equipment on the well pad consisted of:
The lease road was in good repair. No violations were observed at the time of inspection. |
495546316 | 2019-9-4 0:00:0 | PW | No Violations | 2.00 |
613834323 | 2019-9-26 0:00: | PW | No Violations | 1.00 |
73353344 | 2015-1-20 0:00: | PW | No Violations |
For data sources see[10]