34-019-22700

Well Details

Well ID: 34-019-22700
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Orange Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001024
Farm/Lease Name: DELMAR 24-13-6
License Status: Producing
License Date: 2015-06-25
Spud Date: 2015-07-20
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2015-08-09
Well Total Depth: 15569.00 ft
Configuration: Horizontal
Latitude: 40.470000
Longitude: -81.160000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-06-25 Proposed Formations:POINT PLEASANT, Issued Date:6/25/2015, Expired Date:6/24/2017 12:00:00 PM, Drilling unit acres:537.35, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2015-08-09
Correction to Well 2015-11-06 UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2016-04-11
Construction Permit Expires 2017-06-24
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-04-15 8348 15440 0
8348 15440 0
8348 15440 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/27/2015 11/10/2015 7561 8,870,950.0 798504

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 16.4637 0
Chlorine Dioxide TERRA SERVICES Anti-Bacterial Agent Chlorine Dioxide 010049-04-4 100 0.00736 0
PTLGL341 PERFORMANCE TECHNOLOGIES Gelling Agent Solvent naptha, (petroleum) heavy aliphatic 064742-96-7 65 0.11071 0
PTLBW112 PERFORMANCE TECHNOLOGIES Breaker Ammonium Persulfate 007727-54-0 100 0.00315 0
PTLFR200 PERFORMANCE TECHNOLOGIES Friction Reducer Proprietary Oxyalkylated Alcohol TRADE SECRET 5 0.00068 0
Proprietary Aliphatic Hydrocarbon TRADE SECRET 30 0.00408 0
PTLAI161, PTLBW112, PTLCA104, PTLFR200, PTLGL341, PTLIS347 PERFORMANCE TECHNOLOGIES Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent Sodium Chloride 007647-14-5 0 0.01456 0
Copper Sulfate 007758-98-7 0 0.00016 0
Sodium Erythorbate 006381-77-7 0 0.0003 0
Proprietary Substituted Fatty Acid Ester TRADE SECRET 0 0.01456 0
Proprietary Vinyl Copolymer TRADE SECRET 0 0.01607 0
Proprietary Polyether TRADE SECRET 0 0.00001000 0
Methanol (Methyl Alcohol) 000067-56-1 0 0 0
Proprietary Fatty Amino Adduct TRADE SECRET 0 0.00026 0
Non-MSDS Components Not Provided by Supplier NOT PROVIDED 0 0 0
Proprietary Oxyalkylated Fatty Acid Derivative TRADE SECRET 0 0.01456 0
Tetrasodium Ethylenediaminetetraacetate 000064-02-8 0 0.01456 0
Proprietary Oxyalkylated Alcohol TRADE SECRET 0 0.00001000 0
Proprietary Aliphatic Alcohol TRADE SECRET 0 0.01456 0
Water 007732-18-5 0 0.01482 0
Northern White Sand PERFORMANCE TECHNOLOGIES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 16.1976 0
100 Mesh Sand PERFORMANCE TECHNOLOGIES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 0.58509 0
TS-30 TERRA SERVICES Scale Inhibitor Water 007732-18-5 0 0.0111 0
Proprietary Sodium Polycarboxylate TRADE SECRET 100 0.00924 0
PTLAI161 PERFORMANCE TECHNOLOGIES Corrosion Inhibitor Proprietary Aromatic Aldehyde TRADE SECRET 10 0.00007000 0
Proprietary Fatty Alcohol Ethoxylate TRADE SECRET 30 0.00022 0
Proprietary Ethoxylated Alcohol Blend TRADE SECRET 10 0.00007000 0
Proprietary Alkyl Amine Surfactant TRADE SECRET 5 0.00004000 0
Isopropanol (Isopropyl Alcohol, Propan-2-ol) 000067-63-0 60 0.00044 0
PTLMP075 PERFORMANCE TECHNOLOGIES Acid Water 007732-18-5 93 0.63511 0
Hydrochloric Acid 007647-01-0 8 0.0515 0
PTLCA104 PERFORMANCE TECHNOLOGIES Cross Linker Sodium Hydroxide 001310-73-2 30 0.01564 0
Sodium Tetraborate (Sodium Tetraborate Decahydrate) 001303-96-4 30 0.01564 0
Proprietary Alkyl Alcohol TRADE SECRET 30 0.01564 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 65.7807 0
PTLIS347 PERFORMANCE TECHNOLOGIES Iron Control Agent No Hazardous Components NONE 0 0 0
PTLMP136 PERFORMANCE TECHNOLOGIES Acid Water 007732-18-5 85 0.02508 0
Hydrochloric Acid 007647-01-0 15 0.00443 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-10-27 H2O 0 4132 Bbl 325065 Performance Technologies STAGE 1/47

