X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-029-21805

Well Details

Well ID: 34-029-21805
Loading map...
Country: United States
State: Ohio
County: Columbiana
Municipality: Hanover Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000716
Farm/Lease Name: JUDY BROWN 27-15-4
License Status: Producing
License Date: 2013-09-16
Spud Date: 2013-09-04
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2013-11-13
Well Total Depth: 12912.00 ft
Configuration: Horizontal
Latitude: 40.740000
Longitude: -80.900000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-01 Proposed Formations:TRENTON BLACK RIVER, Issued Date:5/1/2013, Expired Date:5/1/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2013-09-16 Proposed Formations:POINT PLEASANT, Issued Date:9/16/2013, Expired Date:9/16/2015 12:00:00 PM, Drilling unit acres:140.92, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-11-13
Correction to Well 2014-03-07 CORRECTION TO TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 127.16 ACRES.
Completion Report Received 2014-11-20
Construction Permit Expires 2015-09-16
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-07-25 8085 11270 612
8085 11270 612
8085 11270 612

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/20/2014 04/23/2014 7832 4,085,000.0 316192

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1
Acid, Hydrochloric 15pct, A264,

B244, B317, J218, J475, J580, J609, J610, L058, Northern White Sand, 100 Mesh Sand

SCHLUMBERGER Acid, Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Proppant - Natural Potassium borate 1332-77-0 0.14 0.02079 0
Ammonium sulfate 7783-20-2 0.06 0.00878 0
Glycerol 56-81-5 0.05 0.00678 0
Decamethyl cyclopentasiloxane 541-02-6 0 0.00001000 0
Siloxanes and Silicones, di-Me,

reaction products with silica

67762-90-7 0 0.00001000 0
Prop-2-yn-1-ol 107-19-7 0 0.00012 0
2-propenamid 79-06-1 0 0.00002000 0
Alcohols, C14-15, ethoxylated (7EO) 68951-67-7 0 0.00018 0
Vinylidene chloride/methylacrylate copolymer 25038-72-6 0 0.00045 0
Ethane-1,2-diol 107-21-1 0 0.00022 0
Guar gum 9000-30-0 0.51 0.07522 0
Acrylamide, 2-acrylamido-2-methylpropanesulfonic

acid, sodium salt polymer

38193-60-1 0.04 0.00648 0
Copper(II) sulfate 7758-98-7 0 0.00001000 0
Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen

phosphate), sodium salt

68171-29-9 0.01 0.00177 0
Dimethyl siloxanes and silicones 63148-62-9 0 0.00001000 0
Octamethylcyclotetrasiloxane 556-67-2 0 0.00001000 0
Thiourea, polymer with formaldehyde and 1-phenylethanone 68527-49-1 0 0.00038 0
Glutaraldehyde 111-30-8 0.04 0.00554 0
Fatty acids, tall-oil 61790-12-3 0 0.00046 0
Crystalline silica 14808-60-7 97.77 14.5039 0
Polymer of 2-acrylamido-2-methylpropanesulfonic

acid sodium salt and methyl acrylate

136793-29-8 0 0.00069 0
Trisodium ortho phosphate 7601-54-9 0.01 0.00078 0
Sodium erythorbate 6381-77-7 0 0.00063 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0 0.00001000 0
Magnesium silicate hydrate (talc) 14807-96-6 0 0.00001000 0
Potassium hydroxide 1310-58-3 0.05 0.00768 0
Non-crystalline silica 7631-86-9 0 0.00029 0
Urea 57-13-6 0 0.00043 0
poly(tetrafluoroethylene) 9002-84-0 0 0.00001000 0
Methanol 67-56-1 0 0.00063 0
Hydrogen chloride 7647-01-0 1.34 0.19828 0
Water 007732-18-5 100 0.54831 0
Dodecamethylcyclohexasiloxane 540-97-6 0 0.00001000 0
Alkenes, C>10 a- 64743-02-8 0 0.00008000 0
Sodium sulfate 7757-82-6 0 0.0001 0
Diammonium peroxidisulphate 7727-54-0 0.02 0.00253 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 84.6174 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-04-20 H2O 15 2493 Bbl 325360 Schlumberger STAGE 1/17

36 SHOTS STAGES 2-16 SEE IMAGES

2014-04-23 H2O 15 2274 Bbl 339340 Schlumberger STAGE 17/17

36 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC 278852 6229 98
2015 CHESAPEAKE EXPLORATION LLC 465367 5859 364
2016 CHESAPEAKE EXPLORATION LLC 321013 2771 366
2017 CHESAPEAKE EXPLORATION LLC 251227 1840 365
2018 CHESAPEAKE EXPLORATION LLC 213265 1251 365
2019 CHESAPEAKE EXPLORATION LLC 47432 264 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC Brine 5162 98
2015 CHESAPEAKE EXPLORATION LLC Brine 5162 364
2016 CHESAPEAKE EXPLORATION LLC Brine 1610 366
2017 CHESAPEAKE EXPLORATION LLC Brine 1274 365
2018 CHESAPEAKE EXPLORATION LLC Brine 1639 365
2019 CHESAPEAKE EXPLORATION LLC Brine 293 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-123249474 2017-2-1 0:00:0 PW No Violations 1.60
-2143033912 2013-4-17 0:00: SC No Violations
-553059832 2013-11-14 0:00 CS No Violations
-786706718 2017-8-30 0:00: PW No Violations 0.50
-836266621 2013-11-8 0:00: DD No Violations
0123249474 2017-02-01 Production Wells No Violations The purpose for my inspection was to conduct a status check on well #2-1805-00-00. RBDMS indicates the operator is current with reporting production. The lease entrance is marked with a sign board containing signs reporting required well identification and emergency response information. The lease road showed signs of channelized erosion but remained stable and drivable. No signs of erosion were observed adjacent to the road traveling to the pad. The soil stockpile was stabilized with well-
0225811777 2013-11-06 Casing String Witnessed No Violations
0276465650 2014-10-24 Preliminary Restoration No Violations

