Well ID: 34-019-22528 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.6,"lon":-81.08,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Center Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: US-OH-000805 | |
Farm/Lease Name: GRUNDER | |
License Status: Producing | |
License Date: 2013-11-07 | |
Spud Date: 2013-12-07 | |
Spud Drilling Contractor: SIDEWINDER DRILLING INC | |
Final Drill Date: 2014-02-06 | |
Well Total Depth: 13834.00 ft | |
Configuration: Horizontal | |
Latitude: 40.600000 | |
Longitude: -81.080000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-11-07 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/7/2013, Expired Date:11/7/2015 12:00:00 PM, Drilling unit acres:437.64, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2014-02-06 | |
Correction to Well | 2014-02-07 | CHANGE IN TARGET INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 438.07 ACRES. |
Completion Report Received | 2014-12-08 | |
Correction to Well | 2015-01-16 | UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM NEW PLAT. UNIT SIZE INCREASED TO 634.51 ACRES. |
Construction Permit Expires | 2015-11-07 | |
Change of Owner | 2018-10-03 | Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC |
Record Last Modified | 2018-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-08-25 | 8813 | 13811 | 0 |
8813 | 13811 | 0 | |
8813 | 13811 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/26/2014 | 04/22/2014 | 7623 | 7,830,020.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand | Sargent | Proppant | Silica Sand | 14808-60-7 | 100 | 10.9491 | 0 |
ScaleHib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.0064 | 0 | |
Water | Rex | Base Fluid | Water | 7732-18-5 | 100 | 87.6873 | 0 | |
AP Breaker | Universal | Gel Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.00026 | 0 | |
EC6116A | Nalco | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00001000 | 0 | |
Polyethylene Glycol | 25322-68-3 | 60 | 0.00002000 | 0 | ||||
Unislick ST-50 | CESI Chemical | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.02863 | 0 | |
TEA Breaker Activator | Sagar Enterprise | Gel Breaker | Triethanolamine | 102-71-6 | 72.5 | 0.00327 | 0 | |
Diethanolamine | 111-42-2 | 13 | 0.00059 | 0 | ||||
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.09089 | 0 | |
WGA-7 SLR | PFP | Gel | Clay | 14808-60-7 | 5 | 0.00148 | 0 | |
Surfactant | 154518-36-2 | 5 | 0.00148 | 0 | ||||
Petroleum Distillate | 64742-47-8 | 55 | 0.0163 | 0 | ||||
Guar Gum | 9000-30-0 | 50 | 0.01482 | 0 | ||||
Unihib G | Geosafe | Acid Inhibitor | Short Chained Glycol Ether | 112-34-5 | 60 | 0.00031 | 0 | |
Ethoxylated Alcohol | 68002-97-1 | 35 | 0.00018 | 0 | ||||
Thiourea | 62-56-6 | 1 | 0.00001000 | 0 | ||||
Methanol | 67-56-1 | 5 | 0.00003000 | 0 | ||||
Acetophenone | 98-86-2 | 1 | 0.00001000 | 0 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001000 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-04-14 | H2O | 8 | 0 | 269700 | Universal Well Services Inc. | STAGE 17
60 SHOTS |
2014-04-18 | H2O | 8 | 0 | 331100 | Universal Well Services Inc. | STAGE 21
60 SHOTS |
2014-04-20 | H2O | 8 | 0 | 33500 | Universal Well Services Inc. | STAGE 23
60 SHOTS |
2014-03-29 | H2O | 8 | 0 | 334900 | Universal Well Services Inc. | STAGE 4
60 SHOTS |
2014-04-11 | H2O | 8 | 0 | 337300 | Universal Well Services Inc. | STAGE 14
60 SHOTS |
2014-04-08 | H2O | 8 | 0 | 333100 | Universal Well Services Inc. | STAGE 12
60 SHOTS |
2014-03-30 | H2O | 8 | 0 | 335900 | Universal Well Services Inc. | STAGE 5
60 SHOTS |
2014-04-13 | H2O | 8 | 0 | 338300 | Universal Well Services Inc. | STAGE 16
60 SHOTS |
2014-04-06 | H2O | 8 | 0 | 337900 | Universal Well Services Inc. | STAGE 10
60 SHOTS |
2014-04-09 | H2O | 8 | 0 | 324500 | Universal Well Services Inc. | STAGE 13
60 SHOTS |
2014-04-12 | H2O | 8 | 0 | 340800 | Universal Well Services Inc. | STAGE 15
60 SHOTS |
