If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22489 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.5,"lon":-81.05,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Lee Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000732 | |
Farm/Lease Name: BRYAN SHAW 21-13-5 | |
License Status: Producing | |
License Date: 2013-09-06 | |
Spud Date: 2013-09-19 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-10-02 | |
Well Total Depth: 13021.00 ft | |
Configuration: Horizontal | |
Latitude: 40.500000 | |
Longitude: -81.050000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-09-06 | Proposed Formations:POINT PLEASANT, Issued Date:9/6/2013, Expired Date:9/6/2015 12:00:00 PM, Drilling unit acres:419.97, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2013-10-02 | |
Correction to Well | 2014-02-28 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2014-10-06 | |
Correction to Well | 2014-12-05 | CORRECTION TO TAKE-POINT X COORDINATE AND FOOTAGE FROM AS DRILLED SURVEY PLAT. |
Construction Permit Expires | 2015-09-06 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-09-24 | 12583 | 12810 | 426 |
12583 | 12810 | 426 | |
12583 | 12810 | 426 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/26/2014 | 05/29/2014 | 7895 | 3,997,430.0 | 323398 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 84.2414 | 0 |
A264, B244, B317, J218, J475, J580,
J609, L058, Acid, Hydrochloric 15pct, 100 Mesh Sand, Self-Suspending Proppant |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural, Proppant - Resin Coated | Ammonium Persulfate | 007727-54-0 | 100 | 0.00008000 | 0 | |
Ammonium Sulfate | 007783-20-2 | 30 | 0.01563 | 0 | ||||
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00021 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 5 | 0.00063 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 99 | 9.99254 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 40 | 0.00083 | 0 | ||||
Glutaraldehyde (Pentanediol) | 000111-30-8 | 25 | 0.00539 | 0 | ||||
Aliphatic alcohols, ethoxylated # 1 | NA | 30 | 0.00062 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 4.20808 | 0 | ||||
Proprietary Water-Soluble Polymer | TRADE SECRET | 3 | 0.3028 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00821 | 0 | ||||
Aliphatic amine polymer | NA | 30 | 0.01563 | 0 | ||||
Sodium Erythorbate | 006381-77-7 | 100 | 0.00067 | 0 | ||||
Carbohydrate polymer | NA | 100 | 0.00127 | 0 | ||||
Aliphatic acid | NA | 30 | 0.00062 | 0 | ||||
Trisodium Ortho Phosphate | 007601-54-9 | 5 | 0.00063 | 0 | ||||
Hydrogen Chloride | 007647-01-0 | 15 | 0.18126 | 0 | ||||
Water | 007732-18-5 | 85 | 1.02715 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-05-26 | H2O | 15 | 3809 Bbl | 337421 | Schlumberger | STAGE 1/17
36 SHOTS STAGES 2-16 SEE IMAGES |
2014-05-29 | H2O | 15 | 3144 Bbl | 327101 | Schlumberger | STAGE 17/17
30 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | 260132 | 17783 | 126 |
2015 | CHESAPEAKE EXPLORATION LLC | 532646 | 20053 | 364 |
2016 | CHESAPEAKE EXPLORATION LLC | 304031 | 8305 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 222758 | 4740 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 176301 | 3021 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 38788 | 694 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 6080 | 126 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 3421 | 364 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 1617 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 1000 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 771 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 269 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1754887927 | 2015-10-23 0:00 | PL | No Violations | |
-776544521 | 2016-3-1 0:00:0 | PW | No Violations | 1.00 |
0776544521 | 2016-03-01 | Production Wells | No Violations | I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road gate was in good repair, but was not locked. The #3H-X well is in production. The well is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence. The man gates were not locked, but third party personnel were on site at the time of inspection.
The equipment on the pad consists of the following: 8 - 400 bbl production tanks, three labelled as containing produced water and five labelled as containing condensate, with one low-pressure vertical separator located inside of the dike 6 Producing wells 6 Sand separators 6 Gas Processing Units 1 Heat Treater 1 Vapor Recovery Unit |
1754887927 | 2015-10-23 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of eight, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:
|
For data sources see[10]