If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22200 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.44,"lon":-81.06,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Perry Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000329 | |
Farm/Lease Name: FLIGIEL 29-12-5 | |
License Status: Producing | |
License Date: 2012-10-23 | |
Spud Date: 2012-12-24 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2013-01-05 | |
Well Total Depth: 13888.00 ft | |
Configuration: Horizontal | |
Latitude: 40.440000 | |
Longitude: -81.060000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-08-02 | Proposed Formations:, Issued Date:8/2/2012, Expired Date:8/2/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:COND, Proposed Well Class: |
APP | 2012-08-03 | Proposed Formations:POINT PLEASANT, Issued Date:8/3/2012, Expired Date:8/3/2014 12:00:00 PM, Drilling unit acres:153.36, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2012-10-23 | Proposed Formations:POINT PLEASANT, Issued Date:10/23/2012, Expired Date:10/23/2014 12:00:00 PM, Drilling unit acres:122.32, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-01-05 | |
Correction to Well | 2013-08-09 | CORRECTION TO TARGET INFORMATION (FOOTAGE & X, Y COORDINATES) AND CORRECTION TO SURFACE INFORMATION (FOOTAGE) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 112.88 ACRES. |
Completion Report Received | 2013-12-06 | |
Construction Permit Expires | 2014-10-23 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-12-10 | 9538 | 13670 | 600 |
9538 | 13670 | 600 | |
9538 | 13670 | 600 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/19/2013 | 04/21/2013 | 8026 | 4,183,830.0 | 284911 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 85.3965 | 0 |
Acid, Hydrochloric 15pct, A264,
B244, B317, D047, J218, J475, J580, J609, J610, L058, 100 Mesh Sand, Northern White Sand |
SCHLUMBERGER | Acid, Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Defoaming Agent, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Proppant - Natural | Sodium hydroxide | 1310-73-2 | 0 | 0.00001000 | 0 | |
Dimethyl siloxanes and silicones | 63148-62-9 | 0 | 0.00001000 | 0 | ||||
Hydrogen chloride | 7647-01-0 | 1.24 | 0.16111 | 0 | ||||
Potassium hydroxide | 1310-58-3 | 0.02 | 0.00284 | 0 | ||||
Methanol | 67-56-1 | 0 | 0.0005 | 0 | ||||
Polymer of 2-acrylamido-2-methylpropanesulfonic
acid sodium salt and methyl acrylate |
136793-29-8 | 0.01 | 0.00107 | 0 | ||||
Prop-2-yn-1-ol | 107-19-7 | 0 | 0.00009000 | 0 | ||||
Ammonium sulfate | 7783-20-2 | 0.07 | 0.00948 | 0 | ||||
Dodecamethylcyclohexasiloxane | 540-97-6 | 0 | 0.00001000 | 0 | ||||
Glycerol | 56-81-5 | 0.02 | 0.00284 | 0 | ||||
Potassium borate | 1332-77-0 | 0.07 | 0.00872 | 0 | ||||
Glutaraldehyde | 111-30-8 | 0.04 | 0.00558 | 0 | ||||
Decamethyl cyclopentasiloxane | 541-02-6 | 0 | 0.00001000 | 0 | ||||
Alcohols, C14-15, ethoxylated (7EO) | 68951-67-7 | 0 | 0.00014 | 0 | ||||
Polypropylene glycol | 25322-69-4 | 0 | 0.00053 | 0 | ||||
Guar gum | 9000-30-0 | 0.53 | 0.06924 | 0 | ||||
Crystalline silica | 14808-60-7 | 97.85 | 12.763 | 0 | ||||
Water | 007732-18-5 | 4.72 | 0.6461 | 0 | ||||
Magnesium silicate hydrate (talc) | 14807-96-6 | 0 | 0.00002000 | 0 | ||||
Non-crystalline silica | 7631-86-9 | 0 | 0.00028 | 0 | ||||
Siloxanes and Silicones, di-Me,
reaction products with silica |
67762-90-7 | 0 | 0.00001000 | 0 | ||||
Sodium erythorbate | 6381-77-7 | 0.01 | 0.00073 | 0 | ||||
