If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22498 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.6,"lon":-81.08,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Center Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: US-OH-000805 | |
Farm/Lease Name: GRUNDER | |
License Status: Producing | |
License Date: 2013-09-19 | |
Spud Date: 2013-10-06 | |
Spud Drilling Contractor: SIDEWINDER DRILLING INC | |
Final Drill Date: 2013-11-17 | |
Well Total Depth: 12952.00 ft | |
Configuration: Horizontal | |
Latitude: 40.600000 | |
Longitude: -81.080000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-09-19 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:9/19/2013, Expired Date:9/19/2015 12:00:00 PM, Drilling unit acres:131.4, Proposed Well Type:OG, Proposed Well Class:EOUT |
Correction to Well | 2013-10-04 | WELL NUMBER CHANGED (FROM 2H TO 7H) PER COMPANY REQUEST. |
Correction to Well | 2013-10-11 | WELL NUMBER CHANGED TO 5H PER COMPANY REQUEST. |
Reached Total Depth | 2013-11-17 | WELL NUMBER CHANGED FROM 2H TO 5H PER COMPANY REQUEST (10/04/2013) Rex Energy |
Correction to Well | 2014-02-07 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 634.51 ACRES. |
Completion Report Received | 2014-12-09 | WELL NUMBER CHANGED FROM 2H TO 5H PER COMPANY REQUEST (10/04/2013) Rex Energy |
Construction Permit Expires | 2015-09-19 | WELL NUMBER CHANGED FROM 2H TO 5H PER COMPANY REQUEST (10/04/2013) Rex Energy |
Change of Owner | 2018-10-03 | Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC |
Record Last Modified | 2018-10-03 | WELL NUMBER CHANGED FROM 2H TO 5H PER COMPANY REQUEST (10/04/2013) Rex Energy |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/24/2014 | 04/22/2014 | 7626 | 7,553,490.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | WGA-7 SLR | PFP | Gel | Guar Gum | 9000-30-0 | 50 | 0.00996 | 0 |
Surfactant | 154518-36-2 | 5 | 0.001 | 0 | ||||
Clay | 14808-60-7 | 5 | 0.001 | 0 | ||||
Petroleum Distillate | 64742-47-8 | 55 | 0.01096 | 0 | ||||
Sand | Sargent | Proppant | Silica Sand | 14808-60-7 | 100 | 10.5558 | 0 | |
Unislick ST-50 | CESI Chemical | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.02828 | 0 | |
Water | Rex | Base Fluid | Water | 7732-18-5 | 100 | 88.0883 | 0 | |
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.09126 | 0 | |
AP Breaker | Universal | Gel Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.00016 | 0 | |
TEA Breaker Activator | Sagar Enterprise | Gel Breaker | Triethanolamine | 102-71-6 | 72.5 | 0.00215 | 0 | |
Diethanolamine | 111-42-2 | 13 | 0.00039 | 0 | ||||
Unihib G | Geosafe | Acid Inhibitor | Formaldehyde | 50-00-0 | 1 | 0.00001000 | 0 | |
Thiourea | 62-56-6 | 1 | 0.00001000 | 0 | ||||
Ethoxylated Alcohol | 68002-97-1 | 35 | 0.00018 | 0 | ||||
Short Chained Glycol Ether | 112-34-5 | 60 | 0.00031 | 0 | ||||
Acetophenone | 98-86-2 | 1 | 0.00001000 | 0 | ||||
Methanol | 67-56-1 | 5 | 0.00003000 | 0 | ||||
ScaleHib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00639 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-04-12 | H2O | 8 | 0 | 332500 | Universal Well Services Inc. | STAGE 16
60 SHOTS |
2014-04-01 | H2O | 8 | 0 | 334700 | Universal Well Services Inc. | STAGE 7
60 SHOTS |
2014-04-17 | H2O | 8 | 0 | 334400 | Universal Well Services Inc. | STAGE 20
60 SHOTS |
1934-10-13 | H2O | 8 | 0 | 332900 | Universal Well Services Inc. | STAGE 14
60 SHOTS |
2014-03-24 | H2O | 0 | 0 | 333300 | Universal Well Services Inc. | STAGE 2
60 SHOTS |
2014-04-08 | H2O | 8 | 0 | 335100 | Universal Well Services Inc. | STAGE 13
60 SHOTS |
2014-04-07 | H2O | 8 | 0 | 332100 | Universal Well Services Inc. | STAGE 12
60 SHOTS |
2012-04-10 | H2O | 8 | 0 | 322300 | Universal Well Services Inc. | STAGE 15
60 SHOTS |
2014-04-05 | H2O | 8 | 0 | 336600 | Universal Well Services Inc. | STAGE 10
60 SHOTS |
2014-04-13 | H2O | 8 | 0 | 337500 | Universal Well Services Inc. | STAGE 17
60 SHOTS |
2014-04-14 | H2O | 8 | 0 | 274500 | Universal Well Services Inc. | STAGE 18
60 SHOTS |
2014-03-28 | H2O | 8 | 0 | 333900 | Universal Well Services Inc. | STAGE 4
60 SHOTS |
2014-04-18 | H2O | 8 | 0 | 3348 | Universal Well Services Inc. | STAGE 22
60 SHOTS |
2014-04-22 | H2O | 8 | 0 | 3187 | Universal Well Services Inc. | STAGE 25
60 SHOTS |
2014-04-19 | H2O | 8 | 0 | 336200 | Universal Well Services Inc. | STAGE 23
60 SHOTS |
2014-04-21 | H2O | 8 | 0 | 332300 | Universal Well Services Inc. | STAGE 24
60 SHOTS |
0 | 0 | 0 | ||||
2014-04-02 | H2O | 8 | 0 | 258600 | Universal Well Services Inc. | STAGE 8
60 SHOTS |
2014-04-18 | H2O | 8 | 0 | 3362 | Universal Well Services Inc. | STAGE 21
60 SHOTS |
2014-03-31 | H2O | 8 | 0 | 332100 | Universal Well Services Inc. | STAGE 6
