X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22172

Well Details

Well ID: 34-019-22172
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Union Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000348
Farm/Lease Name: RUTLEDGE 10-14-6
License Status: Producing
License Date: 2012-09-18
Spud Date: 2012-10-19
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2012-11-04
Well Total Depth: 13582.00 ft
Configuration: Horizontal
Latitude: 40.520000
Longitude: -81.120000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-06-21 Proposed Formations:POINT PLEASANT, Issued Date:6/21/2012, Expired Date:6/21/2014 12:00:00 PM, Drilling unit acres:153.24, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2012-09-18 Proposed Formations:POINT PLEASANT, Issued Date:9/18/2012, Expired Date:9/18/2014 12:00:00 PM, Drilling unit acres:153.24, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2012-09-21 CORRECTION TO WELL NUMBER.
Correction to Well 2012-09-28 CORRECTION TO FOOTAGE, SURFACE & TARGET.
APP 2012-10-03 Proposed Formations:POINT PLEASANT, Issued Date:10/3/2012, Expired Date:10/3/2014 12:00:00 PM, Drilling unit acres:153.24, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2012-10-16 Proposed Formations:POINT PLEASANT, Issued Date:10/16/2012, Expired Date:10/16/2014 12:00:00 PM, Drilling unit acres:153.24, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2012-11-04
Correction to Well 2013-04-26 UINT SIZE DECREASED TO 134.20 ACRES. CORRECTION TO SURFACE FOOTAGE AND TARGET INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2013-06-19
Construction Permit Expires 2014-09-18
Record Last Modified 2019-04-08

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-06-21 8508 13462 640
8508 13462 640
8508 13462 640

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 12/13/2012 12/13/2012 7579.00 4,182,906.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1
Acid, Hydrochloric 15pct, A264,

B244, B317, J475, J580, J609, J610, L058, L071, Northern White Sand, 100 Mesh Sand

Schlumberger Acid, Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, KCl Substitute, Scale Inhibitor, Proppant - Natural Guar gum 9000-30-0 0.42 0.08
Glutaraldehyde 111-30-8 0.03 0.00690000
Peroxydisulfuric acid, diammonium salt 7727-54-0 0.00686000 0.00135000
Fatty acids, tall-oil 61790-12-3 0.00268000 0.00053000
Sodium sulfate 7757-82-6 0.02 0.00403000
Boric acid, dipotassium salt 1332-77-0 0.07 0.01
Trisodium phosphate 7601-54-9 0.00408000 0.00080000
Glycerin, natural 56-81-5 0.02 0.00469000
Urea 57-13-6 0.00330000 0.00065000
Ammonium sulfate 7783-20-2 0.04 0.00933000
Methanol 67-56-1 0.00365000 0.00072000
Potassium hydroxide 1310-58-3 0.02 0.00469000
Sodium erythorbate 6381-77-7 0.00367000 0.00072000
Acrylamide-sodium-2-acrylamido-2-methlypropane

sulfonate copolymer

38193-60-1 0.05 0.00988000
Quartz 14808-60-7 97.88 19.27
Hydrochloric acid 7647-01-0 1.00 0.19
Choline chloride 67-48-1 0.42 0.08
2-Propenoic acid, 2-methyl-, polymer

with sodium 2-methyl-2-((1-oxo-2- propen-1-yl)amino)-1-propanesulfonate (1:1)

136793-29-8 0.00537000 0.00106000
Fresh Water Carrier/Base Fluid Water 7732-18-5 100.00 83.90

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-12-17 H2O 15 5679 Bbl 385980 Schlumberger STAGE 11

40 SHOTS

2012-12-13 H2O 15 10419 Bbl 387100 Schlumberger STAGE 1

40 SHOTS

2012-12-15 H2O 15 5401 Bbl 395026 Schlumberger STAGE 5
40 SHOTS
2012-12-17 H2O 15 5553 Bbl 387791 Schlumberger STAGE 12

