If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-031-22978 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.4,"lon":-82,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Coshocton | |
| Municipality: Monroe Township | |
| Operator Name: MASON PRODUCING INC | |
| Well Pad ID: | |
| Farm/Lease Name: BRILLHART ELVIN R | |
| License Status: Final Restoration | |
| License Date: 2014-05-14 | |
| Spud Date: 1977-05-02 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 1977-07-12 | |
| Well Total Depth: 3661.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.400000 | |
| Longitude: -82.000000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1977-04-21 | 1983 MASON DRILLING INC GeoDate 4/21/77 |
| Original Spud | 1977-05-02 | |
| Completed | 1977-07-12 | |
| Reached Total Depth | 1977-07-12 | |
| Change of Owner | 2002-12-30 | Operator changed from 1983, MASON DRILLING INC to 7333, MASON PRODUCING |
| APP | 2014-05-14 | Proposed Formations:CLINTON, Issued Date:5/14/2014, Expired Date:5/13/2016 12:00:00 PM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class: |
| Plugged/Abandoned | 2014-06-24 | |
| Construction Permit Expires | 2016-05-13 | |
| Record Last Modified | 2017-02-10 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2006-09-11 | 3587 | 3630 | 16 |
| 3587 | 3630 | 16 | |
| 3587 | 3630 | 16 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 1000 Bbl | 25000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1984 | MASON JOHN C | 4048.00 | 1156.00 | 0 |
| 1985 | MASON JOHN C | 3466.00 | 1223.00 | 365 |
| 1986 | MASON DRILLING INC | 4225.00 | 950.00 | 365 |
| 1987 | MASON DRILLING INC | 4458.00 | 817.00 | 365 |
| 1988 | MASON DRILLING INC | 3557.00 | 675.00 | 365 |
| 1989 | MASON DRILLING INC | 3056.00 | 669.00 | 365 |
| 1990 | MASON DRILLING INC | 2184.00 | 506.00 | 365 |
| 1991 | MASON DRILLING INC | 6124.00 | 1162.00 | 365 |
| 1992 | MASON DRILLING INC | 1655.00 | 335.00 | 365 |
| 1993 | MASON DRILLING INC | 951.00 | 236.00 | 365 |
| 1994 | MASON DRILLING INC | 943.00 | 232.00 | 365 |
| 1995 | MASON DRILLING INC | 925.00 | 229.00 | 365 |
| 1996 | MASON DRILLING INC | 789.00 | 180.00 | 365 |
| 1997 | MASON DRILLING INC | 770.00 | 152.00 | 365 |
| 1998 | MASON DRILLING INC | 630.00 | 105.00 | 365 |
| 1999 | MASON DRILLING INC | 514.00 | 108.00 | 365 |
| 2000 | MASON DRILLING INC | 433.00 | 103.00 | 0 |
| 2001 | MASON DRILLING INC | 406.00 | 86.00 | 365 |
| 2002 | MASON PRODUCING INC | 90.00 | 0.00 | 31 |
| 2003 | MASON DRILLING INC | 0.00 | 0.00 | 365 |
| 2004 | MASON PRODUCING INC | 624.00 | 137.00 | 365 |
| 2005 | MASON PRODUCING INC | 517.00 | 144.00 | 365 |
| 2006 | MASON PRODUCING INC | 686.00 | 106.00 | 365 |
| 2007 | MASON PRODUCING INC | 513.00 | 93.00 | 365 |
| 2008 | MASON PRODUCING INC | 449.00 | 71.00 | 366 |
| 2009 | MASON PRODUCING INC | 413.00 | 71.00 | 365 |
| 2010 | MASON PRODUCING INC | 412.00 | 73.00 | 365 |
| 2011 | MASON PRODUCING INC | 367.00 | 72.00 | 365 |
| 2012 | MASON PRODUCING INC | 377.00 | 72.00 | 366 |
| 2013 | MASON PRODUCING INC | 305.00 | 37.00 | 365 |
| 2014 | MASON PRODUCING INC | 494.00 | 58.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1984 | MASON JOHN C | Brine | 0 | 0 |
| 1985 | MASON JOHN C | Brine | 9 | 365 |
| 1986 | MASON DRILLING INC | Brine | 8 | 365 |
| 1987 | MASON DRILLING INC | Brine | 21 | 365 |
| 1988 | MASON DRILLING INC | Brine | 18 | 365 |
| 1989 | MASON DRILLING INC | Brine | 0 | 365 |
| 1990 | MASON DRILLING INC | Brine | 8 | 365 |
| 1991 | MASON DRILLING INC | Brine | 27 | 365 |
| 1992 | MASON DRILLING INC | Brine | 6 | 365 |
| 1993 | MASON DRILLING INC | Brine | 4 | 365 |
| 1994 | MASON DRILLING INC | Brine | 6 | 365 |
| 1995 | MASON DRILLING INC | Brine | 5 | 365 |
| 1996 | MASON DRILLING INC | Brine | 3 | 365 |
| 1997 | MASON DRILLING INC | Brine | 2 | 365 |
| 1998 | MASON DRILLING INC | Brine | 4 | 365 |
