X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-029-21027

Well Details

Well ID: 34-029-21027
Loading map...
Country: United States
State: Ohio
County: Columbiana
Municipality: Knox Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID:
Farm/Lease Name: STRYFFELER
License Status: Producing
License Date: 1984-05-01
Spud Date: 1984-07-14
Spud Drilling Contractor: ARMSTRONG DRLG
Final Drill Date: 1984-07-19
Well Total Depth: 5377.00 ft
Configuration: Vertical
Latitude: 40.880000
Longitude: -81.010000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1984-05-01 Issued Date 5/1/84 Expired Date 10/28/84 Acres 0080000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05377 Proposed Drill Depth 05377
Original Spud 1984-07-14
Completed 1984-07-19
Reached Total Depth 1984-07-19
CO 1984-10-03 8 BLAIR BILL INC GeoDate 5/1/84
Construction Permit Expires 1984-10-28
Completion Report Received 1984-11-09
CO 1995-01-19 4659 BALL RESOURCES INC GeoDate 5/1/84
Change of Owner 2001-09-13 Operator changed from 4659, BALL RESOURCES INC to 5894, G & O RESOURCES LTD
Change of Owner 2017-08-11 Operator changed from 5894, G & O RESOURCES LTD to 6288, ALLIANCE PETROLEUM CORPORATION
Record Last Modified 2017-08-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 5181 5300 0
5181 5300 0
2006-09-11 5219 5297 54
5219 5297 54
5181 5300 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 0 500 Gal 0
H2O 0 104580 Gal 85000 FRAC: H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 BLAIR BILL INC 13096.00 1181.00 365
1986 BLAIR BILL INC 9077.00 460.00 365
1987 BLAIR BILL INC 6743.00 299.00 365
1988 BLAIR BILL INC 6962.00 304.00 365
1989 BLAIR BILL INC 6610.00 221.00 365
1990 BLAIR BILL INC 6065.00 154.00 365
1991 BLAIR BILL INC 5506.00 140.00 365
1992 BLAIR BILL INC 5426.00 15307.00 365
1993 BLAIR BILL INC 4068.00 77.00 365
1994 BLAIR BILL INC 2948.00 114.00 365
1995 BALL RESOURCES INC 2971.00 96.00 365
1996 BALL RESOURCES INC 2452.00 74.00 365
1997 BALL RESOURCES INC 2446.00 75.00 365
1998 BALL RESOURCES INC 2216.00 63.00 365
1999 BALL RESOURCES INC 2088.00 75.00 365
2000 BALL RESOURCES INC 2164.00 80.00 365
2001 BALL RESOURCES INC 862.00 0.00 182
2002 G & O RESOURCES LTD 1952.00 62.00 365
2003 G & O RESOURCES LTD 1678.00 62.00 365
2004 G & O RESOURCES LTD 1637.00 104.00 365
2005 G & O RESOURCES LTD 1842.00 44.00 365
2006 G & O RESOURCES LTD 1883.00 75.00 365
2007 G & O RESOURCES LTD 1739.00 63.00 365
2008 G & O RESOURCES LTD 1441.00 34.00 366
2009 G & O RESOURCES LTD 1385.00 67.00 365
2010 G & O RESOURCES LTD 1454.00 54.00 365
2011 G & O RESOURCES LTD 1030.00 44.00 365
2012 G & O RESOURCES LTD 1419.00 0.00 366
2013 G & O RESOURCES LTD 995.00 37.00 365
2014 G & O RESOURCES LTD 1092.00 15.00 365
2015 G & O RESOURCES LTD 752.00 0.00 365
2016 G & O RESOURCES LTD 700.00 0.00 365
2017 G & O RESOURCES LTD 158.00 0.00 365
2018 ALLIANCE PETROLEUM CORPORATION 986.00 30.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 BLAIR BILL INC Brine 333 365
1986 BLAIR BILL INC Brine 80 365
1987 BLAIR BILL INC Brine 60 365
1988 BLAIR BILL INC Brine 80 365
1989 BLAIR BILL INC Brine 160 365
1990 BLAIR BILL INC Brine 80 365
1991 BLAIR BILL INC Brine 100 365
1992 BLAIR BILL INC Brine 133 365
1993 BLAIR BILL INC Brine 103 365
1994 BLAIR BILL INC Brine 45 365
1995 BALL RESOURCES INC Brine 30 365
1996 BALL RESOURCES INC Brine 30 365
1997 BALL RESOURCES INC Brine 79 365
