If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22181 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.48,"lon":-80.96,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Loudon Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000328 | |
Farm/Lease Name: ELWOOD SOUTH 32-12-4 | |
License Status: Producing | |
License Date: 2012-07-24 | |
Spud Date: 2012-08-01 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2012-08-18 | |
Well Total Depth: 13859.00 ft | |
Configuration: Horizontal | |
Latitude: 40.480000 | |
Longitude: -80.960000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-07-12 | Proposed Formations:, Issued Date:7/12/2012, Expired Date:7/12/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OTH, Proposed Well Class:O |
Correction to Well | 2012-07-19 | CORRECTION TO WELL TYPE & WELL CLASS (CONDUCTOR WELL). |
APP | 2012-07-24 | 8756 CHESAPEAKE EXPLORATION LLC Proposed Formation POINT PLEASANT Issued Date 7/24/2012 Expired Date 7/24/2014 12:00:00 PM |
APP | 2012-08-08 | Proposed Formations:POINT PLEASANT, Issued Date:8/8/2012, Expired Date:8/8/2014 12:00:00 PM, Drilling unit acres:152.64, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2012-08-18 | |
Correction to Well | 2013-03-15 | CHANGE IN TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DIRLLED SURVEY PLAT. UNIT SIZE INCREASED TO 429.07 ACRES. |
Completion Report Received | 2013-08-22 | |
Construction Permit Expires | 2014-07-24 | |
Record Last Modified | 2017-02-10 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-09-25 | 8592 | 13742 | 400 |
8592 | 13742 | 400 | |
8592 | 13742 | 400 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 12/15/2012 | 12/15/2012 | 8311.00 | 5,739,720.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | NE-900 | Baker Hughes | Non-Emulsifier | Phenol Ethoxylate) | ||||
Methanol | 67-56-1 | 30.00 | 0.00966000 | |||||
Nonyl phenol ethoxylate | 9016-45-9 | 10.00 | 0.00322000 | |||||
FRW-18 | Baker Hughes | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
Hydrochloric Acid 10.1-15 | Baker Hughes | Acid | Hydrochloric acid | 7647-01-0 | 15.00 | 0.07 | ||
Water | 7732-18-5 | 85.00 | 0.40 | |||||
GBW-5 | Baker Hughes | Breaker | Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 100.00 | 0.00055000 | ||
BF-9L | Baker Hughes | pH Adjusting Agent | Potassium hydroxide | 1310-58-3 | 15.00 | 0.00267000 | ||
ALPHA 1427 | Baker Hughes | Antibacterial Agent | Didecyl dimethyl ammonium chloride | 7173-51-5 | 10.00 | 0.00142000 | ||
Water | 7732-18-5 | 60.00 | 0.00853000 | |||||
Glutaraldehyde | 111-30-8 | 30.00 | 0.00427000 | |||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 7.00 | 0.00100000 | |||||
Ethanol | 64-17-5 | 5.00 | 0.00071000 | |||||
BF-9L, CI-14, ENZYME G-NE, FERROTROL
300L, FRW-18, GW-3LDF, NE-900, SCALETROL 720 |
Baker Hughes | Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Iron Control Agent, Non-Emulsifier, pH Adjusting Agent, Scale Inhibitor | Proprietary Silica | |||||
Proprietary Weak Acid | ||||||||
Hemicellulase Enzyme Concentrate | 9025-56-3 | |||||||
Proprietary Biocide | ||||||||
Water | 7732-18-5 | |||||||
Proprietary Alcohol | ||||||||
Proprietary Acid | ||||||||
Proprietary Undisclosed by Supplier | ||||||||
Proprietary Polymer | ||||||||
Calcium chloride | 10043-52-4 | |||||||
Proprietary Solvent | ||||||||
Proprietary Disinfectant | ||||||||
Proprietary Surfactant | ||||||||
Proprietary Copolymer | ||||||||
Recycled Produced Water | Carrier/Base Fluid | 4.68 | ||||||
XLW-32 | Baker Hughes | Crosslinker | Boric acid | 10043-35-3 | 20.00 | 0.00203000 | ||
Methanol | 67-56-1 | 90.00 | 0.00912000 | |||||
Fresh Water | Carrier/Base Fluid | 79.22 | ||||||
SCALETROL 720 | Baker Hughes | Scale Inhibitor | Ethylene glycol | 107-21-1 | 35.00 | 0.00513000 | ||
Diethylene glycol | 111-46-6 | 5.00 | 0.00073000 | |||||
100 Mesh Sand | Baker Hughes | Proppant - Natural | Quartz | 14808-60-7 | 100.00 | 2.98 | ||
Additional Ingredients Not Listed on MSDS | ||||||||
Northern White Sand | Baker Hughes | Proppant - Natural | Quartz | 14808-60-7 | 100.00 | 12.25 | ||
ClayCare | Baker Hughes | KCl Substitute | Water | 7732-18-5 | 30.00 | 0.00622000 | ||
Choline chloride | 67-48-1 | 75.00 | 0.01 | |||||
ENZYME G-NE | Baker Hughes | Breaker | No Hazardous Components | 0.00 | ||||
CI-14 | Baker Hughes | Corrosion Inhibitor | Propargyl alcohol | 107-19-7 | 5.00 | 0.00004000 | ||