Trisodium ortho phosphate | 7601-54-9 | 0.01 | 0.00073 | 0 | ||||
Urea | 57-13-6 | 0.01 | 0.00066 | 0 | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 0 | 0.00001000 | 0 | ||||
Ethane-1,2-diol | 107-21-1 | 0 | 0.00021 | 0 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0 | 0.00037 | 0 | ||||
Thiourea, polymer with formaldehyde and 1-phenylethanone | 68527-49-1 | 0 | 0.0003 | 0 | ||||
Tetrasodium ethylenediaminetetraacetate | 64-02-8 | 0 | 0.00002000 | 0 | ||||
Acrylamide, 2-acrylamido-2-methylpropanesulfonic
acid, sodium salt polymer |
38193-60-1 | 0.08 | 0.01003 | 0 | ||||
Alkenes, C>10 a- | 64743-02-8 | 0 | 0.00006000 | 0 | ||||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 0 | 0.00035 | 0 | ||||
Diammonium peroxidisulphate | 7727-54-0 | 0.02 | 0.00205 | 0 | ||||
Sodium sulfate | 7757-82-6 | 0.03 | 0.0041 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 0.91401 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-04-21 | H2O | 15 | 660000 Bbl | 338860 | Schlumberger | STAGE 12, 40 SHOTS |
2013-04-19 | H2O | 15 | 685900 Bbl | 337940 | Schlumberger | STAGE 1, 40 SHOTS |
2013-04-21 | H2O | 15 | 609200 Bbl | 337320 | Schlumberger | STAGE 14, 40 SHOTS |
2013-04-20 | H2O | 15 | 621500 Bbl | 336981 | Schlumberger | STAGE 9, 40 SHOTS |
2013-04-20 | H2O | 15 | 628600 Bbl | 334180 | Schlumberger | STAGE 7, 40 SHOTS |
2013-04-21 | H2O | 15 | 630700 Bbl | 339920 | Schlumberger | STAGE 15, 40 SHOTS |
2013-04-19 | H2O | 15 | 637600 Bbl | 334501 | Schlumberger | STAGE 2, 40 SHOTS |
2013-04-19 | H2O | 15 | 642000 Bbl | 336240 | Schlumberger | STAGE 3, 40 SHOTS |
2013-04-21 | H2O | 15 | 662100 Bbl | 335700 | Schlumberger | STAGE 13, 40 SHOTS |
2013-04-20 | H2O | 15 | 6420 Bbl | 332340 | Schlumberger | STAGE 5, 40 SHOTS |
2013-04-20 | H2O | 15 | 6439 Bbl | 333721 | Schlumberger | STAGE 4, 40 SHOTS |
2013-04-20 | H2O | 15 | 673700 Bbl | 336000 | Schlumberger | STAGE 6, 40 SHOTS |
2013-04-20 | H2O | 15 | 635000 Bbl | 337000 | Schlumberger | STAGE 8, 40 SHOTS |
2013-04-20 | H2O | 15 | 636800 Bbl | 335801 | Schlumberger | STAGE 10, 40 SHOTS |
2013-04-21 | H2O | 15 | 587600 Bbl | 335858 | Schlumberger | STAGE 11, 40 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | 188249 | 12216 | 98 |
2014 | CHESAPEAKE EXPLORATION LLC | 220782 | 11895 | 284 |
2015 | CHESAPEAKE EXPLORATION LLC | 187965 | 9651 | 358 |
2016 | CHESAPEAKE EXPLORATION LLC | 148342 | 6021 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 119699 | 3504 | 348 |
2018 | CHESAPEAKE EXPLORATION LLC | 105367 | 2913 | 360 |
2019 | CHESAPEAKE EXPLORATION LLC | 24152 | 751 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 6590 | 98 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 2983 | 284 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 1344 | 358 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 1027 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 1202 | 348 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1201 | 360 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 279 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-176464722 | 2015-12-23 0:00 | PL | No Violations | |
0176464722 | 2015-12-23 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is equipped with a plunger lift unit. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of eight, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:
Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed. |
For data sources see[10]