If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22452 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.6,"lon":-81.06,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Center Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: US-OH-000747 | |
Farm/Lease Name: JENKINS UNIT | |
License Status: Producing | |
License Date: 2013-06-13 | |
Spud Date: 2014-04-15 | |
Spud Drilling Contractor: SIDEWINDER DRILLING INC | |
Final Drill Date: 2014-04-30 | |
Well Total Depth: 12324.00 ft | |
Configuration: Horizontal | |
Latitude: 40.600000 | |
Longitude: -81.060000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-06-13 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:6/13/2013, Expired Date:6/13/2015 12:00:00 PM, Drilling unit acres:761.95, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2014-03-21 | CHANGE IN UNIT SIZE |
Reached Total Depth | 2014-04-30 | |
Correction to Well | 2015-01-09 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UPDATE TO UNIT SIZE (616.81 ACRES). |
Completion Report Received | 2015-01-15 | |
Construction Permit Expires | 2015-06-13 | |
Correction to Well | 2015-07-31 | UPDATE TO TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM NEW PLAT. |
Change of Owner | 2018-10-03 | Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC |
Record Last Modified | 2018-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-11-05 | 7949 | 12300 | 0 |
7949 | 12300 | 0 | |
7949 | 12300 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/16/2014 | 06/29/2014 | 7700 | 7,099,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Rex Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.7177 | 59,243,700.0 |
Hydrochloric Acid (7.5%) | PVS | Acidizing | Water | 7732-18-5 | 92.5 | 1.36513 | 932628 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.110686 | 75618.5 | ||||
TEA Breaker Activater | Sagar Enterprise | Gel Breaker | Triethanolamine | 102-71-6 | 72.5 | 0.000708414 | 483.974 | |
Diethanolamine | 111-42-2 | 13 | 0.000127026 | 86.781 | ||||
Slurry Gel, WGA-7 SLR | PolyFrac Plus | Gel | Clay | 14808-60-7 | 5 | 0.000157494 | 107.596 | |
Surfactant | 154518-36-2 | 5 | 0.000157494 | 107.596 | ||||
Petroleum Distillate | 64742-47-8 | 45 | 0.00141744 | 968.366 | ||||
Guar Gum | 9000-30-0 | 45 | 0.00141744 | 968.366 | ||||
AP Breaker | Sagar Enterprise | Gel Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.00002737 | 18.7 | |
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Short Chained Glycol Ether | 112-34-5 | 60 | 0.000373869 | 255.42 | |
Acetophenone | 98-86-2 | 1 | 0.00000623 | 4.257 | ||||
Thiourea | 62-56-6 | 1 | 0.00000623 | 4.257 | ||||
Methanol | 67-56-1 | 5 | 0.00003116 | 21.285 | ||||
Ethoxylated alcohol | 68002-97-1 | 35 | 0.00021809 | 148.995 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000623 | 4.257 | ||||
Sand (Proppant) | Sargent/Momentive/Preffered | Proppant | Silica Substrate | 14808-60-7 | 100 | 11.7098 | 7,999,900.0 | |
Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Other - (non-hazardous) | NA | 70 | 0.0148006 | 10111.4 | |
Ethylene Glycol | 107-21-1 | 30 | 0.0063431 | 4333.47 | ||||
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0212301 | 14504 | |
Other - (non-hazardous) | NA | 70 | 0.049537 | 33842.6 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-05-29 | H2O | 8 | 5641 Bbl | 269600 | Universal Well Services Inc. | STAGE 1/29
60 SHOTS STAGES 2-28 SEE IMAGES |
2014-06-29 | H2O | 8 | 6530 Bbl | 264500 | Universal Well Services Inc. | STAGE 29/29
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | R E GAS DEVELOPMENT LLC | 269094 | 24985 | 120 |
2015 | R E GAS DEVELOPMENT LLC | 471393 | 26723 | 352 |
2016 | R E GAS DEVELOPMENT LLC | 282085 | 11378 | 362 |
2017 | R E GAS DEVELOPMENT LLC | 175594 | 5936 | 283 |
2018 | PENNENERGY RESOURCES LLC | 144138 | 6546 | 331 |
2019 | PENNENERGY RESOURCES LLC | 31910 | 827 | 76 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | R E GAS DEVELOPMENT LLC | Brine | 4943 | 120 |
2015 | R E GAS DEVELOPMENT LLC | Brine | 6722 | 352 |