1998 BALL RESOURCES INC Brine 42 365
1999 BALL RESOURCES INC Brine 20 365
2000 BALL RESOURCES INC Brine 20 365
2001 BALL RESOURCES INC Brine 18 182
2002 G & O RESOURCES LTD Brine 20 365
2003 G & O RESOURCES LTD Brine 40 365
2004 G & O RESOURCES LTD Brine 45 365
2005 G & O RESOURCES LTD Brine 43 365
2006 G & O RESOURCES LTD Brine 38 365
2007 G & O RESOURCES LTD Brine 18 365
2008 G & O RESOURCES LTD Brine 20 366
2009 G & O RESOURCES LTD Brine 48 365
2010 G & O RESOURCES LTD Brine 20 365
2011 G & O RESOURCES LTD Brine 107 365
2012 G & O RESOURCES LTD Brine 0 366
2013 G & O RESOURCES LTD Brine 35 365
2014 G & O RESOURCES LTD Brine 18 365
2015 G & O RESOURCES LTD Brine 0 365
2016 G & O RESOURCES LTD Brine 0 365
2017 G & O RESOURCES LTD Brine 18 365
2018 ALLIANCE PETROLEUM CORPORATION Brine 121 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1313047054 2018-8-9 0:00:0 PW No Violations 0.30
0502611071 2005-04-27 Production Wells Violations Noted The tank battery is shared with permit 1028 and consists of 1-210 bbl storage tank, 1-buried concrete salt water tank and a dike. There is contamination inside the dike that needs to be removed.
1117543245 2005-05-27 Production Wells No Violations Contamination removed. Recommend case be resolved.
1313047054 2018-08-09 Production Wells No Violations The purpose of my inspection was to conduct a status check on well #2-1027. RBDMS indicated reported production was current. Access to the well and tank battery remained drivable and stable. Correct identification was present. The 8.625 well head was plumbed above grade and open to atmosphere. The 4.5 production casing was equipped with an electric pump jack. Production valves were in the open position. No leaks were observed. Staining consistent with a legacy operation was present. A domestic supply connection was present. The tank battery was shared with #2-1028. Equipment on location consisted of one (1) horizontal separator, one (1) 210 bbl production tank and one (1) concrete brine vault. The separator remained in good repair and contained a current 7 day chart. A stable earthen dike that was free of fluid was present around the production tanks. The production remained in good repair and contained correct identification. Valves were closed and plugged. The brine vault remained in good repair above grade and was holding fluid with freeboard. Staining consistent with a legacy operation was present adjacent to the vault. The fluid was not fresh or live. No violations were observed during this inspection.
1910386347 2015-12-09 Production Wells No Violations I was on site to conduct a status check. The tank battery is shared between the Stryffeler #3 (#21027) and the Stryffeler #4 (#21028). Identification was posted at the tank battery and the wellhead. The tank battery consists of one 210 bbl production tanks, a concrete brine vault, and one horizontal separator. The tanks valves are sealed with a plug. There is a meter box with a current 24-hour chart showing production. A dike is present. The wellhead is equipped with an electric pumpjack. A domestic supply line is coming off the wellhead. The access road and site are stable.
502611071 2005-4-27 0:00: PW No Violations 0.50

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0502611071 US-OH-125494 2005-04-29 Well operation causing pollution and contamination

For data sources see[9]

References