If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22303 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.45,"lon":-81.11,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Perry Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000637 | |
Farm/Lease Name: RAY HAYLEY 5-13-6 | |
License Status: Producing | |
License Date: 2013-02-26 | |
Spud Date: 2013-04-03 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-04-18 | |
Well Total Depth: 15125.00 ft | |
Configuration: Horizontal | |
Latitude: 40.450000 | |
Longitude: -81.110000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-01-24 | Proposed Formations:TRENTON-BLACK RIVER, Issued Date:1/24/2013, Expired Date:1/24/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2013-02-26 | Proposed Formations:POINT PLEASANT, Issued Date:2/26/2013, Expired Date:2/26/2015 12:00:00 PM, Drilling unit acres:198.92, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-04-18 | |
Completion Report Received | 2014-06-30 | |
Construction Permit Expires | 2015-02-26 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-06-30 | 8146 | 14918 | 735 |
8146 | 14918 | 735 | |
8146 | 14918 | 735 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/02/2013 | 10/05/2013 | 7824 | 5,661,260.0 | 423730 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 78.7731 | 0 |
A264, B244, B317, J218, J475, J580,
J609, J610, L058, Acid, Hydrochloric 15 pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant-Natural | Acrylamide, 2-acrylamido-2-methylpropanesulfonic
acid, sodium salt polymer |
38193-60-1 | 0.08 | 0.01462 | 0 | |
Siloxanes and Silicones, di-Me,
reaction products with silica |
67762-90-7 | 0 | 0 | 0 | ||||
Sodium erythorbate | 6381-77-7 | 0 | 0.00081 | 0 | ||||
Prop-2-yn-1-ol | 107-19-7 | 0 | 0.0001 | 0 | ||||
Sodium sulfate | 7757-82-6 | 0.03 | 0.00597 | 0 | ||||
Glycerol | 56-81-5 | 0.02 | 0.0033 | 0 | ||||
Guar gum | 9000-30-0 | 0.43 | 0.07697 | 0 | ||||
Urea | 57-13-6 | 0.01 | 0.00096 | 0 | ||||
Methanol | 67-56-1 | 0 | 0.00055 | 0 | ||||
Hydrogen chloride | 7647-01-0 | 0.93 | 0.16522 | 0 | ||||
Magnesium silicate hydrate (talc) | 14807-96-6 | 0 | 0.00001000 | 0 | ||||
Sodium hydroxide | 1310-73-2 | 0 | 0 | 0 | ||||
Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen
phosphate), sodium salt |
68171-29-9 | 0.01 | 0.0021 | 0 | ||||
Decamethyl cyclopentasiloxane | 541-02-6 | 0 | 0 | 0 | ||||
Potassium borate | 1332-77-0 | 0.06 | 0.01011 | 0 | ||||
Thiourea, polymer with formaldehyde and 1-phenylethanone | 68527-49-1 | 0 | 0.00033 | 0 | ||||
Alkenes, C>10 a- | 64743-02-8 | 0 | 0.00007000 | 0 | ||||
Dodecamethylcyclohexasiloxane | 540-97-6 | 0 | 0 | 0 | ||||
Glutaraldehyde | 111-30-8 | 0.04 | 0.00738 | 0 | ||||
Crystalline silica | 14808-60-7 | 98.26 | 17.4361 | 0 | ||||
Diammonium peroxidisulphate | 7727-54-0 | 0.01 | 0.00219 | 0 | ||||
Polymer of 2-acrylamido-2-methylpropanesulfonic
acid sodium salt and methyl acrylate |
136793-29-8 | 0.01 | 0.00157 | 0 | ||||
Non-crystalline silica | 7631-86-9 | 0 | 0.00035 | 0 | ||||
Ethane-1,2-diol | 107-21-1 | 0 | 0.00026 | 0 | ||||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 0 | 0.0003 | 0 | ||||
Ammonium sulfate | 7783-20-2 | 0.08 | 0.01382 | 0 | ||||
Potassium hydroxide | 1310-58-3 | 0.02 | 0.00373 | 0 | ||||
poly(tetrafluoroethylene) | 9002-84-0 | 0 | 0 | 0 | ||||
Dimethyl siloxanes and silicones | 63148-62-9 | 0 | 0.00001000 | 0 | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 0 | 0 | 0 | ||||
Tetrasodium ethylenediaminetetraacetate | 64-02-8 | 0 | 0.00003000 | 0 | ||||
Trisodium ortho phosphate | 7601-54-9 | 0.01 | 0.00092 | 0 | ||||
Alcohols, C14-15, ethoxylated (7EO) | 68951-67-7 | 0 | 0.00015 | 0 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0 | 0.0004 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 6.14114 | 0 | |
