If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22542 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.44,"lon":-80.96,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Loudon Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000339 | |
Farm/Lease Name: LUCAS 35-11-4 | |
License Status: Producing | |
License Date: 2013-11-18 | |
Spud Date: 2013-11-18 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-12-08 | |
Well Total Depth: 13164.00 ft | |
Configuration: Horizontal | |
Latitude: 40.440000 | |
Longitude: -80.960000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-11-18 | Proposed Formations:POINT PLEASANT, Issued Date:11/18/2013, Expired Date:11/18/2015 12:00:00 PM, Drilling unit acres:382.24, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-12-08 | |
Correction to Well | 2014-07-03 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2014-10-08 | |
Correction to Well | 2015-01-23 | UPDATE TO TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM NEWLY SUBMITTED PLAT. |
Construction Permit Expires | 2015-11-18 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-10-09 | 8568 | 12960 | 426 |
8568 | 12960 | 426 | |
8568 | 12960 | 426 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/21/2014 | 06/27/2014 | 8317 | 3,655,680.0 | 290933 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 84.2364 | 0 |
GBW-5 | BAKER HUGHES | Breaker | Ammonium Persulfate | 007727-54-0 | 100 | 0.00275 | 0 | |
GW-3LDF | BAKER HUGHES | Gelling Agent | Polysaccharide Blend | NA | 60 | 0.12663 | 0 | |
Petroleum Distillate Blend | NA | 60 | 0.12663 | 0 | ||||
CI-14 | BAKER HUGHES | Corrosion Inhibitor | Propargyl Alcohol (2-Propynol) | 000107-19-7 | 5 | 0.00008000 | 0 | |
Methanol (Methyl Alcohol) | 000067-56-1 | 68 | 0.00104 | 0 | ||||
HCL 5.1 - 7.5 | BAKER HUGHES | Acid | Water | 007732-18-5 | 93 | 0.84235 | 0 | |
Hydrochloric Acid | 007647-01-0 | 8 | 0.0683 | 0 | ||||
BF-9L, CI-14, ENZYME G-NE, FERROTROL
300L, FRW-18, GW-3LDF, SCALETROL 720 |
BAKER HUGHES | Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Iron Control Agent, pH Adjusting Agent, Scale Inhibitor | Proprietary Biocide | TRADE SECRET | 0 | 0.00178 | 0 | |
Proprietary Silica | TRADE SECRET | 0 | 0.17265 | 0 | ||||
Water | 007732-18-5 | 0 | 0.30143 | 0 | ||||
Hemicellulase Enzyme Concentrate | 009025-56-3 | 0 | 0.03935 | 0 | ||||
Proprietary Acid | TRADE SECRET | 0 | 0.00178 | 0 | ||||
Proprietary Copolymer | TRADE SECRET | 0 | 0.00178 | 0 | ||||
Proprietary Solvent | TRADE SECRET | 0 | 0.17265 | 0 | ||||
Proprietary Surfactant | TRADE SECRET | 0 | 0.00178 | 0 | ||||
Proprietary Polymer | TRADE SECRET | 0 | 0.06055 | 0 | ||||
Proprietary Disinfectant | TRADE SECRET | 0 | 0.17265 | 0 | ||||
Calcium Chloride | 010043-52-4 | 0 | 0.01769 | 0 | ||||
Proprietary Alcohol | TRADE SECRET | 0 | 0.17265 | 0 | ||||
Proprietary Weak Acid | TRADE SECRET | 0 | 0.17265 | 0 | ||||
BF-9L | BAKER HUGHES | pH Adjusting Agent | Potassium Hydroxide | 001310-58-3 | 15 | 0.00819 | 0 | |
Northern White Sand | BAKER HUGHES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 9.88672 | 0 | |
FRW-18 | BAKER HUGHES | Friction Reducer | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 30 | 0.01172 | 0 | |
SCALETROL 720 | BAKER HUGHES | Scale Inhibitor | Diethylene Glycol | 000111-46-6 | 5 | 0.00076 | 0 | |
Ethylene Glycol | 000107-21-1 | 35 | 0.0053 | 0 | ||||
100 Mesh Sand | BAKER HUGHES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 4.54299 | 0 | |
