34-019-22715

Well Details

Well ID: 34-019-22715
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Perry Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000397
Farm/Lease Name: EDIE 17-13-6
License Status: Producing
License Date: 2015-11-17
Spud Date: 2015-10-20
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2016-01-27
Well Total Depth: 14222.00 ft
Configuration: Horizontal
Latitude: 40.440000
Longitude: -81.140000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-09-25 Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:9/25/2015, Expired Date:9/24/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Correction to Well 2015-11-20 CORRECTION TO CASING PROGRAM.
Reached Total Depth 2016-01-27
Correction to Well 2017-05-19 UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 3-28-17 ALE.
Completion Report Received 2017-05-30
Construction Permit Expires 2017-09-24
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-04-07 7946 8028 30
2017-04-07 13993 14115 30
13993 14115 30
7946 8028 30
7946 8028 30

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/15/2017 02/04/2017 7816 22,205,900.0 1,149,470.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 7.5pct HCl FTS INTERNATIONAL Acid Hydrochloric Acid 007647-01-0 8 0.06536 0
Water 007732-18-5 93 0.80612 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 2.88 0
FRW-600 FTS INTERNATIONAL Friction Reducer Petroleum Distillate Hydrotreated Light 064742-47-8 30 0.00171 0
SC30 X CHEM Scale Inhibitor Sodium Polyacrylate 009003-04-7 100 0.01048 0
FE 200 FTS INTERNATIONAL Iron Control Agent Sodium Hydroxide 001310-73-2 2 0.0001 0
Trisodium Nitrilotriacetate 005064-31-3 2 0.0001 0
Tetrasodium Ethylenediaminetetraacetate 000064-02-8 41 0.00207 0
CI-150, FE 200, FRW-600 FTS INTERNATIONAL Corrosion Inhibitor, Friction Reducer, Iron Control Agent Proprietary Corrosion Inhibitor Additive (CI-150) Trade Secret 0 0.00073 0
Proprietary Friction Reducer Additive (FRW-600) Trade Secret 0 0.00573 0
Proprietary Iron Control Additive (FE-200L) Trade Secret 0 0.00347 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 1 0.00009000 0
Northern White Sand FTS INTERNATIONAL Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 9.56117 0
FRW-675 FTS INTERNATIONAL Friction Reducer Distillates (petroleum), Hydrotreated Light 64742-47-8 20 0.01792 0
Water 7732-18-5 0 0 0
9-Octadecenamide, N,N-bis(2-hydroxyethyl)-, (Z)- 93-83-4 2 0.00179 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 85.5643 0
CI-150 FTS INTERNATIONAL Corrosion Inhibitor Proprietary Quaternary Ammonium Compound Trade Secret 10 0.00015 0
Dimethyl Formamide 000068-12-2 10 0.00015 0
Isopropanol (Isopropyl Alcohol, Propan-2-ol) 000067-63-0 60 0.00088 0
Proprietary Aromatic Aldehyde Trade Secret 10 0.00015 0
Proprietary Organic Amine Resin Salt Trade Secret 30 0.00044 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-01-15 H2O 8 7981 Bbl 285162 Frac Tech Services STAGE 1/61

SEE IMAGES FOR STAGES 2-60

2017-02-04 H2O 8 5605 Bbl 330363 Frac Tech Services STAGE 61/61

SEE IMAGES FOR STAGES 2-60

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC 534401 89842 265
2018 CHESAPEAKE EXPLORATION LLC 467730 46726 365
2019 CHESAPEAKE EXPLORATION LLC 84824 7281 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC Brine 31172 265
2018 CHESAPEAKE EXPLORATION LLC Brine 15877 365
2019 CHESAPEAKE EXPLORATION LLC Brine 249 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1021311082 2017-6-29 0:00: PL No Violations
-1659551451 2019-12-9 0:00: PW No Violations 1.00
-1975065239 2016-1-22 0:00: CS No Violations
1021311082 2017-06-29 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The #8H well is in production and consists of an open-flow assembly. Jersey barriers were installed around the wellhead. The well is identified with a legibly-marked well identification sign. Identification was posted at the tank battery which consisted of ten 400 bbl production tanks, four labeled as containing produced water, and six labelled as containing condensate, and one low-pressure. The tank battery is surrounded by a dike. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Production equipment on the well pad consisted of:

5-producing wells 10- 400 bbl production tanks, four labelled as containing produced water, and six labelled as containing condensate 5 sand separators 5 gas processing units 5 low pressure vertical separator 5 vapor recovery units 1 horizontal separator 1 compressor station 2 oil stabilization units. Jersey barriers are installed around the production equipment. The access road and man doors were locked. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road was stable in in good repair.

1153416452 2018-11-19 Production Wells No Violations The well was equipped with an open flow assembly. The surface/intermediate annular gauge displayed a reading of zero psi and the intermediate/production displayed 45 psi. I performed a walk-around inspection of the pad and no violations were observed at the time of inspection.
1453523976 2016-01-21 Casing String Witnessed No Violations I was on the Edie 17-13-6 # 8H location to observe the cementing of the 13.375 surface casing. Nomac Drilling Rig # 71 drilled a 17.5 borehole from 140 KB to 580 KB. Wyoming Casing Service ran 547 of 13.375 casing to 572 KB. Schlumberger conditioned the wellbore with 25 barrels of gelled spacer followed by 10 barrels of water. Schlumberger circulated a cement slurry ( 112 barrels ) back to the cellar. Cement slurry weight was verified by scale at 15.6 ppg. Cement slurry returns to the cellar were 27 barrels. A walk around inspection of the drilling operations did not reveal any violations at the this time.
1484920142 2017-01-17 Completion Testing No Violations I received a call from Chesapeake Completions Supervisor Matt Wood on Saturday January 14th to notify me that hydraulic fracturing operations were going to commence on this pad within the next 24-36 hours. I was on location today to witness completion operations on this horizontal, Utica/Point Pleasant well. FTS International was conducting Stage 6 fracturing operations on this well and Stage 7 perforating operations on the #3H (PN# 22712). They pumped the proppant (sand) between 0.25lbs/gallon and 1.25lbs/gallon and at a rate between 80-83 barrels per minute. The hydraulic horsepower ranged between 17,300-17,600 horsepower. Average treatment pressure was 8549psi at 1.0lb/gallon and 8559psi at 1.25lbs/gallon. The maximum psi for this stage was 9138psi. The bottom hole pressure fluctuated between 10,600psi and 11,100psi during the stage. The annuli were being monitored during the job and readings showed pressures fluctuating between 200psi-207psi. When I left the job, FTS had put away 284,000lbs of sand. The job was going as designed.
1610379167 2015-10-21 Casing String Witnessed No Violations

-grouted on 10/22/15.

1975065239 2016-01-22 Casing String Witnessed No Violations Nomac Drilling Rig # 71 drilled a 12.25 borehole 580 KB to 2110 KB. Wyoming Casing Services ran 52 joints of 9.625, 40 lb/ft casing, one (1) pup joint, one (1) float shoe, one (1) float collar, one (1) casing hanger , 17 bow spring centralizers and one (1) landing joint. Total tally ran was 2076 set at 2104 KB. Schlumberger cemented with a cement slury consisting of 761 sacks ( 166 barrels ) of Class A. Cement slurry returns were seen in the cellar and were estimated at 37 barrels. Cement weight was verified by scale at 15.3 ppg. After passing the green cement test ( 940 psi to 1500 psi, held for five (5) minutes ) one (1) barrel flowed back and stopped. All floats held. A walk around inspection of the oil based mud, back yard and location did not reveal any violations during this inspection.

For data sources see[10]