Well Details

Well ID: 34-019-22669
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Center Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001214
Farm/Lease Name: GRIFFETH 7-15-6
License Status: Producing
License Date: 2015-02-27
Spud Date: 2015-03-27
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2015-05-24
Well Total Depth: 18710.00 ft
Configuration: Horizontal
Latitude: 40.570000
Longitude: -81.120000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-02-09 Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:2/9/2015, Expired Date:2/8/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2015-02-27 Proposed Formations:POINT PLEASANT, Issued Date:2/27/2015, Expired Date:2/26/2017 12:00:00 PM, Drilling unit acres:630.99, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-05-24
Correction to Well 2015-09-18 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Change Location Lat Lon 2016-07-22 updated take pointlocation per as drilled plat
Construction Permit Expires 2017-02-26
Correction to Well 2017-09-08 UPDATE TAKE PER AS-DRILLED PLAT RCVD 08/28/2017 ALE.
Completion Report Received 2017-10-10
Record Last Modified 2018-02-27

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-10-11 15544 18588 500
15544 18588 500
15544 18588 500

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/09/2016 03/13/2016 7523 2,923,410.0 222440

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BXL02 Borate XL FTS INTERNATIONAL Cross Linker Boric Acid 010043-35-3 15 0.00821 0
Sodium Metaborate Tetrahydrate 010555-76-7 25 0.01369 0
Potassium Hydroxide 001310-58-3 12 0.00657 0
Northern White Sand PRODUCERS SERVICE CORP Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 13.2674 0
HCL ACID PRODUCERS SERVICE CORP Acid Hydrochloric Acid 007647-01-0 15 0.14597 0
Water 007732-18-5 85 0.82717 0
Chlorine Dioxide TERRA SERVICES Anti-Bacterial Agent Chlorine Dioxide 010049-04-4 100 0.01304 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 69.5712 0
100 Mesh Sand PRODUCERS SERVICE CORP Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 0.46007 0
FE 200 FTS INTERNATIONAL Iron Control Agent Tetrasodium Ethylenediaminetetraacetate 000064-02-8 41 0.00242 0
Sodium Hydroxide 001310-73-2 2 0.00011 0
Trisodium Nitrilotriacetate 005064-31-3 2 0.00012 0
LTB-01 FTS INTERNATIONAL Breaker Proprietary Cured Acrylic Resin TRADE SECRET 25 0.00556 0
Ammonium Persulfate 007727-54-0 100 0.02224 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 25 0.00556 0
CS35 ECONOMY Buffer Water 007732-18-5 0 0.00445 0
Sodium Hydroxide 001310-73-2 25 0.0012 0
TS-30 TERRA SERVICES Scale Inhibitor Water 007732-18-5 0 0.01233 0
Proprietary Sodium Polycarboxylate TRADE SECRET 100 0.01063 0
BXL02 Borate XL, CI-150, FE 200, FRW-200, LTB-01 FTS INTERNATIONAL Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Iron Control Agent Proprietary Breaker Additive (LTB-1) TRADE SECRET 0 0.00645 0
Proprietary Corrosion Inhibitor Additive (CI-150) TRADE SECRET 0 0.001 0
Proprietary Friction Reducer Additive

(FRW-200 and FRW-200W)

TRADE SECRET 0 0.01218 0
Proprietary Iron Control Additive (FE-200L) TRADE SECRET 0 0.0042 0
Water 007732-18-5 0 0.06156 0
CI-150 FTS INTERNATIONAL Corrosion Inhibitor Dimethyl Formamide 000068-12-2 10 0.00019 0
Proprietary Quaternary Ammonium Compound TRADE SECRET 10 0.00019 0
Proprietary Organic Amine Resin Salt TRADE SECRET 30 0.00058 0
Isopropanol (Isopropyl Alcohol, Propan-2-ol) 000067-63-0 60 0.00116 0
Proprietary Aromatic Aldehyde TRADE SECRET 10 0.00019 0
FRW-200 FTS INTERNATIONAL Friction Reducer Petroleum Distillate Hydrotreated Light 064742-47-8 26 0.00332 0
HVG01 (TURQUOISE-1 BULK) FTS INTERNATIONAL Gelling Agent Surfactant 068439-51-0 2 0.00355 0
Petroleum Distillate Hydrotreated Light 064742-47-8 55 0.09767 0
Guar Gum 009000-30-0 50 0.08879 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 2 0.00355 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 15.4245 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-03-09 H2O 0 3040 Bbl 199815 Frac Tech Services STAGE 1/20

25 SHOTS STAGES 2-19 SEE IMAGES

2016-03-13 H2O 0 2903 Bbl 199452 Frac Tech Services STAGE 20/20

25 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC 243826 43656 152
2018 CHESAPEAKE EXPLORATION LLC 381562 44532 365
2019 CHESAPEAKE EXPLORATION LLC 64282 6902 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC Brine 20552 152
2018 CHESAPEAKE EXPLORATION LLC Brine 6577 365
2019 CHESAPEAKE EXPLORATION LLC Brine 1269 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-2145242686 2015-3-28 0:00: DD No Violations 3.00
-38384008 2015-5-17 0:00: CS No Violations
-503698613 2017-11-13 0:00 PW No Violations 1.00
0038384008 2015-05-17 Casing String Witnessed No Violations

