X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-029-21780

Well Details

Well ID: 34-029-21780
Loading map...
Country: United States
State: Ohio
County: Columbiana
Municipality: Franklin Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000640
Farm/Lease Name: BRICELAND TRUST 24-14-4
License Status: Producing
License Date: 2014-01-02
Spud Date: 2013-03-13
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-01-26
Well Total Depth: 20377.00 ft
Configuration: Horizontal
Latitude: 40.680000
Longitude: -80.870000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-03-07 Proposed Formations:POINT PLEASANT, Issued Date:3/7/2013, Expired Date:3/7/2015 12:00:00 PM, Drilling unit acres:143.45, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2014-01-02 Proposed Formations:POINT PLEASANT, Issued Date:1/2/2014, Expired Date:1/2/2016 12:00:00 PM, Drilling unit acres:312.31, Proposed Well Type:OG, Proposed Well Class:EOUT
Correction to Well 2014-01-17 CORRECTION TO SURFACE FOOTAGE.
Reached Total Depth 2014-01-26
Correction to Well 2014-02-07 CHANGE IN PROPOSED TOTAL DEPTH.
Completion Report Received 2014-09-26
Correction to Well 2015-01-16 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 280.76 ACRES.
Construction Permit Expires 2016-01-02
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-08-11 8779 20171 0
8779 20171 0
8779 20171 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/15/2014 06/23/2014 8017 9,794,440.0 783437

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1
A264, B244, B317, J218, J475, J580,

J609, J610, L058, Acid, Hydrochloric 15pct, Northern White Sand, 100 Mesh Sand

SCHLUMBERGER Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor Glycerol 56-81-5 0.06 0.00908 0
Alkenes, C>10 a- 64743-02-8 0 0.00009000 0
Fatty acids, tall-oil 61790-12-3 0 0.00051 0
Octamethylcyclotetrasiloxane 556-67-2 0 0 0
Decamethyl cyclopentasiloxane 541-02-6 0 0 0
Polymer of 2-acrylamido-2-methylpropanesulfonic

acid sodium salt and methyl acrylate

136793-29-8 0 0.00042 0
Copper(II) sulfate 7758-98-7 0 0 0
Guar gum 9000-30-0 0.51 0.07927 0
Methanol 67-56-1 0 0.0007 0
poly(tetrafluoroethylene) 9002-84-0 0 0.00001000 0
Crystalline silica 14808-60-7 97.7 15.2572 0
Acrylamide, 2-acrylamido-2-methylpropanesulfonic

acid, sodium salt polymer

38193-60-1 0.03 0.00394 0
Non-crystalline silica 7631-86-9 0 0.00027 0
Diammonium peroxidisulphate 7727-54-0 0.02 0.00263 0
Prop-2-yn-1-ol 107-19-7 0 0.00013 0
Sodium erythorbate 6381-77-7 0 0.0007 0
Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen

phosphate), sodium salt

68171-29-9 0.01 0.00176 0
Trisodium ortho phosphate 7601-54-9 0 0.00077 0
Hydrogen chloride 7647-01-0 1.41 0.21989 0
Dimethyl siloxanes and silicones 63148-62-9 0 0 0
2-propenamid 79-06-1 0 0.00001000 0
Magnesium silicate hydrate (talc) 14807-96-6 0 0.00001000 0
Dodecamethylcyclohexasiloxane 540-97-6 0 0 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0 0.00001000 0
Siloxanes and Silicones, di-Me,

reaction products with silica

67762-90-7 0 0 0
Potassium hydroxide 1310-58-3 0.07 0.01029 0
Urea 57-13-6 0 0.00026 0
Glutaraldehyde 111-30-8 0.04 0.00575 0
Potassium borate 1332-77-0 0.18 0.02785 0
Sodium sulfate 7757-82-6 0 0.00006000 0
Alcohols, C14-15, ethoxylated (7EO) 68951-67-7 0 0.0002 0
Ethane-1,2-diol 107-21-1 0 0.00022 0
Vinylidene chloride/methylacrylate copolymer 25038-72-6 0 0.00045 0
Ammonium sulfate 7783-20-2 0.03 0.00534 0
Thiourea, polymer with formaldehyde and 1-phenylethanone 68527-49-1 0 0.00042 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 5.39364 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 78.9218 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-06-21 H2O 15 1994 Bbl 331835 Schlumberger STAGE 28

