If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22372 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.59,"lon":-80.93,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Fox Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000696 | |
Farm/Lease Name: BEADNELL A 21-13-4 | |
License Status: Producing | |
License Date: 2013-03-18 | |
Spud Date: 2013-05-20 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-07-28 | |
Well Total Depth: 14610.00 ft | |
Configuration: Horizontal | |
Latitude: 40.590000 | |
Longitude: -80.930000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-03-18 | Proposed Formations:POINT PLEASANT, Issued Date:3/18/2013, Expired Date:3/18/2015 12:00:00 PM, Drilling unit acres:177.77, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-07-28 | |
Correction to Well | 2013-11-08 | CORRECTION TO TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 159.42 ACRES. |
Correction to Well | 2014-04-04 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 159.21 ACRES. |
Completion Report Received | 2014-05-09 | |
Construction Permit Expires | 2015-03-18 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-04-09 | 8346 | 14390 | 690 |
8346 | 14390 | 690 | |
8346 | 14390 | 690 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/31/2014 | 02/04/2014 | 8065 | 6,305,800.0 | 438541 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 100 Mesh Sand | WEATHERFORD | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 3.76297 | 0 |
WAI-251LC | WEATHERFORD | Corrosion Inhibitor | Dimethyl Formamide | 000068-12-2 | 40 | 0.00041 | 0 | |
Cinnamaldehyde | 000104-55-2 | 10 | 0.0001 | 0 | ||||
2-Butoxyethanol (Ethylene Glycol Monobutyl Ether) | 000111-76-2 | 7 | 0.00007000 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-qauternized | 072480-70-7 | 13 | 0.00013 | 0 | ||||
Branched-Ethoxylated Nonyl Phenol
(Branched-Nonyl Phenol Ethoxylate) |
068412-54-4 | 10 | 0.0001 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 60 | 0.00062 | 0 | ||||
Isopropanol (Isopropyl Alcohol, Propan-2-ol) | 000067-63-0 | 7 | 0.00007000 | 0 | ||||
Triethyl Phosphate | 000078-40-0 | 7 | 0.00007000 | 0 | ||||
WIC-641L | WEATHERFORD | Iron Control Agent | Citric Acid | 000077-92-9 | 70 | 0.00222 | 0 | |
WBK-133 OXIDIZER | WEATHERFORD | Breaker | Ammonium Persulfate | 007727-54-0 | 100 | 0.00015 | 0 | |
BIOCLEAR 5000 | WEATHERFORD | Anti-Bacterial Agent | 2,2-Dibromo-3-Nitrilopropionamide | 010222-01-2 | 10 | 0.00144 | 0 | |
ACID, HYDROCHLORIC, 15 PCT | WEATHERFORD | Acid | Hydrochloric Acid | 007647-01-0 | 15 | 0.15704 | 0 | |
Water | 007732-18-5 | 85 | 0.88988 | 0 | ||||
Northern White Sand | WEATHERFORD | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 8.77676 | 0 | |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 86.0939 | 0 | |
BIOCLEAR 5000, WAI-251LC, WBK-134,
WFR-61LA, WGA-15L, WIC-641L, WSI-685L, WXL-106L |
WEATHERFORD | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor | Water | 007732-18-5 | 0 | 0.07381 | 0 | |
Polyethylene Glycol | 025322-68-3 | 0 | 0.01563 | 0 | ||||
Proprietary Phosphonic Acid Ammonium Salt | TRADE SECRET | 0 | 0.01497 | 0 | ||||
Guar Gum | 009000-30-0 | 0 | 0.13368 | 0 | ||||
Proprietary Friction Reducer Additive (WFR-61LA) | TRADE SECRET | 0 | 0.03388 | 0 | ||||
Sorbitan | 008007-43-0 | 0 | 0.13368 | 0 | ||||
Proprietary Alcohol | TRADE SECRET | 0 | 0.00034 | 0 | ||||
Proprietary Breaker Additive (WBK-134) | TRADE SECRET | 0 | 0.00204 | 0 | ||||
Alcohols ethoxylated C12-16 | 068551-12-2 | 0 | 0.13368 | 0 | ||||
Proprietary Ethoxylated Nonylphenol | TRADE SECRET | 0 | 0.00034 | 0 | ||||
WGA-15L | WEATHERFORD | Gelling Agent | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 70 | 0.1364 | 0 | |
WFR-61LA | WEATHERFORD | Friction Reducer | Sodium Chloride | 007647-14-5 | 10 | 0.004 | 0 | |
