X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22179

Well Details

Well ID: 34-019-22179
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Loudon Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000323
Farm/Lease Name: COLESCOTT 11-12-5
License Status: Producing
License Date: 2012-07-05
Spud Date: 2012-07-17
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2013-03-26
Well Total Depth: 14029.00 ft
Configuration: Horizontal
Latitude: 40.450000
Longitude: -81.010000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-07-05 Proposed Formations:POINT PLEASANT, Issued Date:7/5/2012, Expired Date:7/5/2014 12:00:00 PM, Drilling unit acres:153.2, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-03-26
Correction to Well 2013-09-13 CHANGE IN TARGET INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 143.29 ACRES.
Completion Report Received 2014-01-30
Construction Permit Expires 2014-07-05
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-01-31 8511 13861 700
8511 13861 700
8511 13861 700

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/01/2013 07/04/2013 8179 5,471,510.0 380777

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FRW-200 FTS INTERNATIONAL Friction Reducer Petroleum Distillate Hydrotreated Light 064742-47-8 26 0.01277 0
LTB-01 FTS INTERNATIONAL Breaker Proprietary Cured Acrylic Resin TRADE SECRET 25 0.02147 0
Ammonium Persulfate 007727-54-0 100 0.08588 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 25 0.02147 0
Northern White Sand FTS INTERNATIONAL Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 9.81864 0
APB01 (AMMONIUM PERSUFATE BREAKER) FTS INTERNATIONAL Breaker Ammonium Persulfate 007727-54-0 100 0.001 0
B10 (HIGH PH BUFFER) FTS INTERNATIONAL pH Adjusting Agent Potassium Hydroxide 001310-58-3 20 0.00248 0
Potassium Carbonate 000584-08-7 48 0.00595 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 15.6302 0
BXL02 Borate XL FTS INTERNATIONAL Cross Linker Boric Acid 010043-35-3 15 0.00439 0
Sodium Metaborate Tetrahydrate 010555-76-7 25 0.00732 0
Potassium Hydroxide 001310-58-3 12 0.00352 0
CI-150 FTS INTERNATIONAL Corrosion Inhibitor Dimethyl Formamide 000068-12-2 10 0.00018 0
Proprietary Aromatic Aldehyde TRADE SECRET 10 0.00018 0
Proprietary Organic Amine Resin Salt TRADE SECRET 30 0.00055 0
Isopropanol (Isopropyl Alcohol, Propan-2-ol) 000067-63-0 60 0.00109 0
Proprietary Quaternary Ammonium Compound TRADE SECRET 10 0.00018 0
APB01 (AMMONIUM PERSUFATE BREAKER),

B10 (HIGH PH BUFFER), BXL02 Borate XL, CI-150, FE 200, FRW-200, KCLS-4, LTB-01

FTS INTERNATIONAL Breaker, Clay Stabilizer, Corrosion Inhibitor, Cross Linker, Friction Reducer, Iron Control Agent, pH Adjusting Agent Proprietary Iron Control Additive (FE-200L) TRADE SECRET 0 0.00449 0
Proprietary Breaker Additive (LTB-1) TRADE SECRET 0 0.02447 0
Proprietary Clay Stabilizer Additive (KCLS-4) TRADE SECRET 0 0.09795 0
Proprietary Breaker (APB01) Additive TRADE SECRET 0 0.00006000 0
Proprietary Corrosion Inhibitor Additive (CI-150) TRADE SECRET 0 0.00093 0
Water 007732-18-5 0 0.13951 0
Proprietary Friction Reducer Additive

(FRW-200 and FRW-200W)

TRADE SECRET 0 0.04614 0
FE 200 FTS INTERNATIONAL Iron Control Agent Trisodium Nitrilotriacetate 005064-31-3 2 0.00013 0
Sodium Hydroxide 001310-73-2 2 0.00012 0
Tetrasodium Ethylenediaminetetraacetate 000064-02-8 41 0.00262 0
100 Mesh Sand FTS INTERNATIONAL Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 2.44173 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 70.6863 0
KCLS-4 FTS INTERNATIONAL Clay Stabilizer No Hazardous Components NONE 0 0 0
HVG01 (TURQUOISE-1 BULK) FTS INTERNATIONAL Gelling Agent Surfactant 068439-51-0 2 0.00161 0
Guar Gum 009000-30-0 50 0.04015 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 2 0.00161 0
Petroleum Distillate Hydrotreated Light 064742-47-8 55 0.04417 0
NaturaLine MX 588-2 MULTI-CHEM Scale Inhibitor No Hazardous Components NONE 0 0 0
MC B-8642 (WS), NaturaLine MX 588-2 MULTI-CHEM Anti-Bacterial Agent, Scale Inhibitor Methanol (Methyl Alcohol) 000067-56-1 0 0.00012 0
Water 007732-18-5 0 0.01745 0
Proprietary Neutralized Polymer TRADE SECRET 0 0.00112 0
Proprietary Solvent (NaturaLine MX 588-2) TRADE SECRET 0 0.00562 0
MC B-8642 (WS) MULTI-CHEM Anti-Bacterial Agent Ethanol 000064-17-5 1 0.00022 0
Glutaraldehyde (Pentanediol) 000111-30-8 60 0.01304 0
Quaternary Ammonium Compound 068424-85-1 10 0.00217 0
10.1 - 15 HCL FTS INTERNATIONAL Acid Hydrochloric Acid 007647-01-0 15 0.1559 0
Water 007732-18-5 85 0.88343 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 0
2013-07-03 H2O 15 5029 Bbl 332535 Frac Tech Services STAGE 9