2016 | R E GAS DEVELOPMENT LLC | Brine | 2617 | 362 |
2017 | R E GAS DEVELOPMENT LLC | Brine | 1659 | 283 |
2018 | PENNENERGY RESOURCES LLC | Brine | 24335 | 331 |
2019 | PENNENERGY RESOURCES LLC | Brine | 940 | 76 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1108052402 | 2018-6-27 0:00: | PW | No Violations | 1.50 |
-1364813484 | 2014-10-3 0:00: | CT | No Violations | 1.00 |
-1440346025 | 2017-6-8 0:00:0 | PW | No Violations | |
-1519998986 | 2019-9-6 0:00:0 | PW | No Violations | 1.00 |
-1899264894 | 2018-12-28 0:00 | PW | No Violations | 1.00 |
-1994958143 | 2018-10-29 0:00 | PW | No Violations | 1.00 |
-203267231 | 2017-7-17 0:00: | PW | No Violations | |
-754329040 | 2017-6-21 0:00: | PW | No Violations | |
-813740662 | 2017-7-19 0:00: | PW | No Violations | |
0074794111 | 2017-06-19 | Production Wells | No Violations | I conducted a status check of the site while HAD drilling was setting conductor pipe on the #1H, 2H, & 7H wells. I reviewed the site location according to the simultaneous operations plan submitted by Rex Energy. Sidewinder #62 was anticipated to move on site during the week of 06/12/2017. Cement barricades were in place as per the simultaneous operations plan to isolate all production equipment from drilling operations. I spoke to Andrew Campolongo, field coordinator for Rex, who informed me that the three western condensate tanks had been emptied as per the simultaneous operations plan. No violations were noted at the time of inspection. |
0195151287 | 2019-01-25 | Production Wells | No Violations | I was on site for a compliance notice follow-up for lack of updated identification. Proper identification with the current operator was posted at the time of inspection. No violations were observed at the time of inspection. The compliance notice can be closed. |
0203267231 | 2017-07-17 | Production Wells | No Violations | I conducted a status check of the well while on location to witness the #7H surface cement job. The well is in production, but I did not locate a surface-intermediate annular pressure gauge after my request to Rex Energy to install one. I spoke to Larry Barr, production operator on site and asked a gauge to be installed. He informed me that he will install a gauge by 07/19/2017 |
0565454976 | 2017-05-17 | Production Wells | No Violations | I was on site with DOGRM District Supervisor Stephen Ochs and Emergency Operations and Response Manager Terry Whitehair to meet with R.E Gas Development personnel to discuss a proposed SIMOPS plan. R.E Gas Development proposed drilling three new wells (7H, 2H, and 1H) on the pad while simultaneously producing the #3H, 4H, and 5H wells. We perfumed a walk through of the site with personnel and discussed any possible concerns with the pad with R.E Gas Development personnel who will submit a plan for DOGRM review. |
0754329040 | 2017-06-21 | Production Wells | No Violations | I conducted a status check of the well while on location for the Jenkins #7H intermediate cement job. No changes have been made since my last inspection. I did not locate a surface pressure gauge on the well head, but I contacted Shawn McGuigan of R.E Gas Development to have a gauge installed on the well head on 06/21/2017. |
0813740662 | 2017-07-19 | Production Wells | No Violations | I conducted a status check of the well. The well is in production and Sidewinder #62 was on site drilling the #1H well. A surface-intermediate annular gauge had been installed on the well and the gauge displayed zero psi. No violations were noted at the time of inspection. |
0915041646 | 2017-05-17 | Production Wells | No Violations | I conducted a status check of this well. I did not conduct a preliminary restoration at this time because R.E Gas and Development will be three more wells on the pad during 2017. Identification signs were posted at the access road entrance, the well, and the storage tanks. The #3H well is in production. The well is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence and all man doors were locked.
