X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22689

Well Details

Well ID: 34-019-22689
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Harrison Township
Operator Name: R E GAS DEVELOPMENT LLC
Well Pad ID:
Farm/Lease Name: PERRY UNIT
License Status: Final Restoration
License Date: 2015-05-14
Spud Date: 2015-08-11
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2015-11-10
Well Total Depth: 7555.00 ft
Configuration: Vertical
Latitude: 40.630000
Longitude: -81.110000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-05-14 Proposed Formations:UTICA/POINT PLEASANT/TRENTON, Issued Date:5/14/2015, Expired Date:5/13/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Plugged Back 2015-10-10
Reached Total Depth 2015-11-10
Completion Report Received 2016-01-19
Construction Permit Expires 2017-05-13
Record Last Modified 2017-10-12

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-08-26 7826 13554 0
7826 13554 0
7826 13554 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/13/2016 06/24/2016 7326 13,056,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water, Sand, H315, A264A, J218, J580, L071 Schlumberger Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Alcohols, C10-16, ethoxylated 68002-97-1 0 0.00008000 1
Water, Sand, H315, A264A, J218, J580, L060 Schlumberger Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Acetic acid(impurity) 64-19-7 0 0.00003000 1
Pro 200 ECM Friction Reducer Hydrotreated petroleum distillate 64742-47-8 35 0.037236 55613.4
Ethoxylated alcohols 68551-12-2 4 0.00425554 6355.81
Ethoxylated alcohols 68002-97-1 4 0.00425554 6355.81
2 propenoic acid, ammonium salt,

polymer with 2 propenamide, sodium salt

910644-97-2 45 0.0478749 71502.9
Water 7732-18-5 50 0.0531943 79447.7
Ethoxylated alcohols 68439-50-9 4 0.00425554 6355.81
Ammonium acetate 631-61-8 12 0.0127666 19067.4
Water, Sand, H315, A264A, J218, J580, L073 Schlumberger Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Reaction product of: acetophenone,