35 SHOTS

2013-07-01 H2O 15 5716 Bbl 330268 Frac Tech Services STAGE 2

35 SHOTS

2013-07-03 H2O 15 5384 Bbl 328042 Frac Tech Services STAGE 13

35 SHOTS

2013-07-02 H2O 15 5277 Bbl 330363 Frac Tech Services STAGE 5

35 SHOTS

2013-07-01 H2O 15 5028 Bbl 331669 Frac Tech Services STAGE 1

35 SHOTS

2013-07-04 H2O 15 4998 Bbl 329151 Frac Tech Services STAGE 20

35 SHOTS

2013-07-03 H2O 15 5443 Bbl 326345 Frac Tech Services STAGE 14

35 SHOTS

0 0 0
2013-07-03 H2O 15 5474 Bbl 343132 Frac Tech Services STAGE 10

35 SHOTS

2013-07-04 H2O 15 4988 Bbl 330471 Frac Tech Services STAGE 16

35 SHOTS

2013-07-04 H2O 15 5553 Bbl 328210 Frac Tech Services STAGE 18

35 SHOTS

2013-07-03 H2O 15 5347 Bbl 329881 Frac Tech Services STAGE 12

35 SHOTS

2013-07-04 H2O 15 5315 Bbl 331407 Frac Tech Services STAGE 15

35 SHOTS

2013-07-03 H2O 15 5109 Bbl 328209 Frac Tech Services STAGE 11

35 SHOTS

2013-07-04 H2O 15 5065 Bbl 327769 Frac Tech Services STAGE 19

35 SHOTS

2013-07-04 H2O 15 4955 Bbl 331923 Performance Technologies STAGE 17

35 SHOTS

0 0 0
2013-07-02 H2O 15 5359 Bbl 319549 Frac Tech Services STAGE 8

35 SHOTS

0 0 0
2013-07-02 H2O 15 4873 Bbl 330363 Frac Tech Services STAGE 6

35 SHOTS

0 0 0
2013-07-01 H2O 15 5430 Bbl 330268 Frac Tech Services STAGE 3

35 SHOTS

0 0 0
0 0 0
2013-07-02 H2O 15 5340 Bbl 330708 Frac Tech Services STAGE 4

35 SHOTS

2013-07-02 H2O 15 5636 Bbl 325319 Frac Tech Services STAGE 7

35 SHOTS

0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC 236947 7230 99
2014 CHESAPEAKE EXPLORATION LLC 1092802 14388 353
2015 CHESAPEAKE EXPLORATION LLC 598799 2615 355
2016 CHESAPEAKE EXPLORATION LLC 392218 1302 366
2017 CHESAPEAKE EXPLORATION LLC 302991 993 364
2018 CHESAPEAKE EXPLORATION LLC 246104 673 365
2019 CHESAPEAKE EXPLORATION LLC 54812 242 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC Brine 5207 99
2014 CHESAPEAKE EXPLORATION LLC Brine 7207 353
2015 CHESAPEAKE EXPLORATION LLC Brine 3405 355
2016 CHESAPEAKE EXPLORATION LLC Brine 2184 366
2017 CHESAPEAKE EXPLORATION LLC Brine 1679 364
2018 CHESAPEAKE EXPLORATION LLC Brine 1123 365
2019 CHESAPEAKE EXPLORATION LLC Brine 289 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1955507787 2012-7-19 0:00: DD No Violations 2.00
-635345019 2015-11-9 0:00: PL No Violations
-843858917 2012-7-17 0:00: DD No Violations 1.00
0635345019 2015-11-09 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of eight, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

0843858917 2012-07-17 Drill / Deepen / Reopen No Violations I was on site to check the status of Express Energy Services rathole rig that is drilling the conductor hole . My inspection revealed that the tin horn (cellar) has been set and the rathole rig is drilling the 26 conductor hole . The driller advised that they were going to try to finish drilling this conductor hole today and move the rig over to the Colescott 10H and start drilling it tomorrow morning .
1955507787 2012-07-19 Drill / Deepen / Reopen No Violations I was on site to witness the cementing of the 20 conductor pipe . My inspection revealed that Express Energy Services has drilled a 26 hole to a depth of 110 and ran 110 of 20 conductor pipe into the wellbore . Allied Oil & Gas Services cemented the casing with 252 sacks of Class A cement with 2% CaCl and .25 pound per sack floseal ( 15.6 pound per gallon density and a yield of 1.2 cubic feet per sack) . The wellbore had good circulation throughout the entire job and approximately 15 barrels of cement was circulated to surface .
2040373924 2016-02-18 Production Wells No Violations I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road gate was not locked. The access road was in good repair. The #3H well is in production. The well is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence. The man doors were not locked, but Chesapeake Exploration personnel were on site at the time of inspection.

The equipment on the pad consists of the following: 8-400 bbl production tanks with one low pressure vertical separator 6 Producing wells 6 Sand separators 6 Gas Processing Units 1 Heat Treater 1 Vapor Recovery Unit

For data sources see[10]

References