| 1999 | MASON DRILLING INC | Brine | 77 | 365 |
| 2000 | MASON DRILLING INC | Brine | 0 | |
| 2001 | MASON DRILLING INC | Brine | 0 | 365 |
| 2002 | MASON DRILLING INC | Brine | 1 | 334 |
| 2003 | MASON DRILLING INC | Brine | 0 | 365 |
| 2004 | MASON PRODUCING INC | Brine | 9 | 365 |
| 2005 | MASON PRODUCING INC | Brine | 0 | 365 |
| 2006 | MASON PRODUCING INC | Brine | 0 | 365 |
| 2007 | MASON PRODUCING INC | Brine | 3 | 365 |
| 2008 | MASON PRODUCING INC | Brine | 0 | 366 |
| 2009 | MASON PRODUCING INC | Brine | 3 | 365 |
| 2010 | MASON PRODUCING INC | Brine | 0 | 365 |
| 2011 | MASON PRODUCING INC | Brine | 0 | 365 |
| 2012 | MASON PRODUCING INC | Brine | 0 | 366 |
| 2013 | MASON PRODUCING INC | Brine | 0 | 365 |
| 2014 | MASON PRODUCING INC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1362571405 | 2014-6-23 0:00: | PB | No Violations | |
| -1561121538 | 2009-1-2 0:00:0 | PW | No Violations | |
| -40624581 | 2011-4-8 0:00:0 | PW | No Violations | |
| -697038726 | 2005-2-9 0:00:0 | PW | No Violations | |
| -956266961 | 2014-6-17 0:00: | PB | No Violations | |
| 0040624581 | 2011-04-08 | Production Wells | No Violations | Rain most of the day. Pumping well equipped for production. |
| 0529713460 | 2014-06-24 | Plug / Plug Back | No Violations | On the day of my inspection I found that the clay had fallen approximately 100 feet. Wheeler shoveled another 2 tons in the well to fill it to surface. Then they cut the casing off 36 below grade and capped it with a steel plate inscribed with the permit number. |
| 0697038726 | 2005-02-09 | Production Wells | No Violations | Well in production . |
| 0809765106 | 2015-07-24 | Final Restoration | No Violations | On the day of my inspection I found that the well site and lease road were both growing with well established grass. This site passes final restoration. |
| 0956266961 | 2014-06-17 | Plug / Plug Back | No Violations | On the day of my inspection I found that Mike Wheeler was rigged up on the well, pulling rods and tubing. We met to discuss plans for plugging the well. |
| 1362571405 | 2014-06-23 | Plug / Plug Back | No Violations | On the day of my inspection Mike Wheeler washed approximately 5 tons of clay down the well filling it to surface. The clay was allowed to settle for an hour and one more ton was added, filling the well to surface again. The clay will be allowed to settle overnight and topped off in the morning. |
| 1403184161 | 2014-06-18 | Plug / Plug Back | No Violations | On the day of my inspection Mike Wheeler washed 4 tons of clay down the 4.5 casing for a bottom plug through the Clinton sandstone. Then they ripped the 4.5 casing at 2780. They pulled one joint and shut down for the day to let the clay settle. |
| 1403286433 | 2014-06-19 | Plug / Plug Back | No Violations | On the day of my inspection Mike Wheeler pulled the 4.5 casing from the well. They set a brush and stone bridge at 1100 and washed 5 tons of clay down the well to set a plug through the Berea sandstone. Then Wheeler welded a collar on the 8.625 casing and pulled till it came free. |
| 1403541114 | 2014-06-20 | Plug / Plug Back | No Violations | Mike Wheeler reported that they pulled all of the 8.625 casing from the well, and set a pre-cast cement plug on the 8 seat at 558. |
| 1561121538 | 2009-01-02 | Production Wells | No Violations | Well capable of production . |
| 1882884499 | 2015-04-30 | Final Restoration | No Violations | On the day of my inspection I found that the well site was graded out and approximately 85% covered in short grasses. The tank battery is still in use for permit 4574. The lease road was still in place. I called Mason Producing and left a message that they need to get a landowner waiver (form 5) filled out, or reclaim the lease road. |
| 529713460 | 2014-6-24 0:00: | PB | No Violations | |
| 809765106 | 2015-7-24 0:00: | FR | No Violations |
For data sources see[9]