X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22303

Well Details

Well ID: 34-019-22303
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Perry Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000637
Farm/Lease Name: RAY HAYLEY 5-13-6
License Status: Producing
License Date: 2013-02-26
Spud Date: 2013-04-03
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2013-04-18
Well Total Depth: 15125.00 ft
Configuration: Horizontal
Latitude: 40.450000
Longitude: -81.110000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-01-24 Proposed Formations:TRENTON-BLACK RIVER, Issued Date:1/24/2013, Expired Date:1/24/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2013-02-26 Proposed Formations:POINT PLEASANT, Issued Date:2/26/2013, Expired Date:2/26/2015 12:00:00 PM, Drilling unit acres:198.92, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-04-18
Completion Report Received 2014-06-30
Construction Permit Expires 2015-02-26
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-06-30 8146 14918 735
8146 14918 735
8146 14918 735

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/02/2013 10/05/2013 7824 5,661,260.0 423730

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 78.7731 0
A264, B244, B317, J218, J475, J580,

J609, J610, L058, Acid, Hydrochloric 15 pct, Northern White Sand, 100 Mesh Sand

SCHLUMBERGER Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant-Natural Acrylamide, 2-acrylamido-2-methylpropanesulfonic

acid, sodium salt polymer

38193-60-1 0.08 0.01462 0
Siloxanes and Silicones, di-Me,

reaction products with silica

67762-90-7 0 0 0
Sodium erythorbate 6381-77-7 0 0.00081 0
Prop-2-yn-1-ol 107-19-7 0 0.0001 0
Sodium sulfate 7757-82-6 0.03 0.00597 0
Glycerol 56-81-5 0.02 0.0033 0
Guar gum 9000-30-0 0.43 0.07697 0
Urea 57-13-6 0.01 0.00096 0
Methanol 67-56-1 0 0.00055 0
Hydrogen chloride 7647-01-0 0.93 0.16522 0
Magnesium silicate hydrate (talc) 14807-96-6 0 0.00001000 0
Sodium hydroxide 1310-73-2 0 0 0
Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen

phosphate), sodium salt

68171-29-9 0.01 0.0021 0
Decamethyl cyclopentasiloxane 541-02-6 0 0 0
Potassium borate 1332-77-0 0.06 0.01011 0
Thiourea, polymer with formaldehyde and 1-phenylethanone 68527-49-1 0 0.00033 0
Alkenes, C>10 a- 64743-02-8 0 0.00007000 0
Dodecamethylcyclohexasiloxane 540-97-6 0 0 0
Glutaraldehyde 111-30-8 0.04 0.00738 0
Crystalline silica 14808-60-7 98.26 17.4361 0
Diammonium peroxidisulphate 7727-54-0 0.01 0.00219 0
Polymer of 2-acrylamido-2-methylpropanesulfonic

acid sodium salt and methyl acrylate

136793-29-8 0.01 0.00157 0
Non-crystalline silica 7631-86-9 0 0.00035 0
Ethane-1,2-diol 107-21-1 0 0.00026 0
Vinylidene chloride/methylacrylate copolymer 25038-72-6 0 0.0003 0
Ammonium sulfate 7783-20-2 0.08 0.01382 0
Potassium hydroxide 1310-58-3 0.02 0.00373 0
poly(tetrafluoroethylene) 9002-84-0 0 0 0
Dimethyl siloxanes and silicones 63148-62-9 0 0.00001000 0
Octamethylcyclotetrasiloxane 556-67-2 0 0 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0 0.00003000 0
Trisodium ortho phosphate 7601-54-9 0.01 0.00092 0
Alcohols, C14-15, ethoxylated (7EO) 68951-67-7 0 0.00015 0
Fatty acids, tall-oil 61790-12-3 0 0.0004 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 6.14114 0
NONE NONE NONE NONE NA 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-10-05 H2O 15 6140 Gal 377120 Schlumberger STAGE 21/21
0 0 0
2013-10-02 H2O 15 6369 Gal 373440 Schlumberger STAGE 1/21

35 SHOTS STAGES 2-20 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC 43404 7349 30
2014 CHESAPEAKE EXPLORATION LLC 278550 36411 165
2015 CHESAPEAKE EXPLORATION LLC 285216 30049 299
2016 CHESAPEAKE EXPLORATION LLC 188322 18278 365
2017 CHESAPEAKE EXPLORATION LLC 147759 12400 345
2018 CHESAPEAKE EXPLORATION LLC 125917 10455 365
2019 CHESAPEAKE EXPLORATION LLC 27318 2338 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC Brine 4555 30
2014 CHESAPEAKE EXPLORATION LLC Brine 5769 165
2015 CHESAPEAKE EXPLORATION LLC Brine 7226 299
2016 CHESAPEAKE EXPLORATION LLC Brine 1382 365
2017 CHESAPEAKE EXPLORATION LLC Brine 1295 345
2018 CHESAPEAKE EXPLORATION LLC Brine 702 365
2019 CHESAPEAKE EXPLORATION LLC Brine 348 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1453668239 2019-12-9 0:00: PW No Violations 0.80
-294286338 2018-11-19 0:00 PW No Violations 1.00
-444134588 2017-3-2 0:00:0 PL No Violations 1.00
0161001144 2013-03-07 Drill / Deepen / Reopen No Violations I was on site to witness the cementing of the 20 conductor casing. My inspection revealed that Express Energy Services drilled a 26 inch hole to a total depth of 120 feet and ran 20 casing to a depth of 120 feet. OTEX cemented the casing with 250 sacks of Class A cement (2% CaCl; .5 lb/sack cello flake; .4% C-41P). The cement had a density of 15.6 pounds per gallon; a yield of 1.18 cubic feet per sack, and used 5.2 gallons of mix water per sack cement. There was good circulation throughout the job and 4 barrels of cement was circulated to surface. My inspection also revealed no violations at this time. NOTE: Had to wait on a second vacuum truck to arrive on site to start the cement job.
0294286338 2018-11-19 Production Wells No Violations The well was equipped with a plunger-lift assembly. The surface/intermediate and intermediate/production annular gauges displayed readings of zero psi. I performed a walk-around inspection of the pad and erosional controls appeared functioning. No violations were observed at the time of inspection.
0444134588 2017-03-02 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The #3H well is in production and is equipped with an open flow assembly Jersey barriers were installed around the wellhead. The well is identified with a legibly-marked well identification sign. Identification was posted at the tank battery which consisted of eight 400 bbl production tanks, four labeled as containing produced water, and four labelled as containing condensate, and one low-pressure vertical separator. The tank battery is surrounded by a dike. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Production equipment on the well pad consisted of:

6 producing wells 8- 400 bbl production tanks, four labelled as containing fresh water, and four labelled as containing condensate 6 sand separators 6 gas processing units 1 low pressure vertical separator located inside of the dike 1 vapor recovery unit 1 horizontal separator, 1 compressor station 2 bullet tanks Jersey barriers are installed around the production equipment. The access road and man doors were locked. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road was stable in in good repair.

161001144 2013-3-7 0:00:0 DD No Violations 4.00

For data sources see[10]

References