34-019-22254

Well Details

Well ID: 34-019-22254
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: East Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000541
Farm/Lease Name: LESLIE 9-14-4
License Status: Producing
License Date: 2012-11-13
Spud Date: 2014-05-24
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-06-27
Well Total Depth: 13808.00 ft
Configuration: Horizontal
Latitude: 40.710000
Longitude: -80.930000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-11-13 Proposed Formations:POINT PLEASANT, Issued Date:11/13/2012, Expired Date:11/13/2014 12:00:00 PM, Drilling unit acres:166.05, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-06-27
Correction to Well 2014-07-03 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 146.08 ACRES.
Construction Permit Expires 2014-11-13
Correction to Well 2015-01-02 UPDATE OF TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM NEW PLAT.
Completion Report Received 2015-03-02
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-03-02 8295 13612 600
8295 13612 600
8295 13612 600

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 12/07/2014 12/12/2014 7911 4,556,620.0 340334

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 PTLBW102 PERFORMANCE TECHNOLOGIES Breaker Ammonium Persulfate 007727-54-0 100 0.00331 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 0.22472 0
PTLGL341 PERFORMANCE TECHNOLOGIES Gelling Agent Solvent naptha, (petroleum) heavy aliphatic 064742-96-7 65 0.06984 0
Non-MSDS Components Not Provided by Supplier NOT PROVIDED 0 0 0
OilSafe AR (Acid Replacement) 1:1 Dilution HEARTLAND SOLUTIONS Acid Patented Synthetic Acid TRADE SECRET 50 0.02369 0
Water 007732-18-5 50 0.02369 0
TS-30 TERRA SERVICES Scale Inhibitor Proprietary Sodium Polycarboxylate TRADE SECRET 100 0.00931 0
Water 007732-18-5 0 0.01093 0
Chlorine Dioxide TERRA SERVICES Anti-Bacterial Agent Chlorine Dioxide 010049-04-4 100 0.00936 0
OilSafe AR (Acid Replacement) 1:2 Dilution HEARTLAND SOLUTIONS Acid Water 007732-18-5 67 0.37443 0
Patented Synthetic Acid TRADE SECRET 33 0.18442 0
PTLDFR121 PERFORMANCE TECHNOLOGIES Friction Reducer Proprietary Anionic Water-Soluble Polymer TRADE SECRET 100 0.01556 0
No Hazardous Components NONE 0 0 0
Northern White Sand PERFORMANCE TECHNOLOGIES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 13.3551 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 84.2511 0
100 Mesh Sand PERFORMANCE TECHNOLOGIES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 1.41791 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-12-07 H2O 0 3470 Bbl 329840 Performance Technologies STAGE 1/20

30 SHOTS STAGES 2-29 SEE IMAGES

2014-12-12 H2O 0 3014 Bbl 330330 Performance Technologies STAGE 20/20

30 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 CHESAPEAKE EXPLORATION LLC 977100 9418 353
2016 CHESAPEAKE EXPLORATION LLC 519394 2278 366
2017 CHESAPEAKE EXPLORATION LLC 370335 1291 364
2018 CHESAPEAKE EXPLORATION LLC 291336 856 362
2019 CHESAPEAKE EXPLORATION LLC 62781 185 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 CHESAPEAKE EXPLORATION LLC Brine 7881 353
2016 CHESAPEAKE EXPLORATION LLC Brine 1189 366
2017 CHESAPEAKE EXPLORATION LLC Brine 881 364
2018 CHESAPEAKE EXPLORATION LLC Brine 696 362
2019 CHESAPEAKE EXPLORATION LLC Brine 563 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1489485715 2016-2-25 0:00: PW No Violations 0.50
0030209010 2014-05-25 Drill / Deepen / Reopen No Violations
0119801142 2015-12-07 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of six, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:


Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

119801142 2015-12-7 0:00: PL No Violations
1317716049 2014-06-21 Drill / Deepen / Reopen No Violations I was on location for the cementing of the intermediate casing. Nomac drilled a 12.25 Hole #3 to 1,760 from rig floor (RF) and set 9.625 casing to 1,750 RF with 10 centralizers. The casing had a weight of 40 lbs/ft and rating of J-55. A float shoe and collar was installed on the casing. The float collar was between the second and third joints. O-Tex rigged up and established circulation with 5 bbls of fresh water. O-Tex mixed and pumped 35 bbls of a gel spacer, 10 bbls of a fresh water spacer and 155 bbls (720 sacks) of Premium H cement with a yield of 1.21 and 15.6 PPG. Next, O-Tex released the plug and displaced the cement to 1,661 with 126 bbls of fresh water. I witnessed 37 bbls of good cement returned to surface. Once the plug landed, O-Tex pressured up from 1,000 psi to 1,490 psi and held static for 5 minutes. Pressure on the plug was release and there was 0.75 bbl of flow back water.
1403514973 2014-06-19 Drill / Deepen / Reopen No Violations I was on location for the cementing of the surface casing. I found during my inspection Nomac Rig 70 running the surface casing into the hole. O-Tex was on location to perform the cement job. Nomac drilled a 17.5 Hole #2 to 794 from rig floor (KB) and set 13.375 casing to 784 KB with 7 centralizers. The rig floor height was 2011. The casing had a weight of 54.5 lbs/ft and rating of J-55. I observed a guide shoe and float collar installed on the first joint of the casing string. Once the casing was set; O-Tex rigged up and established circulation with 5 bbls of fresh water. O-Tex mixed and pumped 30 bbls of a gel spacer, 10 bbls of a fresh water spacer and 149 bbls (700 sacks) of Premium H cement with a yield of 1.2 and 15.6 PPG. Next, O-Tex released the plug and displaced the cement to 741 with 114 bbls of fresh water. I witnessed 29 bbls of good cement returned to surface. Once the plug landed, O-Tex pressured up to 825 psi and held static for 5 minutes. Pressure on the plug was release and there was 1 bbl of flow back water. Cement samples was taken and weighed at 15.3 and 15.6 respectively. NOTE: Setting the casing took longer than expected. Nomac had to wash the casing into the hole due to buoyancy in the hole.
1410957406 2014-06-18 Drill / Deepen / Reopen No Violations I performed a status check on the above drilling location. Nomac Rig 70 is drilling a 17.5 hole to a purposed depth of 785. They should be at there purposed depth on 6/19/2014. I instructed them that I would be on vacation at that time and for them to call Inspector Rick Skidmore when they were ready to cement the 13 3/8 surface casing. I walked the location there is no spills, location is clean. No noted violations at this time.
1489485715 2016-02-25 Production Wells No Violations I was on location for a status check. My inspection found the access road gate locked and the access road is in good repair. An identification sign at the access road entrance, well, and tank battery. The pad is fenced and all man doors are locked. The #8H well is in production. The well is equipped with a christmas tree valve assembly. There is a steel dike around the storage tank.

The equipment on the pad consists of the following: 6 Storage tanks 1 Vapor recovery unit (VRU) 1 Gas processing unit (GPU) 1 Vertical separator 1 Sand separator 1 Thermal electric generator 1 Producing well 1 Conductor Site fenced and man doors locked

30209010 2014-5-25 0:00: DD No Violations

For data sources see[10]