If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22259 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.5,"lon":-80.99,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Lee Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000524 | |
Farm/Lease Name: ENOLD 3-13-5 | |
License Status: Producing | |
License Date: 2013-04-17 | |
Spud Date: 2013-05-09 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-05-20 | |
Well Total Depth: 12751.00 ft | |
Configuration: Horizontal | |
Latitude: 40.500000 | |
Longitude: -80.990000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-11-19 | Proposed Formations:TRENTON-BLACK RIVER, Issued Date:11/19/2012, Expired Date:11/19/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2013-04-17 | Proposed Formations:POINT PLEASANT, Issued Date:4/17/2013, Expired Date:4/17/2015 12:00:00 PM, Drilling unit acres:405.38, Proposed Well Type:OG, Proposed Well Class:EOUT |
Correction to Well | 2013-05-17 | CORRECTION TO GROUND LEVEL ELEVATION & SURFACE FOOTAGE. |
Reached Total Depth | 2013-05-20 | |
Correction to Well | 2014-02-07 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2014-07-11 | |
Correction to Well | 2014-07-25 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Construction Permit Expires | 2015-04-17 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-09-15 | 82621 | 12530 | 480 |
82621 | 12530 | 480 | |
82621 | 12530 | 480 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/05/2014 | 03/08/2014 | 8126 | 3,948,880.0 | 302918 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 85.4375 | 0 |
A264, B244, B317, J218, J475, J580,
J609, J610, L058, Acid, Hydrochloric 15pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural | Ethane-1,2-diol | 107-21-1 | 0 | 0.00021 | 0 | |
Sodium sulfate | 7757-82-6 | 0.02 | 0.00245 | 0 | ||||
Sodium erythorbate | 6381-77-7 | 0 | 0.00066 | 0 | ||||
Dimethyl siloxanes and silicones | 63148-62-9 | 0 | 0.00001000 | 0 | ||||
Glutaraldehyde | 111-30-8 | 0.04 | 0.00574 | 0 | ||||
Acrylamide, 2-acrylamido-2-methylpropanesulfonic
acid, sodium salt polymer |
38193-60-1 | 0.04 | 0.00599 | 0 | ||||
Alkenes, C>10 a- | 64743-02-8 | 0 | 0.00008000 | 0 | ||||
Magnesium silicate hydrate (talc) | 14807-96-6 | 0 | 0.00003000 | 0 | ||||
Tetrasodium ethylenediaminetetraacetate | 64-02-8 | 0 | 0.00001000 | 0 | ||||
Prop-2-yn-1-ol | 107-19-7 | 0 | 0.00012 | 0 | ||||
Potassium borate | 1332-77-0 | 0.17 | 0.02516 | 0 | ||||
Alcohols, C14-15, ethoxylated (7EO) | 68951-67-7 | 0 | 0.00018 | 0 | ||||
poly(tetrafluoroethylene) | 9002-84-0 | 0 | 0.00001000 | 0 | ||||
Hydrogen chloride | 7647-01-0 | 1.43 | 0.2076 | 0 | ||||
Dodecamethylcyclohexasiloxane | 540-97-6 | 0 | 0 | 0 | ||||
Crystalline silica | 14808-60-7 | 97.62 | 14.2162 | 0 | ||||
Non-crystalline silica | 7631-86-9 | 0 | 0.00026 | 0 | ||||
Glycerol | 56-81-5 | 0.06 | 0.00821 | 0 | ||||
Guar gum | 9000-30-0 | 0.52 | 0.07518 | 0 | ||||
Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen
phosphate), sodium salt |
68171-29-9 | 0.01 | 0.00171 | 0 | ||||
Siloxanes and Silicones, di-Me,
reaction products with silica |
67762-90-7 | 0 | 0 | 0 | ||||
Trisodium ortho phosphate | 7601-54-9 | 0.01 | 0.00075 | 0 | ||||
Diammonium peroxidisulphate | 7727-54-0 | 0.03 | 0.0043 | 0 | ||||
Methanol | 67-56-1 | 0 | 0.00066 | 0 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0 | 0.00048 | 0 | ||||
Urea | 57-13-6 | 0 | 0.00039 | 0 | ||||
Polymer of 2-acrylamido-2-methylpropanesulfonic
acid sodium salt and methyl acrylate |
136793-29-8 | 0 | 0.00064 | 0 | ||||
Potassium hydroxide | 1310-58-3 | 0.06 | 0.0093 | 0 | ||||
Decamethyl cyclopentasiloxane | 541-02-6 | 0 | 0 | 0 | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 0 | 0 | 0 | ||||
Thiourea, polymer with formaldehyde and 1-phenylethanone | 68527-49-1 | 0 | 0.0004 | 0 | ||||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 0.01 | 0.00082 | 0 | ||||
Sodium hydroxide | 1310-73-2 | 0 | 0 | 0 | ||||
Ammonium sulfate | 7783-20-2 | 0.04 | 0.00566 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-03-08 | H2O | 15 | 5640 Bbl | 336860 | Schlumberger | STAGE 16/16
30 SHOTS |
2014-03-05 | H2O | 15 | 6158 Bbl | 334380 | Schlumberger | STAGE 1/16
30 SHOTS STAGES 2-15 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | 423697 | 10817 | 216 |
2015 | CHESAPEAKE EXPLORATION LLC | 401206 | 3230 | 353 |
2016 | CHESAPEAKE EXPLORATION LLC | 253526 | 1480 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 200898 | 1694 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 164626 | 1082 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 36342 | 342 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 11174 | 216 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 4929 | 353 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 2861 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 2208 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1620 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 570 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-711866609 | 2015-11-30 0:00 | PL | No Violations | |
0394735587 | 2016-03-01 | Production Wells | No Violations | I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road was equipped with a gate and was locked. The #3H well is in production. The well is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence and all man doors were locked.
The equipment on the pad consists of the following: 6 - 400 bbl production tanks, three labelled as containing produced water, and three labelled as containing condensate. 1 Low pressure vertical separator located inside the dike 6 Producing wells 6 Sand separators 6 Gas processing units 1 Heat Treater 1 Vapor Recovery Unit |
0711866609 | 2015-11-30 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of six, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:
|
1919857021 | 2018-12-18 | Production Wells | No Violations | The well was equipped with a plunger-lift assembly. The surface/intermediate annular gauge displayed a reading of zero psi, and the intermediate/production annular gauge displayed approximately 400 psi. I performed a walk-around inspection of the production pad and erosional controls appeared in-place. No violations were observed at the well or production pad at the time of inspection. |
394735587 | 2016-3-1 0:00:0 | PW | No Violations | 1.00 |
For data sources see[10]