2014-03-27 | H2O | 8 | 0 | 343900 | Universal Well Services Inc. | STAGE 3
60 SHOTS |
2014-04-21 | H2O | 8 | 0 | 334200 | Universal Well Services Inc. | STAGE 24
60 SHOTS |
2014-04-19 | H2O | 8 | 0 | 332500 | Universal Well Services Inc. | STAGE 22
60 SHOTS |
2014-04-15 | H2O | 8 | 0 | 326900 | Universal Well Services Inc. | STAGE 18
60 SHOTS |
2014-04-03 | H2O | 8 | 0 | 314800 | Universal Well Services Inc. | STAGE 8
60 SHOTS |
2014-03-16 | H2O | 8 | 0 | 238600 | Universal Well Services Inc. | STAGE 1
60 SHOTS |
2014-04-17 | H2O | 8 | 0 | 338000 | Universal Well Services Inc. | STAGE 20
60 SHOTS |
2014-04-16 | H2O | 8 | 0 | 244900 | Universal Well Services Inc. | STAGE 19
60 SHOTS |
2014-04-01 | H2O | 8 | 0 | 335000 | Universal Well Services Inc. | STAGE 6
60 SHOTS |
2014-04-07 | H2O | 8 | 0 | 335600 | Universal Well Services Inc. | STAGE 11
60 SHOTS |
2014-04-04 | H2O | 8 | 0 | 308500 | Universal Well Services Inc. | STAGE 9
60 SHOTS |
2014-04-22 | H2O | 8 | 0 | 327500 | Universal Well Services Inc. | STAGE 25
60 SHOTS |
2014-04-02 | H2O | 8 | 0 | 332400 | Universal Well Services Inc. | STAGE 7
60 SHOTS |
2014-03-26 | H2O | 8 | 0 | 298600 | Universal Well Services Inc. | STAGE 2
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | R E GAS DEVELOPMENT LLC | 188411 | 20982 | 134 |
2015 | R E GAS DEVELOPMENT LLC | 342265 | 26251 | 328 |
2016 | R E GAS DEVELOPMENT LLC | 236440 | 11311 | 298 |
2017 | R E GAS DEVELOPMENT LLC | 218111 | 7667 | 349 |
2018 | PENNENERGY RESOURCES LLC | 162570 | 9855 | 317 |
2019 | PENNENERGY RESOURCES LLC | 36327 | 1040 | 80 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | R E GAS DEVELOPMENT LLC | Brine | 5379 | 134 |
2015 | R E GAS DEVELOPMENT LLC | Brine | 12115 | 328 |
2016 | R E GAS DEVELOPMENT LLC | Brine | 6065 | 298 |
2017 | R E GAS DEVELOPMENT LLC | Brine | 4740 | 349 |
2018 | PENNENERGY RESOURCES LLC | Brine | 3360 | 317 |
2019 | PENNENERGY RESOURCES LLC | Brine | 225 | 80 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1058916315 | 2019-8-27 0:00: | PW | No Violations | 0.80 |
-1536384970 | 2014-10-3 0:00: | PW | No Violations | 2.00 |
-1567599786 | 2018-2-22 0:00: | PW | No Violations | 1.00 |
-1848778244 | 2017-6-29 0:00: | PW | No Violations | |
-1935610897 | 2013-12-8 0:00: | DD | No Violations | 4.50 |
-46882335 | 2019-10-28 0:00 | PW | No Violations | 0.90 |
0212997946 | 2018-06-27 | Production Wells | No Violations | I conducted a status check of the well and production pad. Seven producing wells are located on the pad (permit numbers (2528, 2530, 2498, 2554, 2486, 2553, 2529). This well is equipped with plunger-lift configuration. The surface-intermediate annulus was equipped with a pressure-relief valve and a pressure gauge which displayed a reading of zero psi. Identification was posted at the well and lease entrance. The production tanks and production equipment were surrounded by a lined steel dike. Less than an inch of standing water was present in areas inside the tank battery. I tested the standing water for chlorides using a low-range QuanTab which concluded in a reading of less than 33 ppm. The access road was stable and drivable. Erosional controls were in place and appeared functioning.
Equipment on the pad consisted of the following: Fifteen 400 bbl production tanks; eight labelled as containing condensate and seven as containing produced water Seven gas processing units with vertical separators Two combustor units Three vapor recovery units One oil stabilization unit and tower |
0832315598 | 2017-06-15 | Production Wells | No Violations | rtI conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road was equipped with a gate and was locked. The #6H well is in production and is equipped with a plunger lift assembly open flow assembly. The production tanks are surrounded by a steel dike. A sound barrier wall was installed on the north sisde of the pad.
