If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22488 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.5,"lon":-81.05,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Lee Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000732 | |
Farm/Lease Name: BRYAN SHAW 21-13-5 | |
License Status: Producing | |
License Date: 2013-09-06 | |
Spud Date: 2013-09-07 | |
Spud Drilling Contractor: NABORS DRILLING | |
Final Drill Date: 2013-11-17 | |
Well Total Depth: 15135.00 ft | |
Configuration: Horizontal | |
Latitude: 40.500000 | |
Longitude: -81.050000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-09-06 | Proposed Formations:POINT PLEASANT, Issued Date:9/6/2013, Expired Date:9/6/2015 12:00:00 PM, Drilling unit acres:571.74, Proposed Well Type:OG, Proposed Well Class:EOUT |
Correction to Well | 2013-09-27 | CORRECTION TO LEASE NAME. |
Reached Total Depth | 2013-11-17 | |
Correction to Well | 2014-02-28 | CORRECTION TO TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2014-10-10 | |
Construction Permit Expires | 2015-09-06 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-09-24 | 8092 | 14914 | 750 |
8092 | 14914 | 750 | |
8092 | 14914 | 750 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/13/2014 | 05/17/2014 | 7954 | 5,653,410.0 | 471639 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 80.9952 | 0 |
A264, B244, B317, J218, J475, J580,
J609, J610, L058, Acid, Hydrochloric 15pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppnat - Natural | Sodium sulfate | 7757-82-6 | 0 | 0.00007000 | 0 | |
Urea | 57-13-6 | 0 | 0.00032 | 0 | ||||
Decamethyl cyclopentasiloxane | 541-02-6 | 0 | 0 | 0 | ||||
2-propenamid | 79-06-1 | 0 | 0.00002000 | 0 | ||||
Tetrasodium ethylenediaminetetraacetate | 64-02-8 | 0 | 0.00001000 | 0 | ||||
Non-crystalline silica | 7631-86-9 | 0 | 0.00028 | 0 | ||||
Ammonium sulfate | 7783-20-2 | 0.04 | 0.00661 | 0 | ||||
Potassium borate | 1332-77-0 | 0.12 | 0.01895 | 0 | ||||
Glutaraldehyde | 111-30-8 | 0.03 | 0.00537 | 0 | ||||
poly(tetrafluoroethylene) | 9002-84-0 | 0 | 0.00001000 | 0 | ||||
Glycerol | 56-81-5 | 0.04 | 0.00618 | 0 | ||||
Copper(II) sulfate | 7758-98-7 | 0 | 0 | 0 | ||||
Trisodium ortho phosphate | 7601-54-9 | 0 | 0.00074 | 0 | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 0 | 0 | 0 | ||||
Dodecamethylcyclohexasiloxane | 540-97-6 | 0 | 0 | 0 | ||||
Prop-2-yn-1-ol | 107-19-7 | 0 | 0.00013 | 0 | ||||
Methanol | 67-56-1 | 0 | 0.00071 | 0 | ||||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 0 | 0.00064 | 0 | ||||
Magnesium silicate hydrate (talc) | 14807-96-6 | 0 | 0.00002000 | 0 | ||||
Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen
phosphate), sodium salt |
68171-29-9 | 0.01 | 0.00168 | 0 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0 | 0.00052 | 0 | ||||
Alkenes, C>10 a- | 64743-02-8 | 0 | 0.00009000 | 0 | ||||
Dimethyl siloxanes and silicones | 63148-62-9 | 0 | 0 | 0 | ||||
Potassium hydroxide | 1310-58-3 | 0.04 | 0.007 | 0 | ||||
Sodium erythorbate | 6381-77-7 | 0 | 0.00071 | 0 | ||||
Thiourea, polymer with formaldehyde and 1-phenylethanone | 68527-49-1 | 0 | 0.00043 | 0 | ||||
Guar gum | 9000-30-0 | 0.49 | 0.07764 | 0 | ||||
Acrylamide, 2-acrylamido-2-methylpropanesulfonic
acid, sodium salt polymer |
38193-60-1 | 0.03 | 0.00488 | 0 | ||||
Ethane-1,2-diol | 107-21-1 | 0 | 0.00021 | 0 | ||||
Alcohols, C14-15, ethoxylated (7EO) | 68951-67-7 | 0 | 0.0002 | 0 | ||||
Polymer of 2-acrylamido-2-methylpropanesulfonic
acid sodium salt and methyl acrylate |
136793-29-8 | 0 | 0.00052 | 0 | ||||
Crystalline silica | 14808-60-7 | 97.78 | 15.5323 | 0 | ||||
Diammonium peroxidisulphate | 7727-54-0 | 0.02 | 0.00344 | 0 | ||||
Hydrogen chloride | 7647-01-0 | 1.4 | 0.22293 | 0 | ||||
Siloxanes and Silicones, di-Me,
reaction products with silica |
67762-90-7 | 0 | 0 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 2.69468 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-05-13 | H2O | 15 | 2700 Bbl | 333420 | Schlumberger | STAGE 1/25
30 SHOTS STAGES 2-24 SEE IMAGES |
2014-05-17 | H2O | 15 | 3161 Bbl | 339000 | Schlumberger | STAGE 25/25
