X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22220

Well Details

Well ID: 34-019-22220
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Augusta Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000332
Farm/Lease Name: HAWK 2-15-5
License Status: Producing
License Date: 2012-08-30
Spud Date: 2013-01-26
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2013-02-11
Well Total Depth: 13215.00 ft
Configuration: Horizontal
Latitude: 40.710000
Longitude: -81.000000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-08-30 Proposed Formations:POINT PLEASANT, Issued Date:8/30/2012, Expired Date:8/30/2014 12:00:00 PM, Drilling unit acres:153.4, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-02-11
Correction to Well 2013-04-05 CORRECTION TO TARGET INFORMATION: FOOTAGE AND X,Y COORDINATES FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 139.30 ACRES.
Completion Report Received 2013-06-19
Construction Permit Expires 2014-08-30
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-06-21 7903 13080 684
7903 13080 684
7903 13080 684

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/03/2013 03/06/2013 7618 4,527,050.0 355267

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 MC B-8642 (WS), NaturaLine MX 588-2 MULTI-CHEM Anti-Bacterial Agent, Scale Inhibitor Proprietary Neutralized Polymer TRADE SECRET 0 0.00115 0
Proprietary Solvent (NaturaLine MX 588-2) TRADE SECRET 0 0.00577 0
Water 007732-18-5 0 0.01756 0
Methanol (Methyl Alcohol) 000067-56-1 0 0.00012 0
CI-150 FTS INTERNATIONAL Corrosion Inhibitor Proprietary Quaternary Ammonium Compound TRADE SECRET 10 0.00019 0
Proprietary Organic Amine Resin Salt TRADE SECRET 30 0.00058 0
Dimethyl Formamide 000068-12-2 10 0.00019 0
Isopropanol (Isopropyl Alcohol, Propan-2-ol) 000067-63-0 60 0.00115 0
Proprietary Aromatic Aldehyde TRADE SECRET 10 0.00019 0
APB01 (AMMONIUM PERSUFATE BREAKER),

B10 (HIGH PH BUFFER), BXL02 Borate XL, CI-150, FE 200, FRW-200, LTB-01

FTS INTERNATIONAL Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Iron Control Agent, pH Adjusting Agent Proprietary Breaker (APB01) Additive TRADE SECRET 0 0.00009000 0
Proprietary Iron Control Additive (FE-200L) TRADE SECRET 0 0.00503 0
Proprietary Corrosion Inhibitor Additive (CI-150) TRADE SECRET 0 0.00101 0
Proprietary Breaker Additive (LTB-1) TRADE SECRET 0 0.03049 0
Water 007732-18-5 0 0.0555 0
Proprietary Friction Reducer Additive

(FRW-200 and FRW-200W)

TRADE SECRET 0 0.03295 0
FE 200 FTS INTERNATIONAL Iron Control Agent Tetrasodium Ethylenediaminetetraacetate 000064-02-8 41 0.00288 0
Sodium Hydroxide 001310-73-2 2 0.00013 0
Trisodium Nitrilotriacetate 005064-31-3 2 0.00014 0
NaturaLine MX 588-2 MULTI-CHEM Scale Inhibitor No Hazardous Components NONE 0 0 0
BXL02 Borate XL FTS INTERNATIONAL Cross Linker Potassium Hydroxide 001310-58-3 12 0.00527 0
Sodium Metaborate Tetrahydrate 010555-76-7 25 0.01098 0
Boric Acid 010043-35-3 15 0.00659 0
APB01 (AMMONIUM PERSUFATE BREAKER) FTS INTERNATIONAL Breaker Ammonium Persulfate 007727-54-0 100 0.00147 0
FRW-200 FTS INTERNATIONAL Friction Reducer Petroleum Distillate Hydrotreated Light 064742-47-8 26 0.00894 0
MC B-8642 (WS) MULTI-CHEM Anti-Bacterial Agent Ethanol 000064-17-5 1 0.00021 0
Glutaraldehyde (Pentanediol) 000111-30-8 60 0.01277 0
Quaternary Ammonium Compound 068424-85-1 10 0.00213 0
Northern White Sand FTS INTERNATIONAL Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 12.7144 0
HVG01 (TURQUOISE-1 BULK) FTS INTERNATIONAL Gelling Agent Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 2 0.0019 0
Guar Gum 009000-30-0 50 0.04745 0
Surfactant 068439-51-0 2 0.0019 0
Petroleum Distillate Hydrotreated Light 064742-47-8 55 0.05219 0
100 Mesh Sand FTS INTERNATIONAL Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 1.2492 0
LTB-01 FTS INTERNATIONAL Breaker Proprietary Cured Acrylic Resin TRADE SECRET 25 0.02623 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 25 0.02623 0
Ammonium Persulfate 007727-54-0 100 0.10492 0
10.1 - 15 HCL FTS INTERNATIONAL Acid Hydrochloric Acid 007647-01-0 15 0.1713 0
Water 007732-18-5 85 0.97072 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 6.55776 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 78.0089 0
B10 (HIGH PH BUFFER) FTS INTERNATIONAL pH Adjusting Agent Potassium Hydroxide 001310-58-3 20 0.00159 0
Potassium Carbonate 000584-08-7 48 0.00381 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-03-03 H2O 15 4877 Bbl 382992 Frac Tech Services STAGE 1