30 SHOTS

2014-06-23 H2O 15 2023 Bbl 338221 Schlumberger STAGE 41

30 SHOTS

2014-06-23 H2O 15 1962 Bbl 336741 Schlumberger STAGE 40

30 SHOTS

2014-06-19 H2O 15 2054 Bbl 326220 Schlumberger STAGE 19

30 SHOTS

2014-06-20 H2O 15 1997 Bbl 335761 Schlumberger STAGE 22

30 SHOTS

2014-06-19 H2O 15 2001 Bbl 334801 Schlumberger STAGE 17

30 SHOTS

2014-06-21 H2O 15 1993 Bbl 330541 Schlumberger STAGE 30

30 SHOTS

2014-06-16 H2O 15 2224 Bbl 330980 Schlumberger STAGE 7

30 SHOTS

2014-06-22 H2O 15 2007 Bbl 325420 Schlumberger STAGE 34

30 SHOTS

2014-06-18 H2O 15 1997 Bbl 331541 Schlumberger STAGE 12

30 SHOTS

2014-06-15 H2O 15 2321 Bbl 332241 Schlumberger STAGE 3

30 SHOTS

2014-06-17 H2O 15 2383 Bbl 333320 Schlumberger STAGE 10

30 SHOTS

2014-06-17 H2O 15 2038 Bbl 333301 Schlumberger STAGE 11

30 SHOTS

2014-06-17 H2O 15 2222 Bbl 337900 Schlumberger STAGE 8

30 SHOTS

2014-06-19 H2O 15 2019 Bbl 322581 Schlumberger STAGE 16

30 SHOTS

2014-06-22 H2O 15 1994 Bbl 329521 Schlumberger STAGE 33

30 SHOTS

2014-06-23 H2O 15 1974 Bbl 327881 Schlumberger STAGE 39

30 SHOTS

2014-06-21 H2O 15 2027 Bbl 328321 Schlumberger STAGE 31

30 SHOTS

2014-06-20 H2O 15 1993 Bbl 328160 Schlumberger STAGE 24

30 SHOTS

2014-06-19 H2O 15 1991 Bbl 327061 Schlumberger STAGE 18

30 SHOTS

2014-06-21 H2O 15 2031 Bbl 333400 Schlumberger STAGE 32

30 SHOTS

2014-06-18 H2O 15 2034 Bbl 331021 Schlumberger STAGE 14

30 SHOTS

2014-06-21 H2O 15 1991 Bbl 328000 Schlumberger STAGE 29

30 SHOTS

2014-06-15 H2O 15 2432 Bbl 334900 Schlumberger STAGE 2

30 SHOTS

2014-06-16 H2O 15 2353 Bbl 332540 Schlumberger STAGE 4

30 SHOTS

2014-06-20 H2O 15 2042 Bbl 331601 Schlumberger STAGE 26

30 SHOTS

2014-06-20 H2O 15 2044 Bbl 322321 Schlumberger STAGE 25

30 SHOTS

2014-06-20 H2O 15 3189 Bbl 332441 Schlumberger STAGE 21

30 SHOTS

2014-06-18 H2O 15 1999 Bbl 329841 Schlumberger STAGE 13

30 SHOTS

2014-06-20 H2O 15 1997 Bbl 330349 Schlumberger STAGE 23

30 SHOTS

2014-06-23 H2O 15 2333 Bbl 336761 Schlumberger STAGE 42

30 SHOTS

2014-06-16 H2O 15 2220 Bbl 336760 Schlumberger STAGE 6

30 SHOTS

2014-06-20 H2O 15 2042 Bbl 332901 Schlumberger STAGE 27

30 SHOTS

2014-06-23 H2O 15 2000 Bbl 335261 Schlumberger STAGE 37

30 SHOTS

2014-06-16 H2O 15 2147 Bbl 331620 Schlumberger STAGE 5

30 SHOTS

2014-06-22 H2O 15 1991 Bbl 329181 Schlumberger STAGE 35

30 SHOTS

2014-06-23 H2O 15 1990 Bbl 334080 Schlumberger STAGE 38

30 SHOTS

2014-06-18 H2O 15 2042 Bbl 328441 Schlumberger STAGE 15

30 SHOTS

2014-06-22 H2O 15 1995 Bbl 328541 Schlumberger STAGE 36

30 SHOTS

2014-06-17 H2O 15 2215 Bbl 33620 Schlumberger STAGE 9

30 SHOTS

2014-06-15 H2O 15 2921 Bbl 335060 Schlumberger STAGE 1

30 SHOTS

2014-06-19 H2O 15 2023 Bbl 330321 Schlumberger STAGE 20

30 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC 355627 1177 137
2015 CHESAPEAKE EXPLORATION LLC 1313746 371 305
2016 CHESAPEAKE EXPLORATION LLC 929150 53 366