30 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | 270972 | 18173 | 117 |
2015 | CHESAPEAKE EXPLORATION LLC | 860123 | 22504 | 365 |
2016 | CHESAPEAKE EXPLORATION LLC | 455300 | 7965 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 333767 | 4324 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 269547 | 3069 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 59652 | 678 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 7658 | 117 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 11768 | 365 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 3337 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 3371 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 3041 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 750 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1729200972 | 2015-10-23 0:00 | PL | No Violations | |
-1839835327 | 2018-11-1 0:00: | PW | No Violations | 0.90 |
-1942452899 | 2018-11-1 0:00: | PW | No Violations | 0.90 |
-947964215 | 2013-12-3 0:00: | DD | No Violations | |
0947964215 | 2013-12-03 | Drill / Deepen / Reopen | No Violations | I was on location to check the status of Nomac Rig #74. The rig reached a total measured depth of 15,509 on 12/2/2013 and ran and cemented 5.5 production casing. I picked up the cement ticket from the company trailer. They are currently rigging down and will be moving Nomac #74 to the Lafferty pad. No violations. |
1211379902 | 2013-11-25 | Drill / Deepen / Reopen | No Violations | I was on location to inspect drilling operations of Nomac Rig #74. The rig is drilling at a measured depth of 7,042 and building the curve for the lateral section of the well. All equipment is on containment and all drilling fluids are being contained in steel tanks. This is the sixth well drilled on this pad. No violations. |
1626069935 | 2013-11-22 | Drill / Deepen / Reopen | No Violations | I was on location with inspector Kevin Perry to inspect drilling operations of Nomac Rig #74. They are currently servicing the rig and preparing to drill the 8.75 production casing hole. All equipment is on containment. No violations. |
1712517196 | 2018-11-01 | Production Wells | No Violations | The well was equipped with a plunger-lift assembly. The surface/intermediate annular gauge displayed zero psi, and the intermediate/production annular gauge displayed 430 psi. I performed a walk-around inspection of the pad and erosional controls appeared functioning. No violations were observed at the time of inspection. |
1729200972 | 2015-10-23 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of eight, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:
|
1839835327 | 2018-11-01 | Production Wells | No Violations | The well was equipped with a plunger-lift assembly. The surface/intermediate and intermediate/production annular gauges displayed zero psi. I performed a walk-around inspection of the pad and erosional controls appeared functioning. No violations were observed at the time of inspection. |
1873387386 | 2016-03-01 | Production Wells | No Violations | I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road gate was in good repair, but was not locked. The #8H X well is in production. The well is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence. The man gates were not locked, but third party personnel were on site at the time of inspection.
The equipment on the pad consists of the following: 8 - 400 bbl production tanks, three labelled as containing produced water and five labelled as containing condensate, with one low-pressure vertical separator located inside of the dike 6 Producing wells 6 Sand separators 6 Gas Processing Units 1 Heat Treater 1 Vapor Recovery Unit |
1942452899 | 2018-11-01 | Production Wells | No Violations | The well was equipped with a plunger-lift assembly. The surface/intermediate and intermediate/production annular gauges displayed zero psi. I performed a walk-around inspection of the pad and erosional controls appeared functioning. No violations were observed at the time of inspection. |
For data sources see[10]