ALPHA 1427 | BAKER HUGHES | Anti-Bacterial Agent | Glutaraldehyde (Pentanediol) | 000111-30-8 | 30 | 0.00566 | 0 | |
Ethanol | 000064-17-5 | 5 | 0.00094 | 0 | ||||
Quaternary Ammonium Compound | 068424-85-1 | 7 | 0.00132 | 0 | ||||
Didecyl Dimethyl Ammonium Chloride | 007173-51-5 | 10 | 0.00189 | 0 | ||||
Water | 007732-18-5 | 60 | 0.01132 | 0 | ||||
XLW-32 | BAKER HUGHES | Cross Linker | Methanol (Methyl Alcohol) | 000067-56-1 | 90 | 0.03723 | 0 | |
Boric Acid | 010043-35-3 | 20 | 0.00827 | 0 | ||||
ENZYME G-NE | BAKER HUGHES | Breaker | No Hazardous Components | NA | 0 | 0 | 0 | |
FERROTROL 300L | BAKER HUGHES | Iron Control Agent | Citric Acid | 000077-92-9 | 50 | 0.00263 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-06-27 | H2O | 15 | 1728 Bbl | 440960 | BAKER-HUGHES | STAGE 12/12
36 SHOTS |
2014-06-21 | H2O | 15 | 2355 Bbl | 432916 | BAKER-HUGHES | STAGE 1/12
30 SHOTS STAGES 2-11 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | 395399 | 453 | 130 |
2015 | CHESAPEAKE EXPLORATION LLC | 921823 | 87 | 271 |
2016 | CHESAPEAKE EXPLORATION LLC | 772773 | 7 | 346 |
2017 | CHESAPEAKE EXPLORATION LLC | 452245 | 14 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 307497 | 29 | 364 |
2019 | CHESAPEAKE EXPLORATION LLC | 66831 | 8 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 9160 | 130 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 2632 | 271 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 2146 | 346 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 1292 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 822 | 364 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 225 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1777014807 | 2015-11-9 0:00: | PL | No Violations | |
-1919627945 | 2013-12-1 0:00: | DD | No Violations | |
1386167918 | 2013-12-03 | Drill / Deepen / Reopen | No Violations | I went to the site to witness the cementing of the intermediate casing. The drilling contractor, Nomac Rig # 73 , drilled a 12.25 diameter hole to 1918. There were no issues while drilling the intermediate hole. 9.625 OD casing was set at 1909 KB. A total of 15 centralizers were installed on the intermediate casing string. O-Tex was the cementing contractor. There was good fluid circulation throughout the cementing operation. O-Tex adjusted the cement density, and pumped 151 bbls of cement slurry at 15.6 ppg. Cement returns to the surface were observed. An estimated 33 bbls of cement returned to the surface. The plug was displaced with 138 bbls of water. The plug landed and was pressured up on. The float held when the pressure was released. 1.0 bbls of water bled back. |
1777014807 | 2015-11-09 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of six, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:
|
1919627945 | 2013-12-01 | Drill / Deepen / Reopen | No Violations | I was notified about the cementing of the surface casing by Inspecor Mike Dinsmore. The drilling contractor, Nomac Rig # 73, drilled a 17.5 diameter hole to 590. There were no issues while drilling the surface hole. 13.375 OD casing was set at 582 KB. A total of 5 centralizers were installed on the surface casing string. O-Tex was the cementing contractor. I was informed that there was good fluid circulation throughout the cementing operation. O-Tex pumped 115 bbls of cement slurry at 15.6 ppg. An estimated 23 bbls of cement returned to the surface. The cement was displaced with 82 bbls of water. |
For data sources see[10]