Methanol | 67-56-1 | 68.00 | 0.00052000 | |||||
GW-3LDF | Baker Hughes | Gelling Agent | Petroleum Distillate Blend | 60.00 | 0.11 | |||
Polysaccharide Blend | 60.00 | 0.11 | ||||||
FERROTROL 300L | Baker Hughes | Iron Control Agent | Citric acid | 77-92-9 | 50.00 | 0.00131000 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-12-18 | H2O | 15 | 11836 Bbl | 871377 | BAKER-HUGHES | STAGE 8
40 SHOTS |
2012-12-17 | H2O | 15 | 12728 Bbl | 876404 | BAKER-HUGHES | STAGE 5
40 SHOTS |
2012-12-16 | H2O | 15 | 12892 Bbl | 882300 | BAKER-HUGHES | STAGE 3
40 SHOTS |
2012-12-17 | H2O | 15 | 11519 Bbl | 875761 | BAKER-HUGHES | STAGE 4
40 SHOTS |
2012-12-15 | H2O | 15 | 15953 Bbl | 871540 | BAKER-HUGHES | STAGE 2
40 SHOTS |
2012-12-18 | H2O | 15 | 12396 Bbl | 880207 | BAKER-HUGHES | STAGE 9
40 SHOTS |
2012-12-17 | H2O | 15 | 12844 Bbl | 876998 | BAKER-HUGHES | STAGE 6
40 SHOTS |
2012-12-15 | H2O | 15 | 12503 Bbl | 863991 | BAKER-HUGHES | STAGE 1
40 SHOTS |
2012-12-19 | H2O | 15 | 12345 Bbl | 875761 | BAKER-HUGHES | STAGE 10
40 SHOTS |
2012-12-18 | H2O | 15 | 12763 Bbl | 870571 | BAKER-HUGHES | STAGE 7
40 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | 654864 | 2557 | 195 |
2014 | CHESAPEAKE EXPLORATION LLC | 1026710 | 587 | 360 |
2015 | CHESAPEAKE EXPLORATION LLC | 633890 | 4 | 273 |
2016 | CHESAPEAKE EXPLORATION LLC | 520255 | 0 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 363498 | 0 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 289758 | 0 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 63683 | 4 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 9425 | 195 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 7831 | 360 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 4515 | 273 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 4910 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 4311 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 2614 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 796 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1164549501 | 2017-5-15 0:00: | PL | No Violations | 1.00 |
-382753219 | 2012-8-14 0:00: | DD | No Violations | 1.00 |
0382753219 | 2012-08-14 | Drill / Deepen / Reopen | No Violations | I was on site to check the status of Nomac Drilling Rig # 41. My inspection revealed that Nomac Rig # 41 is drilling the curve at 8280 and should land the curve later today. They advised that if they land the curve later today or tonight, they should finish drilling the well by this coming weekend. My inspection revealed no violations at this time. |
1164549501 | 2017-05-15 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The #8H well is in production of an open flow assembly. Jersey barriers were installed around the wellhead. The well is identified with a legibly-marked well identification sign. Identification was posted at the tank battery which consisted of eight 400 bbl production tanks, three labeled as containing produced water, and four labelled as containing condensate, and one low-pressure vertical separator. The tank battery is surrounded by a dike. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Production equipment on the well pad consisted of:
6-producing wells 6- 400 bbl production tanks, three labelled as containing produced water, and three labelled as containing condensate 6 sand separators 6 gas processing units 1 low pressure vertical separator 1 vapor recovery unit 1 compressor station 1 line heater 2 bullet tanks Jersey barriers are installed around the production equipment. The access road and man doors were locked. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road was stable in in good repair. |
2004664322 | 2012-08-02 | Drill / Deepen / Reopen | No Violations | I was on site to witness the cementing of the 13 3/8 surface casing. My inspection revealed that Nomac Rig #41 has ran 573 of 13 3/8 surface casing. They installed 6 centralizers on the casing string (on joints 1,2,3,6,9,10). Halliburton cemented the casing with 540 sacks of ClassA cement with a density of 15.6 pound per gallon and a yield of 1.19 cubic feet per sack. The cement additives are 1% CaCl and .25 pound per sack poly-e-flake. Halliburton pumped 81.9 barrels of freshwater to displace and land the plug. There was good circulation throughout the job and approximately 30 barrels of cement was circulated to surface. |
For data sources see[10]