25 SHOTS STAGES 2-46 SEE IMAGES

2015-11-10 H2O 0 3961 Bbl 330200 Performance Technologies STAGE 47/47

25 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 CHESAPEAKE EXPLORATION LLC 295960 58451 305
2017 CHESAPEAKE EXPLORATION LLC 163622 23442 349
2018 CHESAPEAKE EXPLORATION LLC 112919 16613 365
2019 CHESAPEAKE EXPLORATION LLC 25866 3673 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 CHESAPEAKE EXPLORATION LLC Brine 24113 305
2017 CHESAPEAKE EXPLORATION LLC Brine 15022 349
2018 CHESAPEAKE EXPLORATION LLC Brine 3636 365
2019 CHESAPEAKE EXPLORATION LLC Brine 708 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1358275977 2016-4-27 0:00: PL No Violations 1.00
-168642195 2016-11-16 0:00 PW No Violations
-1828136636 2017-8-15 0:00: PW No Violations 1.00
-1895224866 2018-11-25 0:00 PW No Violations 0.70
-2063533153 2017-8-2 0:00:0 PW No Violations
-392646029 2016-9-6 0:00:0 PW No Violations 1.00
-741168134 2017-8-14 0:00: PW No Violations
-875216100 2019-10-30 0:00 PW No Violations 1.00
0168642195 2016-11-16 Production Wells No Violations I conducted an inspection in response to complaint #5405. The access road was equipped with a gate and was locked. The #5H well is in production and the well is equipped with a plunger lift assembly. No violations were found.

The equipment on the pad now consists of the following: 6-producing wells 15 - 400 bbl production tanks, five labelled as containing produced water, and ten labelled as containing condensate. 6 sand separators 6 gas processing units 1 vapor recovery units 1 low pressure vertical separator 1 bullet tank 1 Line heater 2 heat treaters 3 compressors.

0305149933 2018-06-04 Production Wells No Violations I was on site in response to complaint #5671 regarding vibrations at the complainants house who lives near the pad. I received a call from the complainants residence at approximately 9:00 AM on 06/04/2018 stating vibrations were felt at the residence. I arrived on site at approximately 9:20 AM. No equipment malfunctions or anomalies were observed on site. I stood near the combustor for several minutes and did not hear or detect any anomalies at the time of inspection. No violations were observed on the pad.
0392646029 2016-09-06 Production Wells No Violations I was on location to conduct an inspection of this well in response to complaint #5424. Identification signs were posted at the access road entrance, the well, and the storage tanks. The well is open flow with a wellhead Christmas tree assembly. The #5H well is in production. The tank battery consisted of 15- 400 bbl production tanks, ten labelled as containing condensate, and five labelled as containing produced water. The tank battery was surrounded by a dike and no standing water was present inside of the tank battery. Other production equipment on the well pad consisted of:

6 producing wells 6 sand separators 6 gas processing units 2 vapor recovery units 1 low pressure vertical separator 1 bullet tank 2 line heaters 2 heat treaters 2 compressors

-frequency noise originating from the compressors was audible. Mark Deering of Chesapeake was contacted by DOGRM Regional Manager Tom Hill regarding the noise, and a sound study is being planned.

0399714609 2016-08-16 Production Wells No Violations I conducted a follow-up inspection of this well in response to complaint #5405. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road was equipped with a gate and was locked. The #5H well is in production. The well is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. There was approximately three inches of standing water inside of the dike and algae growth was present in the water. I did not locate or identify any sheen on the water inside of the dike. I tested the standing water for chlorides using a high-range QuanTab which concluded in a reading of under 100 ppm.

The equipment on the pad consists of the following: 6-producing wells 15 - 400 bbl production tanks, five labelled as containing produced water, and ten labelled as containing condensate. 6 sand separators 6 gas processing units 2 vapor recovery units 1 low pressure vertical separator 1 bullet tank 1 line heater 2 heat treaters

0677078135 2015-07-21 Casing String Witnessed No Violations I witnessed the cementing of the conductor casing. Express Energy Services drilled a 26 diameter hole to 110. Express installed 110 of 20 OD casing. During drilling, water was encountered at an approximate depth of 15. Express Energy Services was the cementing contractor. Water was pumped ahead to confirm circulation. The cement was mudscaled at 15.6 pounds per gallon (ppg). Express pumped 48.34 bbls of cement slurry at 15.6 ppg. The cement was displaced with 39.07 bbls of water. Twelve (12) bbls of cement returned to surface. Displacement was completed at 11:45 PM
0741168134 2017-08-14 Production Wells No Violations I was on site in with DOGRM District Supervisor Stephen Ochs in response to complaint #5671 in which the complainant, who lives near the pad, is reporting vibrations at his house. No noise/vibration anomalies, or equipment issues were observed at the time of inspection. No violations were noted at the time of inspection.
0746197755 2018-08-21 Production Wells No Violations

-around inspection of the site and no equipment malfunctions were apparent. No violations were observed at the time of inspection. The surface-intermediate and intermediate-

1158880667 2017-07-26 Production Wells No Violations I conducted a follow--around inspection of the site, and no issues were found during my inspection.
1358275977 2016-04-27 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. The well is properly identified with a legibly-marked well identification sign. The #5H well appears to be in production, but the well was completed in December of 2015, and production records for the first quarter of 2016 are not yet available in the RBDMS database. Identification was posted at the tank battery which consisted of one low-pressure vertical separator, and 15- 400 bbl production tanks, ten labeled as containing condensate, and five labelled as containing produced water. The tank battery is surrounded by a dike and the tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:

6 producing wells 6 sand separators 6 gas processing units 2 vapor recovery units 1 low pressure vertical separator, located outside of the tank battery 1 bullet tank 1 Line heater 2 heat treaters

Jersey barriers are installed around the production equipment.  The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire.  The access road and man doors were unlocked, but third-party personnel were on site during my inspection.  Drainage and erosion controls at the pad are in place and functioning.  The pad has a crushed limestone surface, and is in good repair.  The lease road was stable in in good repair.   No violations were observed during my inspection.
1434031607 2019-9-9 0:00:0 PW No Violations 0.70
1480429842 2016-09-06 Production Wells No Violations I conducted a follow-up inspection in response to compliant #5405. The access road was equipped with a gate and was locked. The #5H well is in production and the well is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. No standing water was present inside of the dike.

The equipment on the pad consists of the following: 6-producing wells 15 - 400 bbl production tanks, five labelled as containing produced water, and ten labelled as containing condensate. 6 sand separators 6 gas processing units 2 vapor recovery units 1 low pressure vertical separator 1 bullet tank 1 Line heater 2 heat treaters

1486500522 2017-02-01 Production Wells No Violations I conducted a follow-up inspection in response to complaint #5479. The #5H well is in production and the well is equipped with an open flow assembly. Sound barriers were installed around the two compressor units on site. No violations were found during my inspection.

The equipment on the pad consists of the following: 6-producing wells 15 - 400 bbl production tanks, five labelled as containing produced water, and ten labelled as containing condensate. 6 sand separators 6 gas processing units 1 vapor recovery unit 1 low pressure vertical separator 1 bullet tank that appeared not to be in production. 1 Line heater 2 heat treaters 2 compressors

1487276207 2017-01-27 Production Wells No Violations Northeast Region Supervisor Tom Hill called and ask if I would go to the Delmar 24-13-6 Pad and check the sound walls that were installed around the compressors at this location. At the entrance the sound was very low. I was at different locations and it was very quite.
1497615148 2017-06-14 Production Wells No Violations I conducted a follow--range Quantab which concluded in a reading of 57 ppm. Identification was posted at the well head, the tank battery, and at the access road entrance.

The equipment on the pad consists of the following: 6-producing wells 15 - 400 bbl production tanks, five labelled as containing produced water, and ten labelled as containing condensate. 6 sand separators 6 gas processing units 1 vapor recovery units 1 low pressure vertical separator 1 bullet tank 1 Line heater 2 heat treaters 2 compressors No violations were noted during the time of inspection.

1505399870 2017-09-12 Production Wells No Violations I was on site in response to complaint #5671 regarding vibrating at the complainants house who lives near the pad. I received a call at 7:58 am on 09/12/17 from the complainant stating he was experiencing vibrations in his home. I arrived on site at approximately 9:00 am. I did not witness any equipment malfunctions or anomalies while on site. No other changes have been made to the pad since my last inspection. No violations were noted at the time of inspection.
1671454630 2017-08-20 Production Wells No Violations I was on site in response to complaint #5671 in which the complainant, who lives near the pad, is reporting incidents of vibrations at his home. No anomalies or abnormal noise/vibrations were observed at the time of inspection.
1828136636 2017-08-15 Production Wells No Violations I was on location with DOGRM Regional Supervisor Tom Hill in response to complaint #5671 regarding reports of house vibrations at the complainants home. No equipment issues or sources of vibration were apparent at the time of inspection. No violations were observed at the time of inspection.
1895224866 2018-11-25 Production Wells No Violations I was on site to follow-up on complaint #5671 regarding vibrating at the complainants house who lives near the pad. I observed no equipment anamolies or excessive noise/vibrations while on site. The surface/intermediate and intermediate/production annular gauges displayed zero psi. No violations were observed at the time of inspection.
2063533153 2017-08-02 Production Wells No Violations I was on site with DOGRM Regional Supervisor Tom Hill in response to complaint #5671 in which the complainant, Mr. Kiefer, who lives near the pad reported incidents of house vibrations, and complaint #5479 regarding noise from the site. The noise from the compressor has been mitigated, and is audibly decreased after Chesapeake installed three walls of sound barriers have been around the compressor units. Three-sided metal screening, which covered past the louvers in height, was installed around the combustor. Complaint #5479 can be closed. We did not witness any equipment malfunctions or problems on the pad at the time of inspection. There was approximately three inches of standing water inside of the tank battery which I tested for chlorides using a low-range Quantab which concluded in a reading under 30 ppm. No violations were observed at the time of inspection.
305149933 2018-6-4 0:00:0 PW No Violations 0.50
399714609 2016-8-16 0:00: PW No Violations
677078135 2015-7-21 0:00: CS No Violations
746197755 2018-8-21 0:00: PW No Violations

For data sources see[10]