NONE | NONE | NONE | NONE | NA | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-10-05 | H2O | 15 | 6140 Gal | 377120 | Schlumberger | STAGE 21/21 |
0 | 0 | 0 | ||||
2013-10-02 | H2O | 15 | 6369 Gal | 373440 | Schlumberger | STAGE 1/21
35 SHOTS STAGES 2-20 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | 43404 | 7349 | 30 |
2014 | CHESAPEAKE EXPLORATION LLC | 278550 | 36411 | 165 |
2015 | CHESAPEAKE EXPLORATION LLC | 285216 | 30049 | 299 |
2016 | CHESAPEAKE EXPLORATION LLC | 188322 | 18278 | 365 |
2017 | CHESAPEAKE EXPLORATION LLC | 147759 | 12400 | 345 |
2018 | CHESAPEAKE EXPLORATION LLC | 125917 | 10455 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 27318 | 2338 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 4555 | 30 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 5769 | 165 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 7226 | 299 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 1382 | 365 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 1295 | 345 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 702 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 348 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1453668239 | 2019-12-9 0:00: | PW | No Violations | 0.80 |
-294286338 | 2018-11-19 0:00 | PW | No Violations | 1.00 |
-444134588 | 2017-3-2 0:00:0 | PL | No Violations | 1.00 |
0161001144 | 2013-03-07 | Drill / Deepen / Reopen | No Violations | I was on site to witness the cementing of the 20 conductor casing. My inspection revealed that Express Energy Services drilled a 26 inch hole to a total depth of 120 feet and ran 20 casing to a depth of 120 feet. OTEX cemented the casing with 250 sacks of Class A cement (2% CaCl; .5 lb/sack cello flake; .4% C-41P). The cement had a density of 15.6 pounds per gallon; a yield of 1.18 cubic feet per sack, and used 5.2 gallons of mix water per sack cement. There was good circulation throughout the job and 4 barrels of cement was circulated to surface. My inspection also revealed no violations at this time. NOTE: Had to wait on a second vacuum truck to arrive on site to start the cement job. |
0294286338 | 2018-11-19 | Production Wells | No Violations | The well was equipped with a plunger-lift assembly. The surface/intermediate and intermediate/production annular gauges displayed readings of zero psi. I performed a walk-around inspection of the pad and erosional controls appeared functioning. No violations were observed at the time of inspection. |
0444134588 | 2017-03-02 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The #3H well is in production and is equipped with an open flow assembly Jersey barriers were installed around the wellhead. The well is identified with a legibly-marked well identification sign. Identification was posted at the tank battery which consisted of eight 400 bbl production tanks, four labeled as containing produced water, and four labelled as containing condensate, and one low-pressure vertical separator. The tank battery is surrounded by a dike. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Production equipment on the well pad consisted of:
6 producing wells 8- 400 bbl production tanks, four labelled as containing fresh water, and four labelled as containing condensate 6 sand separators 6 gas processing units 1 low pressure vertical separator located inside of the dike 1 vapor recovery unit 1 horizontal separator, 1 compressor station 2 bullet tanks Jersey barriers are installed around the production equipment. The access road and man doors were locked. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road was stable in in good repair. |
161001144 | 2013-3-7 0:00:0 | DD | No Violations | 4.00 |
For data sources see[10]