Quaternary Ammonium Chloride (Ammonium Chloride) | 012125-02-9 | 7 | 0.0028 | 0 | ||||
Petroleum Distillate Hydrotreated Light | 064742-47-8 | 40 | 0.01602 | 0 | ||||
Alcohols ethoxylated C12-16 | 068551-12-2 | 7 | 0.0028 | 0 | ||||
WSI-685L | WEATHERFORD | Scale Inhibitor | Monoethanolamine Hydrochloride | 002002-24-6 | 15 | 0.00221 | 0 | |
Quaternary Ammonium Chloride (Ammonium Chloride) | 012125-02-9 | 15 | 0.00221 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 3 | 0.00037 | 0 | ||||
WXL-106L | WEATHERFORD | Cross Linker | Potassium Tetraborate | 001332-77-0 | 40 | 0.01841 | 0 | |
Potassium Hydroxide | 001310-58-3 | 13 | 0.00598 | 0 | ||||
WBK-134 | WEATHERFORD | Breaker | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 10 | 0.00051 | 0 | |
Ammonium Persulfate | 007727-54-0 | 80 | 0.00408 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-02-03 | H2O | 15 | 6197 Bbl | 333000 | Weatherford | STAGE 21
30 SHOTS |
2014-02-02 | H2O | 15 | 6694 Bbl | 333440 | Weatherford | STAGE 14
30 SHOTS |
2014-02-03 | H2O | 15 | 6325 Bbl | 333660 | Weatherford | STAGE 17
30 SHOTS |
2014-02-04 | H2O | 15 | 6127 Bbl | 332720 | Weatherford | STAGE 22
30 SHOTS |
2014-02-03 | H2O | 15 | 6324 Bbl | 333960 | Weatherford | STAGE 18
30 SHOTS |
2014-02-01 | H2O | 15 | 6302 Bbl | 333960 | Weatherford | STAGE 5
30 SHOTS |
2014-01-31 | H2O | 15 | 6287 Bbl | 334380 | Weatherford | STAGE 2
30 SHOTS |
2014-01-31 | H2O | 15 | 6619 Bbl | 332640 | Weatherford | STAGE 1
30 SHOTS |
2014-02-04 | H2O | 15 | 6321 Bbl | 333880 | Weatherford | STAGE 23
30 SHOTS |
2014-02-01 | H2O | 15 | 6422 Bbl | 333500 | Weatherford | STAGE 4
30 SHOTS |
2014-02-02 | H2O | 15 | 6389 Bbl | 333320 | Weatherford | STAGE 10
30 SHOTS |
2014-01-31 | H2O | 15 | 6510 Bbl | 333400 | Weatherford | STAGE 3
30 SHOTS |
2014-02-02 | H2O | 15 | 6359 Bbl | 333980 | Weatherford | STAGE 15
30 SHOTS |
2014-02-02 | H2O | 15 | 6380 Bbl | 333220 | Weatherford | STAGE 11
30 SHOTS |
2014-02-01 | H2O | 15 | 6356 Bbl | 333580 | Weatherford | STAGE 9
30 SHOTS |
2014-02-01 | H2O | 15 | 6304 Bbl | 333300 | Weatherford | STAGE 6
30 SHOTS |
2014-02-03 | H2O | 15 | 6334 Bbl | 333360 | Weatherford | STAGE 19
30 SHOTS |
2014-02-03 | H2O | 15 | 6285 Bbl | 333980 | Weatherford | STAGE 16
30 SHOTS |
2014-02-03 | H2O | 15 | 6248 Bbl | 333820 | Weatherford | STAGE 20
30 SHOTS |
2014-02-01 | H2O | 15 | 6402 Bbl | 332200 | Weatherford | STAGE 8
30 SHOTS |
2014-02-02 | H2O | 15 | 6209 Bbl | 333440 | Weatherford | STAGE 13
30 SHOTS |
2014-02-01 | H2O | 15 | 6447 Bbl | 332980 | Weatherford | STAGE 7
30 SHOTS |
2014-02-02 | H2O | 15 | 6228 Bbl | 333560 | Weatherford | STAGE 12
30 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | 815217 | 400 | 273 |
2015 | CHESAPEAKE EXPLORATION LLC | 1317942 | 47 | 359 |
2016 | CHESAPEAKE EXPLORATION LLC | 769913 | 34 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 546985 | 49 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 428391 | 12 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 92661 | 5 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 11766 | 273 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 15897 | 359 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 9579 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 6161 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 4127 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 695 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-666719973 | 2016-3-10 0:00: | PL | No Violations | |
0666719973 | 2016-03-10 | Preliminary Restoration | No Violations
| |
0913145490 | 2015-11-16 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of six, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:
Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed. |
913145490 | 2015-11-16 0:00 | PL | No Violations |
For data sources see[10]