The equipment on the pad consists of the following: 9 - 400 bbl production tanks, three labelled as containing produced water, and six labelled as containing condensate. 1 Low pressure vertical separator 3 Producing wells 3 Sand separators 3 Gas processing units 1 Heat Treater 1 Vapor Recovery Unit No violations were noted at the time of inspection. |
1072264555 | 2019-8-27 0:00: | PW | No Violations | 0.80 |
1108052402 | 2018-06-27 | Production Wells | No Violations |
I conducted a status check of the well and production pad. Six wells are located on the pad (permit numbers (22734, 22735, 22736, 22452, 224251, 22450). This well is equipped with plunger-lift configuration. The surface-intermediate annulus was equipped pressure relief valve and pressure gauge which displayed a reading of zero psi. Identification was posted at the well and lease entrance. The production tanks and production equipment were surrounded by a lined steel dike. The access road was stable and drivable. Erosional controls appeared to be functioning. Equipment on the pad consisted of the following: Nine 400 bbl production tanks; six labelled as containing condensate and four as containing produced water Six gas processing units with line heaters and vertical separators One combustor unit One vapor recovery unit One oil stabilization unit |
1150949636 | 2014-07-28 | Administrative Inspection | No Violations | I was on location with Electrical Safety Inspector Larry Elasivich (Ohio Dept. of Commerce) and Speelman Electric to accompany Larry during his inspection of the 600 amp, 240 volt electrical service that is installed on this pad. Larry inspected the equipment and approved the power to be turned on. He will contact AEP to let them know that the power can be turned on. No violations. |
1364813484 | 2014-10-03 | Completion Testing | No Violations | I was on location with North Region Supervisor Tom Hill to accompany specialists from the OEPA Division of Air Pollution Control so they could monitor emissions created by these producing operations. There are 3 wells on this pad that have been recently completed and Rex Energy is currently conducting flow-back operations. They are flowing the wells back through temporary separation units, flaring the gas through a large stack, and collecting fluids in steel frac tanks. No violations. |
1397751819 | 2014-04-16 | Casing String Witnessed | No Violations | I was on location to observe the running and cementing of the 13.375 casing. Siderwinder Rig # 63 drilled a 17.5 hole to 1087. Franks Casing Crew ran the 13.375 casing to 1001. Universal Well Services mixed and displaced the cement slurry back to surface. A total of 791 sacks of Type 1, 3% CaCl, 0.2% Foam Check- P, .25 lbs. per sack celloflake comprised the cement slurry. Displacement went 2.5 barrels over the calculated amount at which time the well was shut in to allow the cement to cure. Water temp. was 53 F. , pH was @ 7.0. I observed 35 barrels of cement returned to the surface. No violations were identified at this inspection. |
1422288926 | 2015-01-15 | Production Wells | No Violations | I was on location to conduct a status check of this well. The well is open flow with a wellhead tree assembly. Jersey barriers are installed around the wellhead. The tank battery consists of 9, 400 BBL production tanks and was diked. A windsock was installed on the top of the production tanks. Other production equipment on the well pad consists of:
The production equipment was also diked. Lightening protection was installed on poles around the production equipment. At the time of the inspection, the fresh water impoundment was still in place and located west of the site. The well is properly identified with a clear, legibly marked well identification sign. The lease road is stable and drivable. No violations found. |
1440346025 | 2017-06-08 | Production Wells | No Violations | I was on site to check the status of pad modification in anticipation of drilling three more wells on the pad. The pad had been widened to the west as per the plan submitted to DOGRM by R.E Gas Development. and was lined with gravel. No drilling equipment was yet on site. No violations were noted at the time of inspection. |
1498089237 | 2017-06-19 | Production Wells | No Violations | I conducted a status check of the well while on location for the surface casing cement job on the Jenkins #7H well. The well is in production. Barricades were installed around the production area, with additional barricades around the well head. I did not locate a surface annular pressure gauge on the well. I will contact Rex Energy to have one installed. |
1762532993 | 2017-05-25 | Production Wells | No Violations | I was on site with DOGRM Regional Supervisor Tom Hill, Deputy Chief Bob Worstall, and Emergency Operations and Response Manager Terry Whitehair to meet with R.E Gas Development personnel to discuss a proposed SIMOPS plan. R.E Gas Development proposed drilling three new wells (7H, 2H, and 1H) on the pad while simultaneously producing the #3H, 4H, and 5H wells. We performed a walk around of the site with personnel and discussed any possible concerns with the pad and original proposal with R.E Gas Development personnel who will submit a plan revised plan for DOGRM review. |
1807188749 | 2020-4-2 0:00:0 | PL | No Violations | 1.00 |
1899264894 | 2018-12-28 | Production Wells | Violations Noted | I was on site for a status check with DOGRM John Fleming and Regional Supervisor Tom Hill. The well was equipped with a plunger-lift assembly. The surface/intermediate annular gauge displayed a reading of zero psi. Identification posted at the access and well did not list the current owner of PennEnergy Resources. Records indicate that ownership of the well was transferred from R.E. Gas Development LLC to PennEnergy Resources on 10/03/2018. Per OAC: 9-9-05, any changes of ownership shall be shown on posted identification no later than sixty days after the date of transfer. The owner shall posted current identification to well and tank battery by 01/14/2019. |
195151287 | 2019-1-25 0:00: | PW | No Violations | |
1994958143 | 2018-10-29 | Production Wells | No Violations | No changes have been made to the production equipment since my last inspection. I performed a walk-around inspection of the pad and erosional controls appeared in place and functioning. The well was equipped with an open-flow assembly. The surface/intermediate annular gauge displayed a reading of zero psi, and the intermediate/production displayed approximately 500 psi. |
565454976 | 2017-5-17 0:00: | PW | No Violations | 3.00 |
74794111 | 2017-6-19 0:00: | PW | No Violations | |
915041646 | 2017-5-17 0:00: | PW | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1899264894 | US-OH-119085 | 2019-03-05 | 9-9-05(A)10 | Failure to legibly identify well |
For data sources see[10]