2017 CHESAPEAKE EXPLORATION LLC 657561 79 365
2018 CHESAPEAKE EXPLORATION LLC 523234 24 364
2019 CHESAPEAKE EXPLORATION LLC 114273 6 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC Brine 20408 137
2015 CHESAPEAKE EXPLORATION LLC Brine 18594 305
2016 CHESAPEAKE EXPLORATION LLC Brine 9248 366
2017 CHESAPEAKE EXPLORATION LLC Brine 5800 365
2018 CHESAPEAKE EXPLORATION LLC Brine 4767 364
2019 CHESAPEAKE EXPLORATION LLC Brine 1526 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-2112932451 2013-3-13 0:00: DD No Violations
-99741324 2017-1-24 0:00: PW No Violations 1.50
0099741324 2017-01-24 Production Wells No Violations The purpose for my inspection was to conduct a status check on well #2-1780-00-
0164126497 2014-12-11 Preliminary Restoration No Violations

-lined and sealed secondary containment. There are concrete barriers protecting the containment from vehicles. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Along the interior of the chain link fence there are two site drains installed. There is an earthen berm, with well-established ground cover. The soil stockpile is well stabilized with vegetation. Crops, woodlands and/or underbrush are growing normally outside the area of disturbance. Drainage and erosion controls outside the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. Preliminary restoration is complete and has passed inspection.

0437965408 2016-03-29 Production Wells No Violations I was on location for a status check. My inspection found the access road gate locked and the

access road is in good repair. An identification sign at the access road entrance, well, and tank battery. The pad is fenced and all man doors are locked. The #5H well is in production. The well is equipped with a christmas tree valve assembly. There is a steel dike around the tank battery. The equipment on the pad consists of the following: 3 - Storage tanks 400 bbl 2 - Gas processing units (GPU) 2 - Sand separators 1 - Thermal electric generator 2 - Producing wells Site fenced and man doors locked

1340553935 2014-01-13 Casing String Witnessed No Violations
1390314694 2014-01-10 Drill / Deepen / Reopen No Violations I went to the site and had a pre-spud meeting with drilling consultant Dustin Sconyers.
164126497 2014-12-11 0:00 PL No Violations
2084096396 2012-12-11 Surface Facility Construction No Violations I went to the site and conducted a pre-construction site inspection with Brett Bell, Chesapeake Field Representative.
2112932451 2013-03-13 Drill / Deepen / Reopen No Violations I was at the site to check the progress on the conductor drilling operation. Express Drilling was on location and in the process of drilling the conductor hole for the Briceland Trust 8H. Once the 8H conductor hole was completed and casing installed, then the rig would move to the 5H and begin the conductor hole.
437965408 2016-3-29 0:00: PW No Violations

For data sources see[10]

References