formaldehyde, cyclohexylamine, methanol and acetic acid

224635-63-6 0 0.00029 1
Chlorine Dioxide Baker Hughes Biocide Chlorine Dioxide 10049-04-4 0.3 0.00254554 2726.83
Parasorb 5005 Baker Hughes Paraffin Inhibitor Olefin/Maleic Ester 68188-50-1 30 0.00226196 2640
Calcined Diatomaceous Earth 91053-39-3 100 0.00753988 8800
Crystalline Silica: Quartz (SiO2) 14808-60-7 1 0.00007540 88
Acetic acid etheynl ester, polymer with ethene 24937-78-8 5 0.000376994 440
Naphthalene 91-20-3 1 0.00007540 88
Mineral Oil 8042-47-5 5 0.000376994 440
Trimethylbenzenes 95-63-6 0.5 0.00003770 44
Diatomaceous Earth, Natural (kieselguhr) 61790-53-2 5 0.000376994 440
Heavy Aromatic Naphtha 64742-94-5 10 0.000753988 880
Chrystalline Silica: Cristobalite 14464-46-1 1 0.00007540 88
Water, Sand, H315, A264A, J218, J580, L061 Schlumberger Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Methanol 67-56-1 0 0.00069 1
Water, Sand, H315, A264A, J218, J580, L063 Schlumberger Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Cinnamaldehyde 104-55-2 0 0.00016 1
Water, Sand, H315, A264A, J218, J580, L058 Rex Energy Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Water 7732-18-5 100 87.6087 1
Scaletrol 10333 Baker Hughes Scale Inhibitor Polymer 77-92-9 5 0.00112481 1290
Citric Acid, Anhydrous 77-92-9 15 0.00337443 3871
Phosphonic Acid 68649-44-5 20 0.00449923 5161.5
Methanol 67-56-1 20 0.00449923 5161.5
Scalesorb 12 Baker Hughes Scale Inhibitor Diatomaceous Earth, Calcined 91053-39-3 50 0.00150798 1760
Phosphonic acid, sodium salt 15475-67-9 5 0.000150798 176
Sodium Chloride 7647-14-5 5 0.000150798 176
Water 7732-18-5 30 0.000904786 1056
Sodium Salt of Polyamino Phosphonate 1252600-17-1 20 0.000603191 704
Phosphorous Acid 13598-36-2 1 0.00003016 35.2
Crystalline Silica: Quartz (SiO2) 14808-60-7 1 0.00003016 35
Water, Sand, H315, A264A, J218, J580, L062 Schlumberger Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Acetophenone 98-86-2 0 0.00003000 1
Water, Sand, H315, A264A, J218, J580, L059 Schlumberger Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Formaldehyde (impurity) 50-00-0 0 0.00002000 1
Water, Sand, H315, A264A, J218, J580, L067 Schlumberger Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Diammonium peroxidisulphate 7727-54-0 0 0.00042 1
Water, Sand, H315, A264A, J218, J580, L069 Schlumberger Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Quartz, Crystalline silica 14808-60-7 98.4 12.1929 1
Water, Sand, H315, A264A, J218, J580, L064 Schlumberger Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Sodium erythorbate 6381-77-7 0 0.00099 1
Water, Sand, H315, A264A, J218, J580, L065 Schlumberger Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Non-crystalline silica (impurity) 7631-86-9 0 0.00006000 1
Water, Sand, H315, A264A, J218, J580, L066 Schlumberger Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Hydrochloric acid 7647-01-0 1.4 0.17118 1
Water, Sand, H315, A264A, J218, J580, L070 Schlumberger Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Amines, tallow alkyl, ethoxylated 61791-26-2 0 0.00002000 1
Water, Sand, H315, A264A, J218, J580, L072 Schlumberger Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Alcohol, C9-C11, Ethoxylated 68439-46-3 0 0.00012 1
Water, Sand, H315, A264A, J218, J580, L068 Schlumberger Carrier/Base Fluid, Proppant, Acidizing, Corrosion Inhibitor, Breaker, Gelling Agent, Iron Control Guar gum 9000-30-0 0.2 0.02431 1

For data sources see[4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 R E GAS DEVELOPMENT LLC Brine 15823 162
2017 R E GAS DEVELOPMENT LLC Brine 6913 349
2018 PENNENERGY RESOURCES LLC Brine 3589 343
2019 PENNENERGY RESOURCES LLC Brine 833 76

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-760254388 2018-6-28 0:00: PW No Violations 1.00
0760254388 2018-06-28 Production Wells No Violations I conducted a status check of the well and production pad. The well is equipped with a plunger-lift assembly. The surface-intermediate annulus was equipped with a pressure--around inspection of the pad perimeter and erosional controls appeared functioning.

Equipment on the pad consisted of the following: Two producing wells Six 400 bbl production tanks; three labelled as containing condensate and three as containing produced water Two gas processing units One vertical separator One combustor unit One vapor recovery unit One oil heater unit with a vertical separator and glycol tower

1446490355 2015-10-29 Drill / Deepen / Reopen No Violations I went to the site with DOGRM inspector Robert Roush to have a pre-spud meeting with Rex drilling consultants Aaron Wilhite and Clayton Lane. We discussed the plan to drill the stratigraphic well, the plug back plan for the well, casing plan, and contact points. We performed a walk-around inspection of location. The synthetic oil-based mud tanks were positioned at the edge of containment and on the edge of a hill. We requested that the tanks be moved so that they are centered in containment. No violations were found during our inspection.
1447770716 2015-11-16 Drill / Deepen / Reopen No Violations I inspected the drilling activity at the Perry # 2S well on 11/16/2015. Sidewinder Drilling Rig # 62 was drilling ahead at 10,042 MD on oil based mud. I conducted a walk around inspection of the cellar, solids handling area, mud storage, mud tanks and mud pumps. I walked the perimeter of the pad and did not identify any conditions which would require correction. No violations were identified during my inspection.
1546188366 2020-4-2 0:00:0 PW No Violations 0.50

For data sources see[7]

References