-Tex was the cementing contractor. Circulation was established at 8:43 AM and there was good fluid circulation throughout the cementing operation. A 35 bbl gel spacer was pumped ahead of the cement to condition the hole. The cement was mudscaled, and O-Tex pumped 198 bbls of cement slurry at 15.8 ppg. The plug was released at 9:37 AM and was displaced with 187 bbls of water as measured by pump truck tanks. Approximately 44 bbls of cement slurry returned to surface. The plug bumped the float collar at 10:03 AM and pressure was increased to 500 psi over and held for five minutes. The float held when pressure was released.

0054432436 2017-06-27 Drill / Deepen / Reopen No Violations I was on site during hydraulic fracturing completions of the #2H (PN#22665), #8H (PN# 22668, and #9H ((PN# 22667) wells. Halliburton was on site to complete remaining stages after 37/70 stages were completed in January or 2017, but were discontinued after a hole in the casing was encountered which was repaired in May of 2017. Halliburton was the completions contractor. I conducted a status check of the site while on location. No issues were noted at the well or pad at the time of inspection.
0503698613 2017-11-13 Production Wells No Violations I was on location to conduct a preliminary restoration inspection. The well is equipped an open flow Christmas tree assembly. Jersey barriers were installed around the wellhead and the well was identified with a legibly-marked well identification sign. The surface--pressure vertical separator. The tank battery is surrounded by a dike and the tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Production equipment on the well pad consisted of:

8- 400 bbl production tanks, three labelled as containing fresh water, and five labelled as containing condensate, with a low pressure vertical separator located inside of the dike. six producing wells six sand separators six gas processing units one heat treater one combustor unit two compressor stations one oil stabilization unit

Jersey barriers are installed around the production equipment.  The access road and man doors were locked.  Drainage and erosion controls at the pad are in place and functioning.  A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure.  The pad has a crushed limestone surface, and is in good repair.  The lease road was stable in in good repair.
1176022749 2020-7-9 0:00:0 PW No Violations 1.00
1431957939 2015-05-15 Casing String Witnessed No Violations

-Tex was the cementing contractor. Circulation was established at 11:30 PM and there was good fluid circulation throughout the cementing operation. A 30 bbl gel spacer was pumped ahead of the cement to condition the hole. The cement was mudscaled, and O-Tex pumped 166.7 bbls of cement slurry at 15.7 ppg. The plug was released at 12:18 AM and was displaced with 127 bbls of water as measured by pump truck tanks. Approximately 30 bbls of cement slurry returned to surface. The plug bumped the float collar at 12:32 AM and pressure was increased to 500 psi over and held for five minutes. The float held when pressure was released and 0.5 bbls of water bled back.

1435761104 2015-05-20 Drill / Deepen / Reopen No Violations I performed a status check on the above location. Nomac Rig 70 is drilling a 8.750 hole at a depth of 7150. All permits and conditions are posted. No violations at this time.
1445569906 2018-10-31 Production Wells No Violations The well was equipped with an open-flow assembly. The surface-intermediate annular gauge displayed a reading of zero psi and the intermediate-production annular gauge displayed 170 psi. I performed a walk-around inspection of the pad and no violations were observed at the time of inspection.
1490021791 2017-03-17 Completion Testing No Violations I was on location to witness the resetting of a new isolation plug. The plug that was set on 3/15/2017 did not hold the 7000 psi test for 10 minutes. The decision was made to tag the plug and set a new one. On 3/17/2017, 9 Energy Service was on location to set the plug. They went in the 5.5 casing with a 4.24 electronic cast iron millable plug. We tagged the plug at 7665 + 5 (7670). There was a 10 marker sub at 6535 that is where they correlated the measurement from before setting the plug at 7623 + 5 (7628). The plug was pressure tested in 1000 psi increments for 10 minutes starting at 0 to 1000 up to and including 9000 psi. After the step test was completed the pressure was bleed off to 0 psi and the well was blocked in to perform a negeative test. After 10 minutes the pressure was at 0. There was a chart used to record the pressure test and also the negetavite test.
1506357666 2018-06-19 Production Wells No Violations The well was equipped with an open-flow assembly. The surface/intermediate and the intermediate/production annular pressure gauges displayed readings of zero psi. I performed a walk-around inspection of the pad. No violations were observed at the time of inspection.
2145242686 2015-03-28 Drill / Deepen / Reopen No Violations Express Energy drilled a 26 hole to a depth of 120 and ran 120 of 20 94 lb./ft. of welded conductor casing. Express Energy was the cementing contractor. They pumped 230 sacks (48.34 bbl..) of class A cement 15.6 lb./gal. The cement was displaced with 39.07 barrels of fresh water. There was 16 barrels of cement returned to surface.
54432436 2017-6-27 0:00: DD No Violations

For data sources see[10]