60 SHOTS |
2014-03-26 | H2O | 8 | 0 | 345700 | Universal Well Services Inc. | STAGE 3
60 SHOTS |
2014-03-29 | H2O | 8 | 0 | 335500 | Universal Well Services Inc. | STAGE 5
60 SHOTS |
2014-04-06 | H2O | 8 | 0 | 339800 | Universal Well Services Inc. | STAGE 11
60 SHOTS |
2014-03-16 | H2O | 8 | 0 | 305400 | Universal Well Services Inc. | STAGE 1
60 SHOTS |
2014-04-15 | H2O | 8 | 0 | 336300 | Universal Well Services Inc. | STAGE 19
60 SHOTS |
2014-04-05 | H2O | 8 | 0 | 331100 | Universal Well Services Inc. | STAGE 9
60 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | R E GAS DEVELOPMENT LLC | 212731 | 22340 | 134 |
2015 | R E GAS DEVELOPMENT LLC | 330158 | 18740 | 329 |
2016 | R E GAS DEVELOPMENT LLC | 214819 | 6460 | 309 |
2017 | R E GAS DEVELOPMENT LLC | 173297 | 3838 | 327 |
2018 | PENNENERGY RESOURCES LLC | 96157 | 12740 | 248 |
2019 | PENNENERGY RESOURCES LLC | 26293 | 433 | 61 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | R E GAS DEVELOPMENT LLC | Brine | 5379 | 134 |
2015 | R E GAS DEVELOPMENT LLC | Brine | 9697 | 329 |
2016 | R E GAS DEVELOPMENT LLC | Brine | 4559 | 309 |
2017 | R E GAS DEVELOPMENT LLC | Brine | 3408 | 327 |
2018 | PENNENERGY RESOURCES LLC | Brine | 2181 | 248 |
2019 | PENNENERGY RESOURCES LLC | Brine | 150 | 61 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1628398962 | 2019-10-28 0:00 | PW | No Violations | 0.90 |
-1699496945 | 2020-4-2 0:00:0 | PL | No Violations | 1.00 |
-1918282359 | 2019-8-27 0:00: | SC | No Violations | 0.80 |
-440538593 | 2018-2-22 0:00: | PW | No Violations | 1.00 |
0440538593 | 2018-02-22 | Production Wells | No Violations | I conducted a status check of the pad with DOGRM District Supervisor Stephen Ochs. The surface-intermediate annular gauge displayed a reading of 150 psi, and the intermediate-production annular gauge displayed a reading of zero psi. No violations were observed at the time of inspection. |
1067283055 | 2018-06-27 | Production Wells | No Violations | I conducted a status check of the well and production pad. Seven producing wells are located on the pad (permit numbers (2528, 2530, 2498, 2554, 2486, 2553, 2529). This well is equipped with plunger-lift configuration. The surface-intermediate annulus was equipped with a pressure-relief valve and a pressure gauge which displayed a reading of zero psi. Identification was posted at the well and lease entrance. The production tanks and production equipment were surrounded by a lined steel dike. Less than an inch of standing water was present in areas inside the tank battery. I tested the standing water for chlorides using a low-range QuanTab which concluded in a reading of less than 33 ppm. The access road was stable and drivable. Erosional controls were in place and appeared functioning.
Equipment on the pad consisted of the following: Fifteen 400 bbl production tanks; eight labelled as containing condensate and seven as containing produced water Seven gas processing units with vertical separators Two combustor units Three vapor recovery units One oil stabilization unit and tower |
1137476254 | 2017-06-30 | Production Wells | No Violations | I was on site with DOGRM Tom Hill, Bob Worstall, and Terry Whitehair, along with R.E Gas Development personnel to drilling an additional three wells (PN# 22553, 22732, 22733) on the pad. I performed a walk-around inspection while on site. The well is equipped with a plunger-lift assembly. I was unable to locate a clear surface-intermediate pressure gauge on the well. I spoke to R.E. Gas Development to have a gauge installed on the surface-intermediate annulus and labelled. |
1388674521 | 2013-11-22 | Drill / Deepen / Reopen | No Violations | I was on location with inspector Kevin Perry to inspect drilling operations of Sidewinder Rig #63. They were currently drilling the 8.5 production casing hole and should be cementing casing over the weekend. The rig was on containment and all drilling fluids are contained in steel tanks. No violations. |
1572967231 | 2019-10-24 0:00 | PW | No Violations | 1.00 |
1789979430 | 2019-10-30 0:00 | PW | No Violations | 1.00 |
2062444833 | 2017-06-15 | Production Wells | No Violations | I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road was equipped with a gate and was locked. The #5H well is in production and is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. A sound barrier wall was installed on the north side of the pad.
The equipment on the pad consists of the following: 7 producing wells 7 sand separators 7 gas processing units 1 vapor recovery unit 1 heat treater No violations were noted at the time of inspection. |
For data sources see[9]