If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-019-22599 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.49,"lon":-81.02,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Carroll | |
| Municipality: Loudon Township | |
| Operator Name: EAP OHIO LLC | |
| Well Pad ID: US-OH-001372 | |
| Farm/Lease Name: KENNEDY 14-13-5 | |
| License Status: Producing | |
| License Date: 2014-06-25 | |
| Spud Date: 2014-07-19 | |
| Spud Drilling Contractor: NOMAC DRILLING CORP | |
| Final Drill Date: 2014-10-07 | |
| Well Total Depth: 17176.00 ft | |
| Configuration: Horizontal | |
| Latitude: 40.490000 | |
| Longitude: -81.020000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2014-06-18 | Proposed Formations:TRENTON-BLACK RIVER, Issued Date:6/18/2014, Expired Date:6/17/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
| APP | 2014-06-25 | Proposed Formations:POINT PLEASANT, Issued Date:6/25/2014, Expired Date:6/24/2016 12:00:00 PM, Drilling unit acres:602.19, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2014-10-07 | |
| Correction to Well | 2015-02-06 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
| Correction to Well | 2015-07-31 | UPDATE TO TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM NEW PLAT. |
| Completion Report Received | 2015-08-27 | |
| Construction Permit Expires | 2016-06-24 | |
| Record Last Modified | 2017-10-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2015-08-28 | 8624 | 16982 | 0 |
| 8624 | 16982 | 0 | |
| 8624 | 16982 | 0 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 03/21/2015 | 04/05/2015 | 8169 | 8,340,650.0 | 711067 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | ||||||||
| A264, B244, B317, J475, J609, L058,
Self-Suspending Proppant, Acid, Hydrochloric 7.5pct, Acid, Hydrochloric 15pct, 100 Mesh Sand, Northern White Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Friction Reducer, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural | Urea | 57-13-6 | 0.02 | 0.00046 | 0 | |
| Sodium sulfate | 7757-82-6 | 0 | 0.00011 | 0 | ||||
| Tetrasodium ethylenediaminetetraacetate | 64-02-8 | 0 | 0.00001000 | 0 | ||||
| Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen
phosphate), sodium salt |
68171-29-9 | 0.08 | 0.00192 | 0 | ||||
| Diammonium peroxodisulphate | 7727-54-0 | 0.37 | 0.00849 | 0 | ||||
| Hydrochloric acid | 7647-01-0 | 2.45 | 0.05636 | 0 | ||||
| Calcium Chloride | 10043-52-4 | 0.05 | 0.00108 | 0 | ||||
| Quartz, Crystalline silica | 14808-60-7 | 95.82 | 2.20292 | 0 | ||||
| 2-propenamid | 79-06-1 | 0 | 0.00002000 | 0 | ||||
| Silicon Dioxide | 7631-86-9 | 0 | 0.0001 | 0 | ||||
| Octamethylcyclotetrasiloxane | 556-67-2 | 0 | 0 | 0 | ||||
| 1-Octadecene (C18) | 112-88-9 | 0 | 0.00001000 | 0 | ||||
| Ammonium sulfate | 7783-20-2 | 0.41 | 0.00952 | 0 | ||||
| Methanol | 67-56-1 | 0.01 | 0.00021 | 0 | ||||
| Siloxanes and silicones, dimethyl,
reaction products with silica |
67762-90-7 | 0 | 0 | 0 | ||||
| Sodium erythorbate | 6381-77-7 | 0.01 | 0.00026 | 0 | ||||
| Potassium chloride (impurity) | 7447-40-7 | 0 | 0.00003000 | 0 | ||||
| Trisodium ortho phosphate | 7601-54-9 | 0.04 | 0.00084 | 0 | ||||
| Proprietary Water-Soluble Polymer | TRADE SECRET | 3 | 0.44239 | 0 | ||||
| Ethylene Glycol | 107-21-1 | 0.01 | 0.00024 | 0 | ||||
| Decamethyl cyclopentasiloxane | 541-02-6 | 0 | 0 | 0 | ||||
| poly(tetrafluoroethylene) | 9002-84-0 | 0 | 0.00002000 | 0 | ||||
| Fatty acids, tall-oil | 61790-12-3 | 0.01 | 0.00015 | 0 | ||||
| Acrylamide, 2-acrylamido-2-methylpropanesulfonic
acid, sodium salt polymer |
38193-60-1 | 0.31 | 0.00703 | 0 | ||||
| Magnesium silicate hydrate (talc) | 14807-96-6 | 0 | 0.00006000 | 0 | ||||
| Hexadec-1-ene | 629-73-2 | 0 | 0.00001000 | 0 | ||||
| Propargyl alcohol | 107-19-7 | 0 | 0.00004000 | 0 | ||||
| Thiourea, polymer with formaldehyde and 1-phenylethanone | 68527-49-1 | 0.01 | 0.00012 | 0 | ||||
| Dimethyl siloxanes and silicones | 63148-62-9 | 0 | 0.00001000 | 0 | ||||
| Sodium chloride (impurity) | 7647-14-5 | 0 | 0.00002000 | 0 | ||||
| Glutaraldehyde | 111-30-8 | 0.28 | 0.00636 | 0 | ||||
| Dodecamethylcyclohexasiloxane | 540-97-6 | 0 | 0 | 0 | ||||
| Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 99 | 14.599 | 0 | ||||
| Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 0.08 | 0.00184 | 0 | ||||
| Polymer of 2-acrylamido-2-methylpropanesulfonic
acid sodium salt and methyl acrylate |
136793-29-8 | 0.03 | 0.00075 | 0 | ||||
| Copper(II) sulfate | 7758-98-7 | 0 | 0 | 0 | ||||
| Alcohols, C14-15, ethoxylated (7EO) | 68951-67-7 | 0 | 0.00006000 | 0 | ||||
| Formaldehyde | 50-00-0 | 0 | 0 | 0 | ||||
| Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 82.6713 | 0 |
For data sources see[4]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2015-04-05 | H2O | 8 | 955 Bbl | 326960 | Schlumberger | STAGE 42/42
25 SHOTS |
| 2015-03-21 | H2O | 15 | 4058 Bbl | 336980 | Schlumberger | STAGE 1/42
25 SHOTA |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | CHESAPEAKE EXPLORATION LLC | 674080 | 23942 | 172 |
| 2016 | CHESAPEAKE EXPLORATION LLC | 1275032 | 21133 | 363 |
| 2017 | CHESAPEAKE EXPLORATION LLC | 749526 | 6000 | 365 |
| 2018 | CHESAPEAKE EXPLORATION LLC | 556669 | 3234 | 365 |
| 2019 | CHESAPEAKE EXPLORATION LLC | 117562 | 644 | 90 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | CHESAPEAKE EXPLORATION LLC | Brine | 9762 | 172 |
| 2016 | CHESAPEAKE EXPLORATION LLC | Brine | 4487 | 363 |
| 2017 | CHESAPEAKE EXPLORATION LLC | Brine | 1053 | 365 |
| 2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1889 | 365 |
| 2019 | CHESAPEAKE EXPLORATION LLC | Brine | 411 | 90 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1175796889 | 2016-3-1 0:00:0 | PW | No Violations | 1.00 |
| -1179673709 | 2014-9-28 0:00: | CS | No Violations | 6.50 |
| -1352373544 | 2014-9-29 0:00: | CS | No Violations | 4.00 |
| -1968908295 | 2014-10-2 0:00: | DD | No Violations | 2.50 |
| -317925452 | 2014-7-20 0:00: | CS | No Violations | |
| 0317925452 | 2014-07-20 | Casing String Witnessed | No Violations | I witnessed the cementing of the conductor casing. TopHole Drilling drilled a 26 diameter hole to 120. TopHole installed 120 of 20 OD casing. O-Tex Pumping was the cementing contractor. The cement was mudscaled, and O-Tex pumped 53.4 bbls of cement slurry at 15.6 pounds per gallon. The cement was displaced with 39 bbls of water. 19 bbls of cement returned to surface. Displacement was completed at 6:45pm. |
| 0830031375 | 2015-10-08 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of nine, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:
Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed. |
| 1175796889 | 2016-03-01 | Production Wells | No Violations | I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road gate was in good repair, but was unlocked at the time of inspection. The #6H well is in production. The well is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence and equipped with locks on the man door. The man door was open at the time of inspection, but Chesapeake personnel were on site. The equipment on the pad consists of the following:
9 -400 bbl production tanks, three labelled as containing produced water, six labelled as containing condensate. 1- Low-pressure vertical separator located inside of the dike of the tank battery. 7 Producing wells 7 Sand separators 7 Gas Processing Units 5 Line Heaters 1 Heat Treater 1 Vapor Recovery Unit 2 Bullet Tanks |
| 1179673709 | 2014-09-28 | Casing String Witnessed | No Violations | I was on location at 4:30am to witness the cementing of the 13.375 surface casing. Nomac Rig # 73 drilled a 17.5 hole to a depth of 865 and Wyoming Casing set the surface pipe at a depth of 854. O-Tex Pumping cemented the casing with 164 barrels of Class H cement. 41 barrels of cement circulated to the cellar and weighed 15.3lbs/gal. on the pressurized scales. See cement report for more details on this job. No violations. |
| 1352373544 | 2014-09-29 | Casing String Witnessed | No Violations | I was on location at 2:00pm to witness the cementing of the 9.625 intermediate casing string. Nomac Rig # 73 drilled a 12.25 hole to a depth of 2018 and Wyoming Casing landed the pipe at a depth of 2008. O-Tex Pumping cemented the casing with 153 barrels of Class H cement. 21 barrels of cement circulated to the cellar and weighed 15.3lbs/gal. on the pressurized scales. See cement report for more details on this job. No violations. |
| 1396879372 | 2014-07-20 | Casing String Witnessed | No Violations
-Tex was the cementing contractor. O- | |
| 1968908295 | 2014-10-02 | Drill / Deepen / Reopen | No Violations | I was on location with DOGRM Geo-Tech Anthony Carson to inspect the well pad prior to conducting a pre-site inspection this morning and get him familiarized with what a working pad looks like after its constructed. We met with Chesapeake Company Man, Wesley Waycaster, to inform him that we would be inspecting the outside and inside perimeters of the location. We walked the location and inspected the under-drains, berms, and drainage controls around the location. No violations. |
| 830031375 | 2015-10-8 0:00: | PL | No Violations |
For data sources see[10]