If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-031-24089 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.42,"lon":-81.98,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Coshocton | |
Municipality: Clark Township | |
Operator Name: MASON PRODUCING INC | |
Well Pad ID: | |
Farm/Lease Name: CONRAD & LOIS MILLER | |
License Status: Final Restoration | |
License Date: 2013-06-12 | |
Spud Date: 1980-10-21 | |
Spud Drilling Contractor: | |
Final Drill Date: 1980-12-01 | |
Well Total Depth: 3670.00 ft | |
Configuration: Vertical | |
Latitude: 40.420000 | |
Longitude: -81.980000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1980-10-14 | 1983 MASON DRILLING INC GeoDate 10/14/80 |
Original Spud | 1980-10-21 | |
Completed | 1980-12-01 | |
Reached Total Depth | 1980-12-01 | |
APP | 2013-06-12 | Proposed Formations:CLINTON, Issued Date:6/12/2013, Expired Date:6/12/2015 12:00:00 PM, Drilling unit acres:100, Proposed Well Type:OG, Proposed Well Class: |
Change of Owner | 2013-07-10 | Operator changed from 1983, MASON DRILLING INC to 7333, MASON PRODUCING |
Plugged/Abandoned | 2013-09-20 | |
Construction Permit Expires | 2015-06-12 | |
Record Last Modified | 2017-02-10 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3616 | 3654 | 15 |
3616 | 3654 | 15 | |
3616 | 3654 | 15 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1000 Bbl | 25000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | MASON JOHN C | 3143.00 | 383.00 | 0 |
1985 | MASON JOHN C | 2471.00 | 257.00 | 365 |
1986 | MASON DRILLING INC | 1583.00 | 203.00 | 365 |
1987 | MASON DRILLING INC | 2014.00 | 257.00 | 365 |
1988 | MASON DRILLING INC | 2093.00 | 155.00 | 365 |
1989 | MASON DRILLING INC | 1529.00 | 153.00 | 365 |
1990 | MASON DRILLING INC | 1284.00 | 127.00 | 365 |
1992 | MASON DRILLING INC | 837.00 | 92.00 | 365 |
1993 | MASON DRILLING INC | 563.00 | 76.00 | 365 |
1994 | MASON DRILLING INC | 954.00 | 52.00 | 365 |
1995 | MASON DRILLING INC | 1046.00 | 52.00 | 365 |
1996 | MASON DRILLING INC | 372.00 | 73.00 | 365 |
1997 | MASON DRILLING INC | 443.00 | 50.00 | 365 |
1998 | MASON DRILLING INC | 666.00 | 54.00 | 365 |
1999 | MASON DRILLING INC | 616.00 | 53.00 | 365 |
2000 | MASON DRILLING INC | 576.00 | 26.00 | 0 |
2001 | MASON DRILLING INC | 508.00 | 115.00 | 365 |
2002 | MASON PRODUCING INC | 22.00 | 0.00 | 31 |
2003 | MASON DRILLING INC | 0.00 | 0.00 | 365 |
2004 | MASON PRODUCING INC | 259.00 | 24.00 | 365 |
2005 | MASON PRODUCING INC | 226.00 | 49.00 | 365 |
2006 | MASON PRODUCING INC | 294.00 | 46.00 | 365 |
2007 | MASON PRODUCING INC | 287.00 | 25.00 | 365 |
2008 | MASON PRODUCING INC | 488.00 | 45.00 | 366 |
2009 | MASON PRODUCING INC | 396.00 | 24.00 | 365 |
2010 | MASON PRODUCING INC | 345.00 | 41.00 | 365 |
2011 | MASON PRODUCING INC | 197.00 | 23.00 | 365 |
2013 | MASON PRODUCING INC | 134.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | MASON JOHN C | Brine | 0 | 0 |
1985 | MASON JOHN C | Brine | 8 | 365 |
1986 | MASON DRILLING INC | Brine | 12 | 365 |
1987 | MASON DRILLING INC | Brine | 27 | 365 |
1988 | MASON DRILLING INC | Brine | 17 | 365 |
1989 | MASON DRILLING INC | Brine | 9 | 365 |
1990 | MASON DRILLING INC | Brine | 14 | 365 |
1992 | MASON DRILLING INC | Brine | 7 | 365 |
1993 | MASON DRILLING INC | Brine | 2 | 365 |
1994 | MASON DRILLING INC | Brine | 5 | 365 |
1995 | MASON DRILLING INC | Brine | 10 | 365 |
1996 | MASON DRILLING INC | Brine | 4 | 365 |
1997 | MASON DRILLING INC | Brine | 17 | 365 |
1998 | MASON DRILLING INC | Brine | 9 | 365 |
1999 | MASON DRILLING INC | Brine | 2 | 365 |
2000 | MASON DRILLING INC | Brine | 10 | |
2001 | MASON DRILLING INC | Brine | 0 | 365 |
2002 | MASON DRILLING INC | Brine | 6 | 334 |
2003 | MASON DRILLING INC | Brine | 0 | 365 |
2004 | MASON PRODUCING INC | Brine | 3 | 365 |
2005 | MASON PRODUCING INC | Brine | 0 | 365 |
2006 | MASON PRODUCING INC | Brine | 0 | 365 |
2007 | MASON PRODUCING INC | Brine | 8 | 365 |
2008 | MASON PRODUCING INC | Brine | 2 | 366 |
2009 | MASON PRODUCING INC | Brine | 3 | 365 |
2010 | MASON PRODUCING INC | Brine | 0 | 365 |
2011 | MASON PRODUCING INC | Brine | 6 | 365 |
2013 | MASON PRODUCING INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1423835204 | 2013-9-18 0:00: | PB | No Violations | |
0356780482 | 2013-09-20 | Plug / Plug Back | No Violations | On the day of my inspection I found that the clay was sitting firm at the surface. Mike Wheeler was in the process of draining the pit and preparing to cut the casing off and cap the well. |
1005235173 | 2013-09-19 | Plug / Plug Back | No Violations | On the day of my inspection Mike Wheeler reported that he set a brush and stone bridge at 1100 and then washed 4 tons of clay into the hole. They pulled all of the 8.625 casing and set a pre cast cement plug at 533. The hole stared to produce some oil when they were washing clay in on the pre cast. Mike Wheeler bailed approximately 00 barrels of oil and then washed another 6 tons of clay into the well to fill it to surface. It will be allowed to settle overnight. |
1179426820 | 2007-05-17 | Production Wells | No Violations | Well capable of production . |
1379523166 | 2013-09-17 | Plug / Plug Back | No Violations | On the day of my inspection Mike Wheeler pulled rods and tubing. Then washed 2 tons of clay down the 4.5 casing. They ripped the 4.5 casing at 3350 and pulled 20 joints. |
1415958596 | 2014-06-17 | Final Restoration | No Violations | On the day of my inspection I found that the site was approximately 75% covered in short grasses. I found no signs of erosion or sedimentation. There were no oil & gas related materials or debris at the location. The lease road and tank battery are still in use for permits 3866 and 3988. |
1423835204 | 2013-09-18 | Plug / Plug Back | No Violations | On the day of my inspection Mike Wheeler washed 8 tons of clay down the 4.5 casing and pulled the remaining casing from the well. |
356780482 | 2013-9-20 0:00: | PB | No Violations |
For data sources see[9]