X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22579

Well Details

Well ID: 34-019-22579
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Perry Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000911
Farm/Lease Name: BAUER 14-14-6
License Status: Producing
License Date: 2014-04-03
Spud Date: 2014-04-27
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-07-01
Well Total Depth: 18116.00 ft
Configuration: Horizontal
Latitude: 40.490000
Longitude: -81.130000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-04-03 Proposed Formations:POINT PLEASANT, Issued Date:4/3/2014, Expired Date:4/2/2016 12:00:00 PM, Drilling unit acres:459.84, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-07-01
Correction to Well 2014-07-03 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Correction to Well 2015-01-09 UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM NEW PLAT.
Completion Report Received 2015-03-13
Construction Permit Expires 2016-04-02
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-03-13 8974 17913 990
8974 17913 990
8974 17913 990

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/26/2014 10/20/2014 7788 7,389,140.0 595101

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 5.22799 0
A264, B244, B317, J218, J475, J580,

J609, J610, L058, Acid, Hydrochloric 7.5pct, Acid, Hydrochloric 15pct, Northern White Sand, 100 Mesh Sand

SCHLUMBERGER Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural Hydrochloric Acid 007647-01-0 8 0.08496 0
Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00012 0
Ammonium Sulfate 007783-20-2 30 0.0159 0
Aliphatic polyol NA 30 0.01192 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 12.856 0
Trisodium Ortho Phosphate 007601-54-9 5 0.00058 0
Ammonium Persulfate 007727-54-0 100 0.00239 0
Methanol (Methyl Alcohol) 000067-56-1 40 0.00049 0
Ammonium Persulfate 007727-54-0 100 0.0003 0
Potassium Hydroxide 001310-58-3 15 0.00596 0
Aliphatic amine polymer NA 30 0.0159 0
Glutaraldehyde (Pentanediol) 000111-30-8 25 0.00508 0
Aliphatic alcohols, ethoxylated # 1 NA 30 0.00036 0
Sodium Erythorbate 006381-77-7 100 0.00047 0
Carbohydrate polymer NA 100 0.06952 0
Aliphatic acid NA 30 0.00036 0
Water 007732-18-5 93 1.04786 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 1.43449 0
Hydrogen Chloride 007647-01-0 15 0.01103 0
Ethylene Glycol 000107-21-1 5 0.00058 0
Water 007732-18-5 85 0.0625 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 79.0768 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-09-26 H2O 0 2951 Bbl 329320 Schlumberger STAGE 1/33

30 SHOTS STAGES 2-32 SEE IMAGES

2014-10-20 H2O 8 2736 Bbl 329600 Schlumberger STAGE 33/33

30 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 CHESAPEAKE EXPLORATION LLC 340622 60517 194
2016 CHESAPEAKE EXPLORATION LLC 289577 40914 364
2017 CHESAPEAKE EXPLORATION LLC 194660 24263 365
2018 CHESAPEAKE EXPLORATION LLC 154891 18251 365
2019 CHESAPEAKE EXPLORATION LLC 35022 3775 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 CHESAPEAKE EXPLORATION LLC Brine 21593 194
2016 CHESAPEAKE EXPLORATION LLC Brine 8895 364
2017 CHESAPEAKE EXPLORATION LLC Brine 4136 365
2018 CHESAPEAKE EXPLORATION LLC Brine 3687 365
2019 CHESAPEAKE EXPLORATION LLC Brine 789 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1234398146 2014-6-23 0:00: DD No Violations
-186840307 2019-9-9 0:00:0 PW No Violations 1.00
-2130786568 2017-3-15 0:00: PW No Violations
-416053660 2015-10-26 0:00 PL No Violations
0416053660 2015-10-26 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of eight, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

0959249599 2018-11-25 Production Wells No Violations The well was equipped with a plunger-lift assembly. The surface/intermediate and intermediate/production annular gauges displayed zero psi. No equipment changes have been made to the production pad since my last inspection. I performed a walk-around inspection of the pad and erosional controls appeared functioning. No violations were observed at the time of inspection.
1234398146 2014-06-23 Drill / Deepen / Reopen No Violations I was on location for the cementing of the intermediate casing. Nomac Rig 74 drilled a 12.25 Hole #3 to 2,525 from rig floor (KB) and set 9.625 casing to 2,510 KB with 15 centralizers. The rig floor height was 20. The casing had a weight of 40 lbs/ft and rating of J-55. A float shoe and collar was installed on the casing. The float collar was between the second and third joints. Schlumberger rigged up and established circulation with 5 bbls of fresh water. The operator mixed and pumped 25 bbls of a gel spacer, 10 bbls of a water spacer and 197 bbls (900 sacks) of Class A cement with a yield of 1.23 and 15.6 PPG. Next, Schlumberger released the plug and displaced the cement to 2,421 with 183.5 bbls of fresh water. I witnessed 35 bbls of good cement returned to surface. Once the plug landed, O-Tex pressured up from 1,068 psi to 1,579 psi and held static for 5 minutes. Pressure on the plug was release and there was 1 bbl of flow back water.
1403634576 2014-06-21 Drill / Deepen / Reopen No Violations I was on location for the cementing of the surface casing. Nomac Rig 74 drilled a 17.5 Hole #2 to 572 from rig floor (KB) and set 13.375 casing to 557 KB with 5 centralizers. The casing had a weight of 54.5 lbs/ft and rating of J-55. A float shoe and collar was installed onto the casing string. Schlumberger rigged up and established circulation with 5 bbls of fresh water. The operator mixed and pumped 30 bbls of a gel spacer, 10 bbls of a fresh water spacer and 109 bbls (500 sacks) of Class A cement with a yield of 1.22 and 15.6 PPG. Next, Schlumberger released the plug and displaced the cement to 514 with 79.5 bbls of fresh water. I witnessed 25 bbls of good cement returned to surface. Once the plug landed, O-Tex pressured up from 300 to 1300 psi and held static for 5 minutes. Pressure on the plug was release and there was 0.5 bbl of flow back water. Cement samples was taken and weighed at 15.6.
1647443663 2018-11-26 Production Wells No Violations The well was equipped with a plunger lift assembly. The surface-intermediate and intermediate-production annular gauges displayed readings of zero psi. I performed a walk-around inspection of the pad and no violations were observed at the time of inspection.
1897889412 2014-04-27 Drill / Deepen / Reopen No Violations
2130786568 2017-03-15 Production Wells No Violations I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road was equipped with a gate and was locked. The #210H well is in production. The well is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence and all man doors were locked.

The equipment on the pad consists of the following: 4 producing wells

1 Low pressure vertical separator located inside of dike 4 sand separators 4 gas processing units 1 vapor recovery unit 1 heat treater 1 compressor station 2 bullet tanks 1 40,000 bbl open frac tank 1 oil stabilization unit There was approximately four inches of standing water inside of the dike. I tested the standing water with a low-range QuanTab which concluded in a reading of under 30 ppm.

959249599 2018-11-25 0:00 PW No Violations 1.00

For data sources see[10]

References