36 SHOTS

2013-03-05 H2O 15 5415 Bbl 332756 Frac Tech Services STAGE 9

36 SHOTS

2013-03-03 H2O 15 4899 Bbl 329034 Frac Tech Services STAGE 2

36 SHOTS

2013-03-04 H2O 15 4959 Bbl 334026 Frac Tech Services STAGE 4

36 SHOTS

2013-03-06 H2O 15 4685 Bbl 330604 Frac Tech Services STAGE 19

36 SHOTS

2013-03-04 H2O 15 5036 Bbl 329648 Frac Tech Services STAGE 8

36 SHOTS

2013-03-06 H2O 15 4779 Bbl 335219 Frac Tech Services STAGE 18

36 SHOTS

2013-03-05 H2O 15 5242 Bbl 330264 Frac Tech Services STAGE 14

36 SHOTS

2013-03-06 H2O 15 5258 Bbl 332251 Frac Tech Services STAGE 16

36 SHOTS

2013-03-06 H2O 15 5237 Bbl 330524 Frac Tech Services STAGE 17

36 SHOTS

2013-03-04 H2O 15 4659 Bbl 330378 Frac Tech Services STAGE 6

36 SHOTS

2013-03-05 H2O 15 5629 Bbl 330457 Frac Tech Services STAGE 12

36 SHOTS

2013-03-05 H2O 15 5199 Bbl 330236 Frac Tech Services STAGE 10

36 SHOTS

2013-03-06 H2O 15 4793 Bbl 331910 Frac Tech Services STAGE 15

36 SHOTS

2013-03-04 H2O 15 6141 Bbl 333795 Frac Tech Services STAGE 5

36 SHOTS

2013-03-05 H2O 15 5398 Bbl 329953 Frac Tech Services STAGE 11

36 SHOTS

2013-03-05 H2O 15 5251 Bbl 329885 Frac Tech Services STAGE 13

36 SHOTS

2013-03-04 H2O 15 4966 Bbl 329207 Frac Tech Services STAGE 7

36 SHOTS

2013-03-03 H2O 15 5209 Bbl 325861 Frac Tech Services STAGE 3

36 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC 250133 17015 241
2014 CHESAPEAKE EXPLORATION LLC 202738 9412 310
2015 CHESAPEAKE EXPLORATION LLC 165694 6953 362
2016 CHESAPEAKE EXPLORATION LLC 136928 4859 366
2017 CHESAPEAKE EXPLORATION LLC 115590 3956 365
2018 CHESAPEAKE EXPLORATION LLC 101208 3162 363
2019 CHESAPEAKE EXPLORATION LLC 22232 690 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC Brine 10505 241
2014 CHESAPEAKE EXPLORATION LLC Brine 643 310
2015 CHESAPEAKE EXPLORATION LLC Brine 675 362
2016 CHESAPEAKE EXPLORATION LLC Brine 1436 366
2017 CHESAPEAKE EXPLORATION LLC Brine 485 365
2018 CHESAPEAKE EXPLORATION LLC Brine 478 363
2019 CHESAPEAKE EXPLORATION LLC Brine 136 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1124307600 2015-12-7 0:00: PL No Violations
-460084422 2012-12-7 0:00: DD No Violations 3.00
0460084422 2012-12-07 Drill / Deepen / Reopen No Violations I was on site to witness the cementing of the 20 conductor casing. Inspection revealed that Precision Rathole has drilled a 26 hole to 36 and a 24 hole from 36 to 120. They ran 109 of 94 pound per foot 20 casing. Allied Cementing Company cemented the casing with 171 sacks of Class A cement (2% CaCl and .5 pound per sack floseal). The cement had a density of 15.6 pound per gallon and and a yield of 1.18 cubic feet per sack. There was good circulation throughout the job and there was approximately 10 barrels of cement circulated to surface. I walked the perimeter of the well site and found no erosion/sedimentation on any of the slopes of the well pad. No violations were noted at this time.
1124307600 2015-12-07 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is equipped with a plunger lift unit. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of six, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

For data sources see[10]

References