The equipment on the pad consists of the following: 7 producing wells 7 sand separators 7 gas processing units 1 vapor recovery unit 1 heat treater No violations were noted at the time of inspection. |
1390530150 | 2014-01-22 | Drill / Deepen / Reopen | No Violations | I was on site to witness the cementing of the 13 3/8 inch surface casing. My inspection revealed that Sidewinder Drilling Rig # 63 has drilled a 17 1/2 inch hole to a total depth of 1015 feet and ran 1005 feet of 13 3/8 inch surface casing (54.5 pounds per foot / inside diameter 12.615 inches). They installed 8 spiral solid body centralizers on the casing string (on joints 1,3,7,11,15,19,23, and 25). Universal cemented the surface casing with 794 sacks of Type 1 cement with 3% CaCl, 0.2% defoamer, and 1/4 pound per sack lost circulation material. The cement had a density of 15.6 pounds per gallon, a yield of 1.2 cubic feet per sack, and they used 5.2 gallons of mix water per sack. Universal pumped 169 barrels of cement slurry, 150 barrels of displacement, and there was 25 barrels of cement returns to surface. They bumped the plug at 02:13 pm with 495 PSI and then bumped the pressure up to 1025 for the casing test. The casing test was approved at this time and the floats held when the pressure was released. My inspection revealed no violations at this time. |
1390915021 | 2014-01-28 | Drill / Deepen / Reopen | No Violations | I was on site to witness the cementing of the 9 5/8 inch intermediate casing. My inspection revealed that Sidewinder Rig # 63 has drilled a 12 1/4 inch hole to a total depth of 2305 feet and ran 2295 feet of 9 5/8 inch intermediate casing (40 pounds per foot / inside diameter 8.835 inches). They installed 20 spiral solid body centralizers on the casing string, on joints 1,2,6,10,14,18,22,26,30,34,38,42,46,50,54, 58,62,66,70, and 74. Universal cemented the casing with 705 sacks of Thixotropic cement with 5% W-60, 10% Salt, 2% CaCl, and 0.15% CR3. They pumped 162 barrels of cement slurry, 165 barrels of displacement, and there was 25 barrels of cement returns to surface. They didnt bump the plug because the wiper plug stayed in the Blackhawk cement head. They pumped 165 barrels of displacement out of the 171 barrels of calculated displacement. They finished pumping at 11:15 am, held pressure on the casing for 5 minutes and the floats held after the pressure was released. My inspection revealed no violations at this time. |
1536384970 | 2014-10-03 | Production Wells | No Violations | I was on location with North Region Supervisor Tom Hill to accompany specialists from the OEPA Division of Air Pollution Control so they could monitor emissions created by these producing operations. This location has 6 producing wells and 15-400 barrel tanks in containment. Rex Energy Production Foreman, Paul Arblaster, was on location and explained the producing operations. There is currently no ID signage posted at the wellheads or at the tank battery as required. Tom Hill asked Paul to get them posted immediately and install annular gauges on all of the wellheads. I will check back later to see if the IDs are posted and that the gauges have been installed. |
1548958644 | 2019-01-31 | Production Wells | No Violations | The well was equipped with a plunger-lift assembly. The surface/intermediate annular gauge displayed zero psi, and the intermediate/production annular gauge displayed 100 psi. The well was recently transferred to PennEnergy Resources LLC, and updated identification was posted. No violations were observed at the time of inspection. |
1567599786 | 2018-02-22 | Production Wells | No Violations | I conducted a status check of the pad with DOGRM District Supervisor Stephen Ochs. The surface-intermediateannular gauge displayed a reading of 200 psi, and the intermediate-production annular gauges displayed a reading of zero psi. No violations were observed at the time of inspection. |
1848778244 | 2017-06-29 | Production Wells | No Violations | I was on site with DOGRM Tom Hill, Bob Worstall, and Terry Whitehair, along with R.E Gas Development personnel to drilling an additional three wells (PN# 22553, 22732, 22733) on the pad. I performed a walk-around inspection while on site. The well is equipped with a plunger-lift assembly. I was unable to locate a clear surface-intermediate pressure gauge on the well. I spoke to R.E. Gas Development to have a gauge installed on the surface-intermediate annulus and labelled. |
1926233913 | 2020-4-2 0:00:0 | PL | No Violations | 1.00 |
1935610897 | 2013-12-08 | Drill / Deepen / Reopen | No Violations | I was on site to witness the cementing of the 20 inch conductor casing. My inspection revealed that Rocky Mountain Drilling has drilled a 26 inch hole to a total depth of 110 feet and ran 110 feet of 20 inch conductor casing (78 pounds per foot / inside diameter 19.25 inches). Allied cement the casing with 200 sacks of Class A 2% CaCl and 1/4 pound per sack floseal. The cement had a density of 15.6 pounds per gallon, a yield of 1.18 cubic feet per sack, and they used 5.23 gallons of mix water per sack. Allied pumped 42 barrels of cement slurry, 37 barrels of displacement, and there was 8 barrels of cement returns to surface. My inspection revealed no violations at this time. |
212997946 | 2018-6-27 0:00: | PW | No Violations | 2.00 |
832315598 | 2017-6-15 0:00: | PW | No Violations |