-lined and sealed secondary containment. There are concrete barriers protecting the containment from vehicles. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Along the interior of the chain link fence there is a site drain installed. The soil stockpile is well stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. Preliminary restoration is complete and approved.

0553059832 2013-11-14 Casing String Witnessed No Violations

-based mud used to drill and condition the hole, a lead cement followed by a tail cement were pumped. The Mudpush spacer was mudscaled at 12.5 pounds per gallon (ppg). Schlumberger pumped 261.7 bbls of lead cement at 13.5 ppg, and 261.6 bbls of tail cement at 15.0 ppg. The plug was dropped and displaced with 286.5 bbls of water as measured by pump truck tanks. The plug bumped the float collar at 7:06pm on 11/14/2013. The plug landing pressure was 2370 psi, and it was raised to 3343 psi, and held for 5 minutes. Pressure fell slightly to 3309 psi. The float held when the pressure was released. 3.0 bbls of water bled back. Neither slurry nor spacer returned to surface.

0611148086 2013-07-23 Surface Facility Construction No Violations I went to the site to review the construction process of the drilling pad. The access road is complete. The road has a crushed limestone surface, and erosion controls are in place. The area of disturbance is seeded and covered with straw. There is a gate with a padlock at the access road entrance. The pad is complete. There is a berm and a chain link fence surrounding the site. There is a padlocked gate in the fence. The area of disturbance and the soil stockpiles have been stabilized. There are two cellars installed at the pad denoted as the Judy Brown 3H and 6H. Each is surrounded by a bull fence to prevent falls. Additionally, two site drains to control precipitation on the pad have been installed.
0786706718 2017-08-30 Production Wells No Violations The purpose of my inspection was to conduct a status check on well #2-1805. The access road, pad and erosion and sedimentation controls were in good repair. The security fence was locked. No signs of vandalism were observed. Correct identification was present. The well head was protected by concrete jersey barriers. The cellar was backfiled with gravel. Annular pressure gauges were plumbed above grade and identified. The 9.625 and 5.5 valves were open. The gauges indicated 0 psi on each valve. No leaks were observed. Production equipment on the pad consisted of a well specific sand knock out and GPU. Common equipment consisted of one (1) hydrate inhibitor tank, one (1) thermal generator, and one (1) meter run and one (1) VRU. The tank battery consisted of three (3) 400 bbl produced water tanks, three (3) 400 bbl condensate tanks. The tank were inside an impervious lined steel containment. Valves were closed and plugged. The containment was holding fresh water. No violations were observed during this inspection.
0836266621 2013-11-08 Drill / Deepen / Reopen No Violations
0905550400 2013-11-04 Casing String Witnessed No Violations
1316569684 2013-09-05 Casing String Witnessed No Violations I witnessed the cementing of the conductor casing. Express Energy Services drilled a 26 diameter hole to 120. Express installed 120 of 20 OD casing. During drilling, the borehole got damp at an approximate depth of 80, but did not produce much water. Allied Oil & Gas Services was the cementing contractor. The cement slurry was mudscaled at 15.6 pounds per gallon (ppg). Allied pumped 52.4 bbls of cement slurry at 15.6 ppg. The cement was displaced with 39 bbls of water. An estimated 15 bbls of cement slurry returned to surface. Displacement was completed at 1:28pm.
1384272283 2013-11-04 Drill / Deepen / Reopen No Violations
1406728058 2014-05-20 Production Wells No Violations I stopped by the site to check on the status of well completion and restoration. The well has been hydraulically fractured. At this time a work over rig is installing 2-7/8 tubing. Production equipment is on site but not hooked up. I didnot walk the entire site due to the active. All erosion and sedimentation controls, and drainage controls appear to be functioning. Ground cover is well established along the access road and around the drilling pad. No areas of erosion are present. Preliminary restoration approval will not be finalized pending installation of production equipment.
1813027455 2013-09-03 Drill / Deepen / Reopen No Violations I stopped at the drilling pad to check on the conductor rig move-in progress. I found pipe trucks from Express Energy Services on site. Express personnel told me that the rig was expected shortly.
2143033912 2013-04-17 Surface Facility Construction No Violations I went to the site and conducted a pre-construction site inspection with Steve Ault, Chesapeake Field Representative.
225811777 2013-11-6 0:00: CS No Violations
276465650 2014-10-24 0:00 PL No Violations
611148086 2013-7-23 0:00: SC No Violations
905550400 2013-11-4 0:00: CS No Violations

For data sources see[10]

References