40 SHOTS

2012-12-14 H2O 15 5728 Bbl 381404 Schlumberger STAGE 3

40 SHOTS

2012-12-18 H2O 15 5829 Bbl 382480 Schlumberger STAGE 13

40 SHOTS

2012-12-15 H2O 15 5861 Bbl 38770 Schlumberger STAGE 4

40 SHOTS

2012-12-18 H2O 15 5899 Bbl 385100 Schlumberger STAGE 14

40 SHOTS

2012-12-18 H2O 15 5426 Bbl 384800 Schlumberger STAGE 16

40 SHOTS

2012-12-17 H2O 15 5771 Bbl 389440 Schlumberger STAGE 10

40 SHOTS

2012-12-16 H2O 0 5692 Bbl 380240 Schlumberger STAGE 8

40 SHOTS

2012-12-14 H2O 15 5827 Bbl 382260 Schlumberger STAGE 2

40 SHOTS

2012-12-18 H2O 15 5559 Bbl 387481 Schlumberger STAGE 15

40 SHOTS

2012-12-16 H2O 15 5798 Bbl 385340 Schlumberger STAGE 7

40 SHOTS

2012-12-16 H2O 15 5692 Bbl 380240 Schlumberger STAGE 9

40 SHOTS

2012-12-15 H2O 15 5612 Bbl 382820 Schlumberger STAGE 6

40 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC 255755 40180 231
2014 CHESAPEAKE EXPLORATION LLC 170893 22307 338
2015 CHESAPEAKE EXPLORATION LLC 129761 16086 359
2016 CHESAPEAKE EXPLORATION LLC 104569 12113 366
2017 CHESAPEAKE EXPLORATION LLC 90676 9017 365
2018 CHESAPEAKE EXPLORATION LLC 74492 7777 363
2019 CHESAPEAKE EXPLORATION LLC 19111 1836 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC Brine 8532 231
2014 CHESAPEAKE EXPLORATION LLC Brine 1407 338
2015 CHESAPEAKE EXPLORATION LLC Brine 1343 359
2016 CHESAPEAKE EXPLORATION LLC Brine 230 366
2017 CHESAPEAKE EXPLORATION LLC Brine 194 365
2018 CHESAPEAKE EXPLORATION LLC Brine 369 363
2019 CHESAPEAKE EXPLORATION LLC Brine 145 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-106229055 2019-9-26 0:00: PW No Violations 2.00
-1115193243 2019-8-28 0:00: PW No Violations 1.00
-583625702 2015-9-28 0:00: PL No Violations
-858364154 2017-12-12 0:00 PW No Violations 0.80
-880772930 2019-8-19 0:00: PW No Violations 1.00
0073353344 2015-01-20 Production Wells No Violations I was on location to conduct a status check of this well. The well is of plunger lift construction. Jersey barriers were installed around the wellhead. The tank battery consisted of 8, 400 BBL production tanks and was diked. A windsock was installed on the top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. Lightening protection is installed on top of the production tanks. The well is properly identified with a clear, legibly marked well identification sign. The entire well pad is enclosed with a 6 foot high, chain link fence with 3 strand barbed wire and the man doors were locked. The lease road is stable and drivable. No violations found.

0583625702 2015-09-28 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is equipped with a plunger lift unit. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly marked well identification sign. The tank battery consisted of eight 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock is installed on top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a 6 foot high, chain link fence with 3 strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

0858364154 2017-12-12 Production Wells No Violations I was on location to conduct a status check of this well. The pad is equipped with four producing wells, and this well was equipped with a plunger lift assembly. Proper identification was posted at the access road entrance, the pad entrance, the wells, and tank battery. The tank battery was surrounded by a steel dike. Other production equipment on the well pad consisted of:



The lease road was in good repair. No violations were observed at the time of inspection.

495546316 2019-9-4 0:00:0 PW No Violations 2.00
613834323 2019-9-26 0:00: PW No Violations 1.00
73353344 2015-1-20 0:00: PW No Violations

For data sources see[10]

References